heber city public works facility expansion
play

Heber City Public Works Facility Expansion PUBLIC HEARING - PowerPoint PPT Presentation

Heber City Public Works Facility Expansion PUBLIC HEARING PRESENTATION 1/19/2017 Roles of Municipal Government Cemetery Services Law Enforcement/Police Services Airports Road Construction & Maintenance Solid Waste Collection & Disposal


  1. Heber City Public Works Facility Expansion PUBLIC HEARING PRESENTATION – 1/19/2017

  2. Roles of Municipal Government Cemetery Services Law Enforcement/Police Services Airports Road Construction & Maintenance Solid Waste Collection & Disposal Water Supply & Protection Electric Systems Sanitary Sewer Collection & Disposal Street Lighting, Traffic Control & Signage Storm Drainage & Flood Protection Building Services Pedestrian Facilities (Sidewalks, Trails, Etc) Fire Protection/Emergency Services Animal Control Services Snow Removal & Salting Services Land Use Regulations Irrigation/Secondary Water Parks & Open Space

  3. Public Works Department Current Number of Employees: 20 Departments/Teams: ◦ Water / Streets ◦ Sewer / Utilities ◦ Tech / SCADA ◦ Shop / Mechanics ◦ Administrative

  4. Existing Public Works Facility Current Facility Constructed in 2005 2005 Cost of Facility ‐ $1,678,600 Building Size – 12,082 SF Expected to Meet Needs for Approximately 10 Years with Moderate Growth ◦ Heber City has grown by approx 60% since construction ◦ PW Dept projected to grow from 20 to 40 employees over the next 20 years

  5. Existing PW Facility – Deficiencies Admin / Office Space Training/Lunch Room doesn’t accommodate current staff Currently only 13 undersized lockers for 18 field workers Restroom facilities are not sufficient for current staff Current facility does not provide private office space for Supervisors Secure space needed for SCADA System & Controls No conference room for Pre ‐ Construction/Development Meetings Limited ability to accommodate public / visitors

  6. Existing PW Facility Deficiencies Admin / Office Space Restroom / Locker Room with Gear in Entry

  7. Existing PW Facility Deficiencies Admin / Office Space Shared Supervisor Office Space

  8. Existing PW Facility – Deficiencies Equipment Storage & Maintenance 45 Pieces of Equipment/Vehicles vs. Conditioned Indoor Storage Space for 10 Vehicles ◦ Covering equipment will reduce costs associated with dry rot and replacement of hydraulic hoses and tires ◦ 10 Snow Plows loaded with salt require indoor storage ◦ Hydro ‐ Excavator & Sewer Combo trucks require indoor storage ◦ Service life of maintainers, high tech equipment, and specialty equipment is being decreased due to exposure to the elements ◦ Response times increase significantly for equipment stored outdoors in winter months ◦ Trade ‐ in values increase for covered equipment Existing vehicle maintenance bay does not accommodate heavy duty equipment Due to insufficient storage, a portion of the existing vehicle wash bay is currently serving as material storage A dedicated efficient wash bay is necessary to maintain fleet & extend service life

  9. Existing PW Facility Deficiencies Equipment Storage & Maintenance Equipment in Vehicle Storage Bays

  10. Existing PW Facility Deficiencies Equipment Storage & Maintenance Snow Plows in Vehicle Storage Bays – Ready to Respond

  11. Existing PW Facility – Deficiencies Site Improvements / Storage Salt Storage Shed needs expansion ◦ When the shed was constructed, it accommodated 3 to 4 salting events ◦ Due to growth, the shed now accommodates only 2 salting events ◦ Storm patterns in this area often include more than 2 successive events requiring salt ◦ Access to Heber City for delivery is limited and can be challenging during weather events ◦ Often a 24 hour delay between salt order & delivery Updated Storm Drain/MS4 Regulations require improved facilities for drying and disposal of street sweepings and other debris Additional storage needed for water/sewer/storm drain parts Limited site area mandates underground storm detention to provide space for site improvements

  12. Existing PW Facility – Deficiencies Site Improvements / Storage Outside covered parking is not adequate for existing equipment. Additional covered parking will reduce the need for additional enclosed (climate controlled) space Due to site constraints, some improvements need to be relocated for circulation and deliveries Additional parking stalls are needed to provide space for public and staff parking outside of the secured area

  13. Existing PW Facility Deficiencies Site Improvements / Storage Water Parts Stored in Vehicle Wash Bay

  14. Existing PW Facility Deficiencies Site Improvements / Storage Equipment Parked in Storage Yard

  15. Existing PW Facility Deficiencies Site Improvements / Storage Existing Salt Storage Shed

  16. Public Works Facility Expansion Process to Date RFP (Request for Proposals) Process May, 2016 – July, 2016 ◦ 7 Proposals Received ◦ Shortlisted to 4 Firms ◦ Interviews of Shortlisted Firms Award Architectural Services to JRCA August, 2016 Schematic Design & Programming Phase September, 2016 – Current ◦ Project Kickoff Meeting ◦ Tours of Public Works Facilities ◦ Staff Interviews ◦ Planning Workshops ◦ Public Meetings/Reports

  17. Public Works Facility Expansion Process to Date Key Assumptions & Objectives ◦ No future reduction to services provided by PW Department ◦ Determine if site is adequate for ultimate needs of PW Department ◦ (May not want to invest further in site if found to be inadequate) Findings ◦ Based on assumptions & preliminary work, site appears to be Adequate ◦ Costs for ultimate needs are higher than anticipated

  18. Public Works Facility Expansion Phasing Options & Costs Note: Phased Approach Would Cost an Additional $1.7 Million Dollars

  19. Public Works Facility Expansion Phasing Options & Costs

  20. Public Works Facility Expansion Phasing Options & Costs

  21. Public Works Facility Expansion Phasing Options & Costs

  22. Public Works Facility Expansion Council Direction Staff is Seeking Direction on the Following: 1. Should the City submit an application to CIB for project funding? 2. If so, what amount should be applied for? and 3. What funding allocation and terms should be applied for?