Harper College Outdoor Amphitheater Project Committee of the Whole Feb. 18, 2015 H ARPER L AKE D EVELOPMENT Z ONE N N Future Building New Access Pedestrian Mall Addition/Renovation Existing Access S ITE I MPLEMENTATION P ROJECTS N


  1. Harper College Outdoor Amphitheater Project Committee of the Whole Feb. 18, 2015

  2. H ARPER L AKE D EVELOPMENT Z ONE N N Future Building New Access Pedestrian Mall Addition/Renovation Existing Access

  3. S ITE I MPLEMENTATION P ROJECTS N Phase 1 Outdoor NEW Phase 2 Amphitheater Gathering Space Node

  4. O UTDOOR A MPHITHEATER : R ECOMMENDED D ESIGN C ONCEPT STAGE AND CANOPY RAMPS (2) GREAT LAWN MAIN WALK LIGHT POLE D BLDG. D ACCESS N BLDG. E ACCESS

  5. S ITE I MPLEMENTATION P ROJECT S CHEDULE – 2014-2016 Date (approx.) Task Item: 1. Sept. ’14-April ’15 1. Engineering & Design Period 2. May ‘15-Apr.’16 2. Construction Period 3. Spring ‘16 Graduation 3. Outdoor Amphitheater Complete

  6. O UTDOOR A MPHITHEATER - R ECOMMENDED C ONCEPT

  7. D ESIGN P ARAMETERS Site Design • Large, flexible lawn area • Paving layout linked to buildings and new E-W circulation spine • Stage located near Lake Harper • Accessible • Building D Amenities: -Lower pre-function patio - Stair/ramp/patio combo at D north door Stage Design • Organic stage shape • Canopy functions as sun shade and backdrop • Seating flexibility; no permanent seating • Arc layout for seating orientation to stage • Dual ramp access to stage

  8. S TAGE : R ECOMMENDED C ONCEPT

  9. A MPHITHEATER L ANDFORM AND S IGHTLINES Considerations • Sightlines • Accessibility • Shade

  10. S UN /S HADE Stage Canopy Tent and/or Shade Tree Zones Graduation, 11 a.m. N Indoor Monitors for Remote Viewing (Bldg A,D,E)

  11. B UILDING D A CCESS : R ECOMMENDED D ESIGN C ONCEPT

  12. Thank You!

  13. Back Pocket Slides

  14. C AMPUS S ITE F URNISHINGS P ALETTE Current Furnishings Palette NEW Pedestrian Light Poles with Changeable Banners

  15. P LANT P ALETTE

  16. C ONTEXT : C ONSTRUCTION Turnaround and Walks Remain As Is …Until Future Project Implementation Period Ending 2017 Bldg A, Construction thru 2017

  17. B UILDING D A CCESS : R ECOMMENDED D ESIGN C ONCEPT STAIRS RAMP DOOR AND CANOPY UPPER D PATIO ATRIUM N LOWER PATIO (PRE-FUNCTION SPACE)

  18. B RIDGE C ONCEPT

  19. C ONTEXT : C ONCEPT P EDESTRIAN M ALL Art Garden Outdoor Amphitheater Student Center Courtyard