GIF tests status report: uninstallation data taking ended last Wed. Equipment removal till last Friday tnx Joerg v. Loeben and Steffen!! Lead bricks and holding structure removed yesterday with the crane LMU driver will


  1. GIF tests status report: uninstallation • data taking ended last Wed. • Equipment removal till last Friday • tnx Joerg v. Loeben and Steffen!! • Lead bricks and holding structure removed yesterday with the crane • LMU driver will bring everything back to Munich on May 23 F. Legger – MPI, May 14, 2008

  2. GIF tests status report: data • 14 M + 4 M + 2 M + 120k = 20 M evts collected • Threshold scan (34-36-38 mV) ~ 1M evts each; • Counting rate scan (0, 800, 1100, 1500 Hz/cm2) ~ 1 M evts each; • HV scan (2700V, 2745V) with source on/off ~ 1 M evts each; • Atlas settings for electronics with source on/off ~ 1 M evts each; • Time over Threshold scan with source on/off and threshold scan (34-36-38-40-42-44 mV) ~ 10k evts each. Tnx to the GIF crew: Felix, Markus, Jurgen, Carl-Friedrich, Julia, Albert, myself F. Legger – MPI, May 14, 2008

  3. Analysis status • Calibration nutples produced for all runs taken so far; • Meeting on Friday with Oliver and Felix to best coordinate analysis efforts; • Albert started working on Garfield simulations and sent first plots (limited statistics). F. Legger – MPI, May 14, 2008

  4. GIF tests: the future Gas Gas Gas • Test a prototype chamber (surface ~1 m2); GIF GIF GIF • GIF is booked till the end of COMPASS 2008, but can be used till end 2009; ATLAS • We will probably be ready to start beginning 2009; • Concern about setup dimensions: 1.2 m (width) x 2.5 m (length). DAQ DAQ DAQ F. Legger – MPI, May 14, 2008

  5. spare slides

  6. The setup at the GIF ATLAS DAQ LHCb Source Cs 137 COMPASS 590 GBq Gas F. Legger 02/08/08 6

  7. The setup at the GIF LHCb MWPC chamber 6 1-m-long small tubes F. Legger 02/08/08 7

  8. Our dangerous DAQ cabling which will have to be redone by May 1st GIF entrance F. Legger 02/08/08 8

  9. The setup at the GIF: a closer look cosmic muon LHCb ref. chambers 50 cm long standard MDT tubes 6 1-m-long COMPASS small tubes F. Legger 02/08/08 9

  10. The setup at the GIF: the trigger cosmic muon big LHCb scintillator moved from top to in between 2 layers of 6 COMPASS the two scintillators bottom each layers Scintillators shielded by 120 lead bricks! F. Legger 02/08/08 10

  11. GIF tests: shielding drawing not to scale! reference chamber lower multilayer shielded by Pb wall small tubes and upper multilayer shielded by LHCb chamber LHCb MPWC F. Legger 02/08/08 11

  12. GIF tests: drift time spectra (no irradiation) • threshold 38 mV • first hit, no tracking t max ~ 200 ns F. Legger 02/08/08 12

  13. GIF tests: drift time spectra (no irradiation) • threshold 38 mV • first hit, no tracking t max ~ 700 ns F. Legger 02/08/08 13

  14. GIF tests: drift time spectra (full irradiation) • threshold 36 mV • analysis needed! Lead shielding F. Legger 02/08/08 14