FM 156 (H ASLET C OUNTY L INE R OAD ) FROM I NTERMODAL P ARKWAY TO US 81 / US 287 Public Meeting December 13, 2018 December 13, 2018 FM 156 Public Meeting
Project Overview FM FM 156 (Hasl 56 (Haslet Count t County Line Line Road) Pr ad) Project Limits oject Limits — From Intermodal Parkway to US 81/US 287 The purpose of this project is to improve safety, reduce congestion, improve capacity, and plan for future transportation needs. FM 156 Public Meeting December 13, 2018 2
FM 156 Crash Analysis: Total Accidents 40 37 37 35 30 27 27 25 20 20 20 15 [VAL [V ALUE] UE] 10 5 0 Total Accidents 2014 2015 2016 2017 * January 2014 - September 2017 ** Crashes assumed to be on the main highway based on data. 100 Reported Crashes from 2014 to 2017 FM 156 Public Meeting December 13, 2018 3
FM 156 Crash Analysis: Cause of Accident 14 12 12 12 10 10 10 Crashes on FM 156 Crashes on FM 1 8 7 6 6 6 5 4 4 4 4 3 3 2 2 2 2 2 1 1 1 1 1 1 0 0 0 0 0 0 Rear-End Opposite Single Vehicle Same Direction, Angle Left-Turn Collision Unknown Direction/Both Off Road One Straight Going Straight One Stopped Cause of Crash Cause of Crash 2014 2015 2016 2017 * January 2014 - September 2017 ** Crashes assumed to be on the main highway based on data. FM 156 Public Meeting December 13, 2018 4
FM 156 Crash Analysis: Type of Injury 40 34 35 30 Crashes on FM 156 24 Crashes on FM 1 25 20 18 15 11 10 5 3 3 3 2 1 1 0 0 0 Fatality/Incapacitating Injury Non-Incapacitating Injury Property Damage Only Ty Type o of I Injury 2014 2015 2016 2017 * January 2014 - September 2017 ** Crashes assumed to be on the main highway based on data. FM 156 Public Meeting December 13, 2018 5
FM 156 Crash Analysis: Pavement Conditions 30 27 25 23 Crashes on FM 156 20 Crashes on FM 1 18 15 13 10 9 5 4 3 2 1 0 0 0 0 Dry Wet Ice/Snow/Slush Pavement Conditions Pa ment Conditions 2014 2015 2016 2017 * January 2014 - September 2017 ** Crashes assumed to be on the main highway based on data. FM 156 Public Meeting December 13, 2018 6
Project Overview Level of Service (LOS) at Intersections • LOS A through F where: - LOS A represents free flowing traffic - LOS F represents traffic conditions with heavy delays. FM 156 Public Meeting December 13, 2018 7
Public Involvement Goals Goals – Provide public involvement opportunities for stakeholders, roadway users, and the general community to engage with the project team and share feedback – Provide information for those interested in the project process and timeline through the webpage (www.txdot.gov). • Keyword search “FM156” FM 156 Public Meeting December 13, 2018 8
Public Involvement Pr Process ocess – Stakeholder Meetings (City and County) – Technical Work Group Meetings (working session for public agencies) – Public Meetings – Public Hearing – Traffic Noise Workshop after Environmental Approval (if noise abatement is warranted and deemed reasonable and feasible) FM 156 Public Meeting December 13, 2018 9
Proposed Improvements / Considerations Proposed six-lane urban section with raised curb center median south of Avondale-Haslet Road and bicycle / pedestrian accommodations. Proposed four-lane urban section with raised curb center median north of Avondale-Haslet Road and bicycle / pedestrian accommodations. Bicycle and pedestrian improvements will include: – 14 ft outside lane for shared use between vehicles and bicyclists on both sides – 5 ft sidewalk behind the curb on both sides FM 156 Public Meeting December 13, 2018 10
Proposed Improvements / Considerations Evaluate three alternatives: ALTERNATIVE 1 - Widen to both sides. Obtain Right-Of-Way (ROW) from east and west sides of the current roadway. – 120 ft existing ROW (typical) – 170 ft proposed ROW (typical) – Approximately 30.1 acres of additional ROW FM 156 Public Meeting December 13, 2018 11
Proposed Improvements / Considerations Evaluate three alternatives: ALTERNATIVE 2 - Widen to the east. Obtain ROW primarily from east side of the current roadway. – 120 ft existing ROW (typical) – 160 ft proposed ROW (typical) – Approximately 24.7 acres of additional ROW FM 156 Public Meeting December 13, 2018 12
Proposed Improvements / Considerations Evaluate three alternatives: ALTERNATIVE 3 - Widen to the west. Obtain ROW primarily from west side of the current roadway. – 120 ft existing ROW (typical) – 180 ft existing ROW (typical) – Approximately 30.4 acres of additional ROW FM 156 Public Meeting December 13, 2018 13
Proposed Improvements / Considerations Replace bridge at Johnson Creek and widen other existing bridges or add twin adjacent to existing bridge – Reduces cost of proposed bridges by utilizing the existing bridge. Accommodate existing / planned transportation needs by others – Haslet Parkway – City of Haslet Schoolhouse Road & FM 156 Shared-Use Path FM 156 Public Meeting December 13, 2018 14
Proposed Improvements / Considerations Consider elimination of grade separation at the abandoned BNSF railroad crossing – Reduces cost by eliminating a new bridge at this location – Reduces cost by reducing additional ROW needed for new bridge – Improves access to FM 156 FM 156 Public Meeting December 13, 2018 15
Proposed Improvements / Considerations A noise analysis will be conducted and noise abatement will be evaluated for any impacts Minimize additional ROW – Utilize existing ROW where possible – Utilize retaining walls where feasible – Widen from the existing centerline, each side, where possible FM 156 Public Meeting December 13, 2018 16
Anticipated Schedule Timeline Timeline Activity Activity December 2018 Public Meeting #1 Early 2019 Identification of Preferred Alternative Mid 2019 Public Meeting #2 Mid 2019 90% Preliminary Design FM 156 Public Meeting December 13, 2018 17
Anticipated Schedule Timeline Timeline Activity Activity Late 2019 Approved Preliminary Design Schematic Late 2019 Preparation of Right-of-Way Exhibits Early 2020 Public Hearing and Environmental Clearance Construction is anticipated to begin in 2025 and is currently estimated at $74 million. FM 156 Public Meeting December 13, 2018 18
Alternatives Construction Cost Comparison Construction cost is currently estimated at $74 million. General cost comparison between alternatives: Alternative 2 is the least costly of the alternatives at $74M. Alternative 1 is approximately $1.9 million more than Alternative 2. Alternative 3 is approximately $3.4 million more than Alternative 2. [CELLREF [CELLREF] [CELLREF [CELLREF] [CELLREF [CELLREF] Relative Construction Cost FM 156 Public Meeting December 13, 2018 19
Share Your Input Submit comments b Submit comments by: Completing a comment card Email: FM156haslet@txdot.gov Mail: Texas Department of Transportation ATTN: Natnael Asfaw, P.E. 2501 SW Loop 820 Fort Worth, TX 76133 While comments are always welcome, they must be received by Thur Thursda sday, Januar , January 3, 20 y 3, 2019 to be included in the official meeting documentation. FM 156 Public Meeting December 13, 2018 20
Thank Y Thank You! u! Pr Project Contact Inf oject Contact Information rmation Natnael Asf Natnael Asfaw, P P.E., TxDO E., TxDOT Pr T Project Manager oject Manager Phone: (817) 370-6603 Email: FM156haslet@txdot.gov Website: www.TxDOT.gov Key Word: FM156 FM 156 Public Meeting December 13, 2018 21
Recommend
More recommend