FEASIBILITY STUDY BLIND BROOK-RYE UNION FREE SCHOOL DISTRICT
Presenters CS Arch Architecture | E ngineering | Construction Management Thomas M. Ritzenthaler AIA – Vice President / Principal-in-Charge Heather Fagans Chaze azen En Engin gineer eering, PC George Cronk, PE – Project Manager
Agenda AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING • Feasibility Study Review CAPITAL PROJ ECTS NEXT STEPS • Safety & Security Upgrades • Site Lighting • Capital Projects • Next Steps
Feasibility study
BMP Ridge Street School AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Middle / High School AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Safety & Security
Security Vestibules AGENDA FEASIBILITY STUDY SAFETY & SECURITY Creation of “Man T rap” to provide secure SITE LIGHTING location to screen visitors CAPITAL PROJ ECTS NEXT STEPS S eparate security office for the safety of security personnel Access control door hardware Visitor identification program Video intercom to exterior
Security Vestibules AGENDA FEASIBILITY STUDY SAFETY & SECURITY • BMP Ridge S treet S chool SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS Existing Entry and Main Office Proposed Entry and Main Office Estimated Project Cost: $117,911
Security Vestibules AGENDA FEASIBILITY STUDY SAFETY & SECURITY Middle / High S chool SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS Existing Entry and Main Office Proposed Entry and Main Office Estimated Project Cost: $61,200
Site Lighting Recommendations
Site Lighting Plan AGENDA FEASIBILITY STUDY SAFETY & SECURITY Initial installation cost, LED vs. HID SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Site Lighting Plan AGENDA FEASIBILITY STUDY SAFETY & SECURITY Initial installation cost, LED vs. HID SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
LED vs. HID Site Lighting AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
15 Year Life Cycle Analysis AGENDA FEASIBILITY STUDY SAFETY & SECURITY Initial installation cost, LE D vs. HID SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
15 Year Life Cycle Analysis AGENDA FEASIBILITY STUDY SAFETY & SECURITY Maintenance Cost SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
15 Year Life Cycle Analysis AGENDA FEASIBILITY STUDY SAFETY & SECURITY Operational Cost SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
15 Year Life Cycle Analysis AGENDA FEASIBILITY STUDY SAFETY & SECURITY Cost S ummary SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Capital Projects
Middle / High School AGENDA FEASIBILITY STUDY SAFETY & SECURITY • Additional Classrooms at second floor SITE LIGHTING CAPITAL PROJ ECTS • Previously constructed for future second floor NEXT STEPS • Relatively inaccessible for large equipment • Additional Classrooms at existing storage • Large enough for use as classrooms • Need floor, ceiling, and wall finishes • Need to add second means of emergency egress
Middle / High School AGENDA FEASIBILITY STUDY SAFETY & SECURITY • Additional Classrooms at second floor SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS ADDIT ITIO ION – SEC SECOND FLO FLOOR (2) NE W CLAS S ROOMS (1) NE W S TAIR TOWE R AND RE NOVATE D CORRIDOR Total S Q. FT.: 2,750 Approx. Total Project Cost: $982,000
Middle / High School AGENDA FEASIBILITY STUDY SAFETY & SECURITY • Additional Classrooms at existing storage SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS CLAS S S S RO ROOM R RETROFI FIT CONVE RT E XIS TING S TORAGE TO (2) CLAS S ROOMS (APPROX. 2070 S Q FT) E XCAVATE AND E XTE ND E XIS TING COURTYARD FOR E ME RGE NCY E GRE S S (APPROX. 3750 S Q FT) Approx. Total Project Cost: $680,000
Next Steps
Recommend
More recommend