El Dorado Trail Extension & Bike/Pedestrian Overcrossing Projects Public Informational Meeting July 21, 2016 El Dorado County Community Development Agency Transportation Division Project Information Extend the existing Class I bike


slide-1
SLIDE 1

El Dorado Trail Extension & Bike/Pedestrian Overcrossing Projects Public Informational Meeting July 21, 2016

El Dorado County Community Development Agency Transportation Division

slide-2
SLIDE 2

Project Information

  • Extend the existing Class I bike path from

Missouri Flat Road to the community of El Dorado

  • 8-foot paved path with 2-foot unpaved

shoulders

  • Construct an overcrossing at Missouri Flat

Road to accommodate trail users

  • A new, larger parking area will be constructed

at the future Missouri Flat Road/Diamond Springs Parkway intersection

  • All improvements anticipated within existing

Sacramento Placerville Transportation Corridor (SPTC) right of way

slide-3
SLIDE 3

Project Location

slide-4
SLIDE 4

Project Funding & Estimated Costs

  • Environmental & Design Phase funding obtained through

Congestion Mitigation Air Quality (CMAQ) program federal grants

  • Additional grant funding currently being pursued for

Construction Phase

  • Class I Trail Extension Project Total Cost = $4.1 million
  • Bike/Pedestrian Overcrossing Project Total Cost =

$6.4 million

slide-5
SLIDE 5

Prepare Environmental Document in Compliance with CEQA & NEPA Preliminary Design / Public Outreach Right of Way Acquisition Develop Plans, Specifications and Estimate (PS&E) Project Funding Authorization Construction

2014 2015/16 2016/17 2017/18 2017/18 2019

Project Schedule

slide-6
SLIDE 6

Class I Bike Path Design Criteria

slide-7
SLIDE 7

Trail Extension Project Plan

slide-8
SLIDE 8

Trail Extension Project Plan

slide-9
SLIDE 9

Trail Extension Project Plan

slide-10
SLIDE 10

Trail Extension Project Plan

slide-11
SLIDE 11

Trail Extension Project Plan

slide-12
SLIDE 12

Roadway Crossing Safety Measures

Solar-Powered Roadside Pedestrian Signal Overhead “Hawk” Pedestrian Signal

slide-13
SLIDE 13

Bike/Pedestrian Overcrossing Overview

slide-14
SLIDE 14

Structure Types

Girder Truss Arch Cost: $ Cost: $$ Cost: $$$

slide-15
SLIDE 15

Truss Bridge – Reflecting Railroad History

slide-16
SLIDE 16

Truss Bridge – Reflecting Railroad History

Narrow Gauge Shay Locomotive (Diamond & Caldor Railway, circa 1936)

slide-17
SLIDE 17

Truss Types

Truss ‘A’ Truss ‘B’

slide-18
SLIDE 18

Truss ‘A’

slide-19
SLIDE 19

Truss ‘A’

slide-20
SLIDE 20

Truss ‘B’

slide-21
SLIDE 21

Truss ‘B’

slide-22
SLIDE 22

Wall Finish Treatments

Brick & “Fractured Fin” Concrete Pier Brick Retaining Wall

slide-23
SLIDE 23

Wall Finish Treatments

Stacked Rock & Concrete Pier Stacked Rock Retaining Wall

slide-24
SLIDE 24

Bridge Lighting Options

Low-Profile Path Lighting Example

slide-25
SLIDE 25

Bridge Lighting Options

Overhead Lighting Example

slide-26
SLIDE 26

New Parking Area

slide-27
SLIDE 27

Summary of Overcrossing Design Options

  • Structure Type: Girder, Truss, Arch, Other?
  • Truss Type: ‘A’ vs. ‘B’
  • Wall Finish Treatments: Brick vs. Stacked Rock

& “Fractured Fin” vs. Smooth Finish Concrete

  • Bridge Lighting: Low Profile vs. Overhead
slide-28
SLIDE 28

Questions? Thank you for attending! Comment cards are provided at the door – we welcome your input on design options!