SLIDE 1
El Dorado Trail Extension & Bike/Pedestrian Overcrossing Projects Public Informational Meeting July 21, 2016
El Dorado County Community Development Agency Transportation Division
SLIDE 2 Project Information
- Extend the existing Class I bike path from
Missouri Flat Road to the community of El Dorado
- 8-foot paved path with 2-foot unpaved
shoulders
- Construct an overcrossing at Missouri Flat
Road to accommodate trail users
- A new, larger parking area will be constructed
at the future Missouri Flat Road/Diamond Springs Parkway intersection
- All improvements anticipated within existing
Sacramento Placerville Transportation Corridor (SPTC) right of way
SLIDE 3
Project Location
SLIDE 4 Project Funding & Estimated Costs
- Environmental & Design Phase funding obtained through
Congestion Mitigation Air Quality (CMAQ) program federal grants
- Additional grant funding currently being pursued for
Construction Phase
- Class I Trail Extension Project Total Cost = $4.1 million
- Bike/Pedestrian Overcrossing Project Total Cost =
$6.4 million
SLIDE 5
Prepare Environmental Document in Compliance with CEQA & NEPA Preliminary Design / Public Outreach Right of Way Acquisition Develop Plans, Specifications and Estimate (PS&E) Project Funding Authorization Construction
2014 2015/16 2016/17 2017/18 2017/18 2019
Project Schedule
SLIDE 6
Class I Bike Path Design Criteria
SLIDE 7
Trail Extension Project Plan
SLIDE 8
Trail Extension Project Plan
SLIDE 9
Trail Extension Project Plan
SLIDE 10
Trail Extension Project Plan
SLIDE 11
Trail Extension Project Plan
SLIDE 12
Roadway Crossing Safety Measures
Solar-Powered Roadside Pedestrian Signal Overhead “Hawk” Pedestrian Signal
SLIDE 13
Bike/Pedestrian Overcrossing Overview
SLIDE 14
Structure Types
Girder Truss Arch Cost: $ Cost: $$ Cost: $$$
SLIDE 15
Truss Bridge – Reflecting Railroad History
SLIDE 16
Truss Bridge – Reflecting Railroad History
Narrow Gauge Shay Locomotive (Diamond & Caldor Railway, circa 1936)
SLIDE 17
Truss Types
Truss ‘A’ Truss ‘B’
SLIDE 18
Truss ‘A’
SLIDE 19
Truss ‘A’
SLIDE 20
Truss ‘B’
SLIDE 21
Truss ‘B’
SLIDE 22
Wall Finish Treatments
Brick & “Fractured Fin” Concrete Pier Brick Retaining Wall
SLIDE 23
Wall Finish Treatments
Stacked Rock & Concrete Pier Stacked Rock Retaining Wall
SLIDE 24
Bridge Lighting Options
Low-Profile Path Lighting Example
SLIDE 25
Bridge Lighting Options
Overhead Lighting Example
SLIDE 26
New Parking Area
SLIDE 27 Summary of Overcrossing Design Options
- Structure Type: Girder, Truss, Arch, Other?
- Truss Type: ‘A’ vs. ‘B’
- Wall Finish Treatments: Brick vs. Stacked Rock
& “Fractured Fin” vs. Smooth Finish Concrete
- Bridge Lighting: Low Profile vs. Overhead
SLIDE 28
Questions? Thank you for attending! Comment cards are provided at the door – we welcome your input on design options!
Contact: CDA / Transportation Division Email: EDCtrail@edcgov.us Phone: (530) 621-5900