ECSEL CALLS 2018 YVES GIGASE
CALLS 2018 • Results will be communicated next week • Always remember... Rumors are carried by haters, spread by fools, and accepted by idiots. • Serenity
ECSEL PROJECTS YVES GIGASE
ECSEL A UNIQUE FUNDING MECHANISM Public companies > Companies (large and small) Averages 1.6B€ Universities, RTOs,… 4 1: National programmes 22% 2: ESI funding 1% EUREKA JTIs /JUs Clusters 3: EU Budget H2020 24% Contractual 4: Own contribution 53% National PPPs Programmes FP7/H2020 Based on 2016-2017 selected projects Calls 1 3 Member > 1.17B States 1.17B€ € 2 Smart Specialization ESIF/ERDF Regions
ECSEL: N ETWORKS OF P ARTNERS AND P ROJECTS More Moore T echnology Other Components Silicon on Insulator T echnology Platforms for Cyber Physical Systems MtM IC-T echnology CPS platform developments Integrated Smart Systems MtM pilot lines for ISS CPS with mixed HW/SW Digitalisation of Industry developments
OTHER ADOS OTHER SafeAdapt NETWORKS OF PROJECTS Cybercars 2 ADEPT ECSEL AUTODRIVE ENABLE-S3 eDAS ARTEMIS ReVAS SVA 3CCAR MOBINET UDRIVE TEAM RobustSENSE PEGASUS VRUITS C2X PANAMA DRIVE ENIAC E3CAR ARTEMIS EMC2 Demanes BATTMAN MBAT IoE DESERVE CRYSTAL CESAR MotorBrain POLLUX CASTOR
T OGETHER ! Partners per country 15 Projects with same 6 coordinator (*) supporting clusters all over Europe 6 18 Projects 1 33 7 435 Participants 12 58 15 7 9 7 15 5 4 3 109 2 87 12 5 IL 10 3 4 (*) coordinator is ST located in France
SME PARTICIPANTS ✓ Ease of participating to an ECSEL project Othe 38% of the SME entities participated SM ✓ First steps r … more than once in an ECSEL call E … ✓ Enlarging the environment LE for the SME 49% of the SME entities participate ✓ SME help the project in in at least one SELECTED project 7 … focussing, bringing in their 50% funding for the SME’s experience ENTITIES PARTICIPATING TO AT LEAST ONE ECSEL CALL
ECSEL PROJECTS • Has a centre of gravity of selected projects around larger pan European projects (30+ partners from 10+ ECSEL Participating States this includes Israel, Norway, Turkey, Switzerland) , • Addresses • IA- call: higher Technology Readiness Levels (TRLs 5-8) like pilot lines, pilot innovation projects, demonstrators, test beds, full scale testing, … • RIA-call: lower TRLs (3-4) executed by an industrial consortium, innovation, demonstrators in realistic environment, deployment plan showing the valorisation for the ECS ecosystem • BUT does not preclude smaller projects focusing on topics with strong industrial support or projects with a non-industrial coordinator.
DIFFERENCES WITH OTHER H2020 CALLS IA Funding rates LE / SME / OTHER: 20% / 25% / 35% RIA Funding rates LE / SME / OTHER: 25% / 30% / 35% Funding rates National eligibility and national funding rates Page limits Various thresholds! Various caps Etc. Read the Work Plan carefully!!!
ECSEL CALLS 2019 YVES GIGASE
PLANNING CALL 2019 Something along the lines of 2018: Call 2018-1 Innovation Action Call 2018-2 Research and Innovation action Part A: All Grand Challenges except “ Implementing AI and machine learning, to detect anomalies or similarities and to optimize parameters ” Part B: Grand Challenge “ Implementing AI and machine learning, to detect anomalies or similarities and to optimize parameters ” Call 2018-3 Coordination and Support Action for the Lighthouse Initiative Industry4.E Call 2018-4 Coordination and Support Action for the Lighthouse Initiative Mobility.E T wo procurement studies
CALL 2019 PLANNING BROKERAGE EVENT 15-16 January Call 2019 Launch 06/02/2019 Call 2019 PO Deadline 07/05/2019 Call 2019 FPP Deadline 18/09/2019 Call 2019 Selection decision 19/11/2019
Recommend
More recommend