• Call related questions/”ECSEL HelpDesk ”: calls@ecsel.europa.eu • Calls coordinator: Simona Rucareanu • Backup calls coordinator: Bahija Ziane 2 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
The estimated EU expenditure 174,93 M€ • ECSEL-2018-1-IA: Innovation Actions • ECSEL-2018-2-RIA : Research and Innovation Actions • ECSEL-2018-3-CSA for Industry4.E Lighthouse Initiative • ECSEL-2018-4-CSA for Mobility.E Lighthouse Initiative • Public Procurement (2 studies) 3 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• Calls Page ( general information/updates including the links for the proposals submission in the participant portal ): https://www.ecsel.eu/calls/calls-2018 • Participant Portal ( detailed information & submission links ): ECSEL-2018-1-IA: Innovation Actions ECSEL-2018-2-RIA : Research and Innovation Actions 4 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• OPEN CALLS – Innovation Action (IA): ECSEL-2018-1-IA – Research Innovation Action (RIA) (two topics): - ECSEL-2018-2-RIA - ECSEL-2018-2-RIA-SPECIAL TOPIC 5 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• ECSEL-2018-2-RIA- SPECIAL TOPIC – Open ONLY TO the Major Challenge* Chapter 9. Digital Industry 9.3.2. Major challenge 2 Implementing AI and machine learning, to detect anomalies or similarities and to optimize parameters * - Major Challenges are described in MASP 2018 (GB 2017.94) 6 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• ECSEL-2018-1-IA and ECSEL-2018-2-RIA Open to ALL the Major Challenges EXCEPT* Chapter 9. Digital Industry 9.3.2. Major challenge 2 Implementing AI and machine learning, to detect anomalies or similarities and to optimize parameters * - Major Challenges are described in MASP 2018 (GB 2017.94) 7 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• BOTH CALLS will be in TWO phases: – PO (Project Outline) Compulsory and Gating – FPP (Full Project Proposal) 8 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
EVALUATIONS EVALUATIONS jan feb mar apr may jun jul aug sep oct nov dec Funding FPP PO decision Calls open Deadline Deadline February September 20 April 26 21 ECSEL Call Forum 6-7 March, Poland https://www.ecsel.eu/calls/calls-2018 9 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
Date Activity Calls launch 21 February 26 April @ 17:00:00* Deadline Project Outline (PO) June Feedback on PO 20 September @17:00:00* Deadline Full Project Proposal (FPP) November Selection of projects for funding December - April Grant Preparation phase * - Brussels time (CET Time) 10 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
TRL EU ECSEL-2018-1-IA 5-8 110.00M€ ECSEL-2018-2-RIA 3-4 53.33M€ ECSEL-2018-2-RIA-special topic 3-4 10.00M€ 11 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
2018-2 RIA: ECSEL Participating State 2018-1 IA 2018-2 RIA ESIF All Calls Total Special topic Austria 7 7 Belgium-Flanders 12 12 Belgium-Brussels 1.5 1.5 Bulgaria Czech Republic 1.5 1 0.5 3 Denmark Finland 2 2 1 5 (1) A budget is available; the amount will France (1) be communicated later Germany 30 30 (2) 15 M€ from MISE; 2 M€ from MUIR; 5 Germany-Saxony (only for Saxonian M€ ESIF for RIA only 9 4 13 partners) (3) For all Calls Greece Hungary 1 1 Ireland 2 2 Israel 6 6 Italy (2) 15 2 5 20 Latvia 0.42 0.42 Malta Netherlands 10 10 20 Norway 2.2 2.2 Poland 1.5 1.5 Portugal Romania (3) 2.6 2.6 Slovak Republic 0.8 0.8 Spain 6 6 Sweden 5.5 5.5 Switzerland United Kingdom Turkey 3 3 12 Total 37.5 19 1.5 7.6 78.92 144.52
Costs according Costs according to national rules Costs according to ESIF rules to H2020 rules x% of DC 25% of DC Indirect costs Other direct cost Equipment, Travel Materials, etc Direct cost: Subcontracting Direct cost: Personnel DC: direct costs National Funding ESI Funding EU Funding 13 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• If activities with costs are funded through ESI funds, then those activities cannot obtain ECSEL-EU funding . • Various possibilities to include activities funded by ESI funds described in the Guide for Applicants • Main issue: no overlap • Risk mitigation: what happens if the activity does not get the ESI funding? 14 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
ECSEL-2018-1-IA • The EU contribution per project is capped at 30M€ • the maximum EU funding per partner in a project is limited to 50% of the total EU funding for the project 15 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
ECSEL-2018-2-RIA • The EU contribution per project is capped at 15M € • the maximum EU funding per partner in a project is limited to 40% of the total EU funding for the project ECSEL-2018-2-RIA-SPECIAL TOPIC • the maximum EU funding per partner is limited to 10% of the total EU funding for the project EU Budget allocated for this topic: 10M€ ONLY ONE PROPOSAL WILL BE SELECTED 16 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
The MAX funding percentages of the EU contribution are different than under H2020 . Type RIA IA For profit (non SME) 25% 20% SME 30% 25% University/Other 35% 35% EU Contribution as % of the eligible cost according to H2020 (beneficiaries may ask for a lower contribution) The proposals are encouraged to reach a 1:1 ratio EU/national funding (project level) National contributions: vary per state, see Chapter 9 of ECSEL JU Annual Work Plan 2018! Contact the national authorities to inquire about the specificities! 17 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
ECSEL-2018-1-IA • PO phase – score resolution 0.5 Criteria Range Threshold Excellence 0-5 2.5 Impact 0-5 2.5 Quality and efficiency of the 0-5 2.5 implementation Total 10 • FPP phase – score resolution 0.1 Criteria Range Weight** Threshold* Excellence 0-5 1.0 3.0 Impact 0-5 1.5 3.0 Quality and efficiency of 0-5 0.7 3.0 the implementation Total 10 * - threshold applies to unweighted score ** - the weight is only used to establish the ranking of the proposals 18 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
ECSEL-2018-2-RIA • PO phase – score resolution 0.5 Criteria Range Threshold Excellence 0-5 2.5 Impact 0-5 2.5 Quality and efficiency of the 0-5 2.5 implementation Total 10 • FPP phase – score resolution 0.1 Criteria Range Weight** Threshold* Excellence 0-5 1.0 3.0 Impact 0-5 1.0 3.0 Quality and efficiency of 0-5 0.7 3.0 the implementation Total 10 * - threshold applies to unweighted score ** - the weight is only used to establish the ranking of the proposals 19 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
ECSEL-2018-2-RIA-SPECIAL TOPIC • PO phase – score resolution 0.5 Criteria Range Threshold Excellence 0-5 2.5 Impact 0-5 2.5 Quality and efficiency of the 0-5 2.5 implementation Total 10 • FPP phase – score resolution 0.1 Criteria Range Weight** Threshold* Excellence 0-5 1.3 3.0 Impact 0-5 1.0 3.0 Quality and efficiency of 0-5 0.7 3.0 the implementation Total 10 * - threshold applies to unweighted score ** - the weight is only used to establish the ranking of the proposals 20 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• Use the default template and fonts! – Chapter EXCELLENCE - 60 pages – Chapter IMPACT - 60 pages – Chapter IMPLEMENTATION - 60 pages • Sections on participants description, ethics, public summary are excluded from the page limit • The page limits and sections subject to limits will be clearly indicated in the proposal templates. • Expert evaluators will be instructed to disregard the excess pages. 21 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• Blocking if under threshold • Participants, budgets: as complete and precise as possible BUT changes are possible afterwards, though limited! • Part B of the Proposal to address – Section 1. Excellence (complete) – Section 2. Impact (partial) , – Section 3. Implementation (partial) Fill in as indicated in the template! 22 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• Fill in the other Sections if available info : – Section 4. Members of the consortium; – Section 5. Ethics and Security; • Section 6. Publishable Summary ( mandatory !!!) Successful proposals (above threshold) invited to FPP!!! 23 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
• Part B of the Proposal to be fully addressed – Section 1. Excellence (complete) – Section 2. Impact (complete) , – Section 3. Implementation (complete) • Section 6. Publishable Summary ( mandatory !!!) DO NOT FORGET: a draft plan for the exploitation and dissemination is an admissibility condition for FPP!!! 24 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
1. Check out the ECSEL website and the H2020 participant portal 2. Documents 3. Follow the instructions in the Templates 25 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw
Annexes 5(IA), 6(RIA) Chapter 9 • Work Plan : schedule, budget, topics, evaluation procedure including criteria, national rules, TRLs • Guide for applicants : further details on Part A, B and C; regional funding; further explanation on evaluation criteria; ESIF; Lighthouses; • MASP 2018 : Look for topic/major challenges descriptions • Part B Template: A MUST! 26 ECSEL Call Forum 6 March 2018 CEZAMAT Warsaw