drainage district and drain route
play

Drainage District and Drain Route Drainage District = 476 acres 316 - PDF document

4/11/2018 1 O RCHARD P ARK I NTERCOUNTY D RAIN L IVINGSTON AND G ENESEE C OUNTIES Meeting to Determine Necessity Preliminary Engineering Update April 11, 2018 2 Project History No established drain within drainage district currently


  1. 4/11/2018 1 O RCHARD P ARK I NTERCOUNTY D RAIN L IVINGSTON AND G ENESEE C OUNTIES Meeting to Determine Necessity Preliminary Engineering Update April 11, 2018 2 Project History � No established drain within drainage district currently � Petitioned to establish drainage district filed with Livingston County Drain Commissioner in September 2015 � Determined practical by Drain Board - May 2016 � Draft Preliminary Engineering Report - January 2017 � Engineer evaluated additional scenarios in 2017 � Level of Service and Cost-Benefit analysis � Updated route was established on the main drain � Petition to establish and construct drain received by LCDC on January 31, 2018 1

  2. 4/11/2018 3 Drainage District and Drain Route � Drainage District = 476 acres • 316 acres-Genesee County • 160 acres-Livingston County � The Main Drain route was updated to align with parcel boundaries on January 9, 2018 (6,100 feet) � East Branch provides outlet from existing retention basin (3,230 feet) 4 Orchard Park Retention Basin Flooding Frequency � In last 10 years, the basin flooded 4 times � Also, near flooding in 5/2015 and 5/2016 Photo taken May 2014 by Craig Saddler 2

  3. 4/11/2018 5 Updated Design Scenarios � In February 2017, additional scenarios were performed for the enclosed portion of the East Branch � Scenario 1 was included in the Draft Report � Scenarios 2 and 3 reduce the pipe sizes but the max HGL would increase � Scenario 4 reduces level of service and project costs Maximum Basin Outlet Design Max HGL Scenario No. Allowable HGL Diameter Drain Time (hrs) Storm (feet) (feet) (feet) 1 25-year 898.5 3 898.4 6 2 25-year 901 2 899 15 3 25-year 901 1.5 899.27 30 4 10-year 898.5 2 898.08 12 6 Easements � Estimated 25 easements required � Final drain route and project schedule to be impacted by easement acquisition 3

  4. 4/11/2018 7 Next Steps (if deemed necessary) � Finalize Preliminary Engineering Report � Obtain additional field survey � Complete Preliminary Plans � Draft easement documents and acquire easements � Finalize Construction Plans, obtain permits � Issue Bid Documents 4