d esign i dea 1
play

D ESIGN I DEA #1 S OUTHWEST E NTRANCE P AVILION W / B RIDGE 8 - PowerPoint PPT Presentation

P OTOMAC Y ARD M ETRORAIL S TATION P ROJECT Potomac Yard Metrorail Implementation Work Group April 22, 2019 A GENDA Ongoing Activities PYC/Contractor Pre-construction Update Update on Southwest Entrance Pricing Process Southwest


  1. P OTOMAC Y ARD M ETRORAIL S TATION P ROJECT Potomac Yard Metrorail Implementation Work Group April 22, 2019

  2. A GENDA • Ongoing Activities • PYC/Contractor Pre-construction Update • Update on Southwest Entrance Pricing Process • Southwest Entrance Design Ideas • Southwest Entrance Objective Statement & Matrix 2 PYMIG| April 22, 2019

  3. O NGOING A CTIVITIES • Submitted Joint Permit Application (JPA) – Army Corps has posted their public notice • April 5 th – May 6 th • www.nao.usace.army.mil/Media/Public- Notices/Article/1806450/nao-2012-02012 • https://www.alexandriava.gov/potomacyard/default.aspx?id=10 1657#April2019 – DEQ continues reviewing application – City responding to questions and information requests – DEQ will post their public comment period and hearing date • Southwest entrance pricing process 3 PYMIG| April 22, 2019

  4. PYC / C ONTRACTOR U PDATE 4 PYMIG| April 22, 2019

  5. S UMMARY L OOK A HEAD S CHEDULE 5 PYMIG| April 22, 2019

  6. S OUTHWEST E NTRANCE P RICING P ROCESS 6 PYMIG| April 22, 2019

  7. S OUTHWEST E NTRANCE P RICING PROCESS • TASK 1 - Completed – Advance engineering sufficiently to allow the performance of independent cost estimates and schedule impact analyses for each of the 3 ideas – Approximately two months to complete (April) • TASK 2 – On going – WMATA and PYC will both perform the cost estimates and schedule analyses – The cost and schedule analysis results will be included in the Matrix – Approximately one month to complete (May) 7 PYMIG| April 22, 2019

  8. S OUTHWEST E NTRANCE D ESIGN I DEA #1 S OUTHWEST E NTRANCE P AVILION W / B RIDGE 8 PYMIG| April 22, 2019

  9. S OUTH E NTRANCE D ESIGN I DEA #1 As presented during the 1/14/19 and 3/18/19 S OUTH E NTRANCE P AVILION W / B RIDGE PYMIG meetings 9 PYMIG| April 22, 2019

  10. S OUTHWEST E NTRANCE D ESIGN I DEA #1 SOUTHWEST ENTRANCE PAVILION GROUND AND MEZZANINE FLOOR PLAN 10 PYMIG| April 22, 2019

  11. S OUTHWEST E NTRANCE D ESIGN I DEA #1 SOUTHWEST ENTRANCE PAVILION EAST AND WEST ELEVATION 11 PYMIG| April 22, 2019

  12. S OUTHWEST E NTRANCE D ESIGN I DEA #1 BRIDGE – TYPICAL SECTION 22’ – 7 9/16” 12’ 12 PYMIG| April 22, 2019

  13. S OUTHWEST E NTRANCE D ESIGN I DEA #1 SOUTHWEST ENTRANCE PAVILION LOOKING NORTHEAST 13 PYMIG| April 22, 2019

  14. S OUTHWEST E NTRANCE D ESIGN I DEA #2 E. G LEBE R AMP W / MOVING WALKWAY 14 PYMIG| April 22, 2019

  15. S OUTH E NTRANCE D ESIGN I DEA #2 As presented during the 1/14/19 and 3/18/19 E. G LEBE R AMP W / MOVING WALKWAY PYMIG meetings 15 PYMIG| April 22, 2019

  16. S OUTHWEST E NTRANCE D ESIGN I DEA #2 E . GLEBE RAMP W / MOVING WALKWAY – WEST AND EAST ELEVATION 16 PYMIG| April 22, 2019

  17. S OUTHWEST E NTRANCE D ESIGN I DEA #2 E . GLEBE RAMP W / MOVING WALKWAY – WEST AND EAST ELEVATION 17 PYMIG| April 22, 2019

  18. S OUTHWEST E NTRANCE D ESIGN I DEA #2 RAMP – TYPICAL SECTION 34’ 24’ 6’ 18 PYMIG| April 22, 2019

  19. S OUTHWEST E NTRANCE D ESIGN I DEA #2 RAMP WITH MOVING WALKWAY LOOKING NORTH 19 PYMIG| April 22, 2019

  20. S OUTHWEST E NTRANCE D ESIGN I DEA #2 RAMP WITH MOVING WALKWAY LOOKING SOUTH 20 PYMIG| April 22, 2019

  21. S OUTHWEST E NTRANCE D ESIGN I DEA #3 S OUTHWEST E NTRANCE P AVILION W / S MALL M EZZANINE 21 PYMIG| April 22, 2019

  22. S OUTH E NTRANCE D ESIGN I DEA #3 As presented during the 1/14/19 and 3/18/19 S OUTH E NTRANCE P AVILION W / S MALL M EZZANINE PYMIG meetings 22 PYMIG| April 22, 2019

  23. S OUTH E NTRANCE D ESIGN I DEA #3-PYC P ROPOSAL S OUTH E NTRANCE P AVILION W / S MALL M EZZANINE (4) East/West pedestrian crossing now located at southern bridge Relocate Fare Gates to Mezzanine (2) Elevators (1) Stair 23 PYMIG| April 22, 2019

  24. S OUTHWEST E NTRANCE D ESIGN I DEA #3 SOUTH PAVILION GROUND & MEZZANINE FLOOR PLAN 24 PYMIG| April 22, 2019

  25. S OUTHWEST E NTRANCE D ESIGN I DEA #3 SOUTH PAVILION EAST AND WEST ELEVATION 25 PYMIG| April 22, 2019

  26. S OUTHWEST E NTRANCE D ESIGN I DEA #3 WEST ELEVATION / SOUTH ELEVATION 26 PYMIG| April 22, 2019

  27. S OUTHWEST E NTRANCE D ESIGN I DEA #3 S OUTH M EZZANINE - WEST ELEVATION 27 PYMIG| April 22, 2019

  28. S OUTHWEST E NTRANCE D ESIGN I DEA #3 S OUTH M EZZANINE - EAST ELEVATION SECTION 28 PYMIG| April 22, 2019

  29. S OUTHWEST E NTRANCE D ESIGN I DEA #3 S OUTH M EZZANINE – PLATFORM FLOOR PLAN S.E. Station entrance – Elevators to pedestrian bridge and fare gates 29 PYMIG| April 22, 2019

  30. S OUTHWEST E NTRANCE D ESIGN I DEA #3 S OUTH M EZZANINE – MEZZANINE FLOOR PLAN 30 PYMIG| April 22, 2019

  31. S OUTHWEST E NTRANCE D ESIGN I DEA #3 S OUTH P AVILION AND S OUTH M EZZANINE LOOKING SOUTHEAST 31 PYMIG| April 22, 2019

  32. S OUTHWEST E NTRANCE D ESIGN I DEA #3 S OUTH MEZZANINE LOOKING NORTHWEST 32 PYMIG| April 22, 2019

  33. S OUTHWEST E NTRANCE O BJECTIVE S TATEMENT & M ATRIX 33 PYMIG| April 22, 2019

  34. C OMMENTS FROM THE PREVIOUS MEETING • Develop an objective statement – Define what we are trying to accomplish • Use low/medium/high rating for Matrix • ADD: – Travel times • People wheelchair bound & able-bodied – Operation & Maintenance cost – Travel experience: • Quality of walk • Level of effort required (ramps, stairs, elevators) • Noise Safety / Crime • – Economic potential - with respect to south PY development 34 PYMIG| April 22, 2019

  35. OBJECTIVE STATEMENT “ Based on the Amazon corporate headquarters arrival to the National Landing area, the objective is to enhance the Potomac Yard Metro southwest station entrance by maximizing accessibility and improving mobility to the station. Increasing station visibility and desirability will maximize access and economic potential for the Potomac Yard area.” 35 PYMIG| April 22, 2019

  36. M ATRIX – S OUTHWEST E NTRANCE 36 PYMIG| April 22, 2019

  37. M ATRIX – S OUTHWEST E NTRANCE 37 PYMIG| April 22, 2019

  38. T RAVEL T IME C ALCULATIONS • Starting point: East Glebe Rd & Potomac Ave • Ending point: Fare Gates • Factors: – Walking speed ranges based on industry design standards – Level of effort exerted for each option – Potential wait times for elevators 38 PYMIG| April 22, 2019

  39. Discussion 39 PYMIG| April 22, 2019

  40. U PCOMING PYMIG M EETING • Tuesday, May 21 st : – Contractor update • Summer construction activities – Southwest entrance update • Early June Meeting (TBD): – Contractor update – Southwest entrance update 40 PYMIG| April 22, 2019