SBN-FD Control Room Operations Working Group Geoff Savage WA104/ICARUS Technical Working Group Meeting 11-Dec-2019 The brief history of the Control Room Operations WG 15-Nov-2019 I sent an email to Claudio suggesting we start an


  1. SBN-FD Control Room Operations Working Group Geoff Savage WA104/ICARUS Technical Working Group Meeting 11-Dec-2019

  2. The brief history of the Control Room Operations WG • 15-Nov-2019 – I sent an email to Claudio suggesting we start an operations working group. – “The mandate would be setting up documentation infrastructure for shifts and computers in the control room. The software infrastructure for control room operations requires a significant amount of work.” • The verbal response shortly after was yes, form the working group, with some good suggestions. – Narrow the scope of “operations”. – Start the group with senior people leading. – Write down to goals of the WG (I see that my mandate is not coherent.) • Diana and Bruce started working on setting up the control room. • We are still working on the goals • We had our first meeting this week on Monday 9-Dec. 2 12/11/19 Geoff Savage | Control Room Operations WG

  3. Control Room Operations WG Goals • Identify and implement the technical aspects of operating the Icarus detector from ROC-W and from remote control rooms. – Hardware - computers, monitors – Software • Shift communications (zoom, slack) • DAQ communications (ssh tunnel, vpn, vnc, authentication) • DAQ software (run control, art daq, monitoring) • Event display • Be ready for cool down operations – Display internal cryostat parameters – temperatures and LAr level – Operate DAQ to readout 6 tpc crates • This group will not determine when a shifter is qualified to take a shift. Nor will it determine when a remote control room is ready for shifters. Nor will it determine the shift quotas for collaborators. 3 12/11/19 Geoff Savage | Control Room Operations WG

  4. SBN Control Room in ROC-West • Space allocated in ROC-West is for the SBN control room with Icarus as the first occupant. – Remote Operations Center – West side of Wilson Hall • Right now Nova test beam is using the SBN control room space that will eventually be used by SBND. – Nova test beam runs for another 6 months. 4 12/11/19 Geoff Savage | Control Room Operations WG