Conne c t Or e gon Rule s Advisor y Committe e Air, Ma rine , Ra il a nd Pro je c ts o f Sta te wide Sig nific a nc e Pre se nte d b y: Jo hn Bo re n, F re ig ht Pro g ra m Ma na g e r Ja nua ry 7, 2019
Ag e nda I nte rmo da l de finitio n Ma tc h – c o nfirm c o nse nsus Re a dine ss – c o nfirm c o nse nsus Sta tute c o nside ra tio ns Adjo urn 2
HB 2017 Sta tutory Cha ng e s Cha rg e o f Rule s Adviso ry Co mmitte e Se pa ra te Cre a te d Re mo ve d Pa rt 1 a nd Ca rve -o ff fo r T ra nsit a s Pa rt 2 Bike / Pe d E lig ib le Mo de Pro g ra ms Pro je c ts 3
Inte rmodal De finition (D) Whether the proposed project has quantifiable improvements in at least one of the following: (i) increasing system velocity or (ii) Increasing system capacity, or (iii) reducing system congestion or conflict points or (iv) adds an intermodal connection, or enhances an existing intermodal connection that results in a freight volume of at least 50,000 TEUs/year or 100 trucks/day in each direction 4
Ma tc h Using L a nd a s Ma tc h Limit time for Land purchase Cannot use prior land price – limit to same parcel of purchase – 50% of match land twice 5, 10 or 20? 5
Re a dine ss E nviro nme nta l Pe rmits I nc lude with L imit time to o the r pe rmits a c q uire – re q uire me nts 9 mo nths 6
Unr e solve d Ide ntifie d Issue s/ Ne e ds/ Oppor tunitie s I te ms ra ise d in Me e ting # 1 tha t a re b e yo nd the sc o pe o f the rule ma king pro c e ss F lagge d Ite ms Minimum Pro g ra m Size July 1 E va lua tio n o f F und 10% pe r Re g io n Mo da l Se pa ra tio n (Bike / Pe d) 7
Recommend
More recommend