Challenges of Electrification in Urban Areas 1
Furrer+Frey 2
The case for electrification Evaluation of air quality at the Birmingham New Street Railway Station AL Hickman, CJ Baker , X Cai, JM Delgado-Saborit and JE Thornes 3
What are the challenges? 4 case studies Communities Environment Complexity Technology 5
Case Study Limmittalbahn 6
Limmittalbahn 7
Key Facts Total length: 13.4km Number of stops: 27 Voltage: 600V DC inner-city areas, 1200V suburban areas Maximum Speed: 48km/h (30mph) on mixed traffic areas. 60mph (37mph) on the segregated tramway 90% of track on the segregated tramway. 10% Shared road use. Incorporation of street lights Working with architects, local government, local civil society groups. 8
Communities 9
Limmittalbahn 10
Limmittalbahn 11
Limmittalbahn 12
Limmittalbahn 13
Bern 14
15
Bolligenstrasse Depot 16
Integration 17
Nexus Tyne & Wear 18
Tyne and Wear 19
NEXUS Renewal 20
What it means 21
Conclusion 22
Thank you for listening? Furrer+Frey GB Ltd. Winchester House 19 Bedford Row Noel Dolphin London WC1R 4EB United Kingdom ndolphin@furrerfrey.ch @NoelDolphin Tel: +44 203 740 5455 Email: GB@furrerfrey.ch www.furrerfrey.ch rey.ch
Recommend
More recommend