challenges of
play

Challenges of Electrification in Urban Areas 1 Furrer+Frey 2 - PowerPoint PPT Presentation

Challenges of Electrification in Urban Areas 1 Furrer+Frey 2 The case for electrification Evaluation of air quality at the Birmingham New Street Railway Station AL Hickman, CJ Baker , X Cai, JM Delgado-Saborit and JE Thornes 3 What are the


  1. Challenges of Electrification in Urban Areas 1

  2. Furrer+Frey 2

  3. The case for electrification Evaluation of air quality at the Birmingham New Street Railway Station AL Hickman, CJ Baker , X Cai, JM Delgado-Saborit and JE Thornes 3

  4. What are the challenges?  4 case studies  Communities  Environment  Complexity  Technology 5

  5. Case Study Limmittalbahn 6

  6. Limmittalbahn 7

  7. Key Facts  Total length: 13.4km  Number of stops: 27  Voltage: 600V DC inner-city areas, 1200V suburban areas  Maximum Speed: 48km/h (30mph) on mixed traffic areas. 60mph (37mph) on the segregated tramway  90% of track on the segregated tramway.  10% Shared road use.  Incorporation of street lights  Working with architects, local government, local civil society groups. 8

  8. Communities 9

  9. Limmittalbahn 10

  10. Limmittalbahn 11

  11. Limmittalbahn 12

  12. Limmittalbahn 13

  13. Bern 14

  14. 15

  15. Bolligenstrasse Depot 16

  16. Integration 17

  17. Nexus Tyne & Wear 18

  18. Tyne and Wear 19

  19. NEXUS Renewal 20

  20. What it means 21

  21. Conclusion 22

  22.  Thank you for listening? Furrer+Frey GB Ltd. Winchester House 19 Bedford Row  Noel Dolphin London WC1R 4EB United Kingdom  ndolphin@furrerfrey.ch  @NoelDolphin Tel: +44 203 740 5455 Email: GB@furrerfrey.ch www.furrerfrey.ch  rey.ch

Recommend


More recommend