AzersuCIS Infrastructure Management of Azerbaijan by GeoSP@TIAL ist
Presentation Plan Information about Azerbaijan and Azersu General information about Azerbaijan and Azersu OSJC GIS Solution for Azersu : AzersuCIS Road map of AzersuCIS project What makes the project unique? What are the different sides of AzersuCİS project? Results and Evaluations General assesments about project
About Azerbaijan Capital : Baku Area : 86,600 km2 Water (%) 1.6% Population : > 2011 estimate 9,165,000 > 1999 census 7,953,438 > Density 105.8/km2 GDP (PPP) : 2011 estimate > Total $93.055 billion > Per capita $10,201
About Azersu OJSC Head Office : Baku Service Area : 86,600 km2 Customers : 1,065 million Length of water Infrastructure : 0,000 km Length of wastewater Infrastructure : 0,000 km Budget 2011 : 4 Billion USD
Azersu Investments Investments 2010 2011 2012 Azersu OJSC
How can we manage this infrastructure? What are the assets that Azersu has? Where are they? Which kind of condition are they in? Water Waste Storm Water Water Water Basins How are their efficiencies? What are their values? How many subscriber/citizen have they connection with? Is the potable water amount the same with the invoiced amount? How changes water loss rates among regions?
How can we manage this infrastructure?
The Solution : AzersuCIS Project The main collaboration platform for the Master Plan, SCADA and the other IT systems. • Collect and store infrastructure data in a GIS system for better operation and maintanence of the infrastructure system. AzersuCIS has a powerful, tested and proven « Urban Infrastructure and Environmental Management System» behind its Geographical Information System.
AzersuCIS Project Az ərsuCİS C oğrafi İ nformasiya S istemi
Goals of AzersuCIS Project Powerful Data Production/Update/Reporting System Cost Optimization AZERSUCIS Institutionalization Service Quality Increment
Road Map of the Project Activities/2012 1 2 3 4 5 6 7 8 9 10 11 12 Step 1. Azersu Geographical Information System Analysis Step 2. Design of Geographical Information System Step 3. Development of Data input, update, analysis, reporting tools Step 4. Development of AsBuilt projects preparation software Step 5. Archieve data transformation into spatial database Step 6. Development of maps management system Step 7. Data input/update from remote locations Step 8. Development of Geoweb/Mobile applications Step 9. User trainings and deployment of GIS project
Step : 1 G.I.System Analysis of AzersuCIS BUSSINESS AND STRATEGY MANAGEMENT Financial Analysis Bussiness Intelligence Tariff PLANNNING CUSTOMER MANAGEMENT OPERATION SUPPORT SERVICES Complaint Customer Survey Project Accounting Infrastructure Management CRM Billing Superstructure Fleet Management BACK-OFFICE SERVICES Maps and Plans Maintenance Management Fıxed Assets Document Register Management Demand Geographical Information Supply Chain Human Resources Management System (GIS) SCADA, Web/Mobile Applications Financial System Telecom Services Modelling
Step : 1 G.I.System Analysis of AzersuCIS GIS/GEOWEB/ BUSSINESS AS-BUILT CAD/GIS DATA MOBILE INTELLIGENCE PROJECTS INPUT/UPDATE PUBLISHING PREPERATION ANALYSIS/REPORT (BI) (WMS/WFS) 3 1 4 2 SPATIAL DATABASE
Step : 1 G.I.System Analysis of AzersuCIS - CONSTRUCTION DEPARTMENT - BAKI WATER&SEWARAGE CONTRACTORS - REGIONAL WATER AUTHORITIES 1 ASBUILT PROJECT(HARDCOPY) GIS File(.CBS) Pictures,Videos (CD-DVD) DEPARTMENT OF SURVEY 1 ASBUILT PROJECT(HARDCOPY) GIS File(.CBS) Pictures,Videos (CD-DVD) ARCHIEVE DEPARTMENT OF GIS 1 ASBUILT PROJECT(HARDCOPY) ONLINE PUBLISHING
Step : 2 Design of Azersu GIS AZERSUCIS AZERSUCIS AZERSUCIS AZERSUCIS DESIGN GeoWEB/ GIS CAD MODEL MOBILE GeoWEB Publisher CAD/GIS GeoWEB GeoSPATIAList B. GeoWeb WaterCAD/ GEMS MicroStation/ Publisher PowerDraft v8i Bentley Map GeoWEB / SewerCAD/ GEMS Interface Interface + VBA CAD/GIS Map Guide MOBILE Bentley Map + CivilStorm PostgreSQL/ VBA DASHBOARD Google Earth POSTGIS SERVER DATABASE SERVER FILE BUSSINESS INTELIGENCE (BI) WEB SERVER PostgreSQL/POSTGIS (Oracle/SPATIAL ) MIS/ERP/CRM/ SCADA
Step : 2 Design of Azersu GIS Bentley software were preferred as a main platform for all GIS and AECO (Architecture, Engineering, Construction, 1 MicroStation v8i Operation) projects. 2 M.PowerDraft v8i Using Bentley solutions, a real-time collaboration was ensured among the 3 Bentley Map v8i more than 100 AzersuCIS users in disparate locations. 4 Bentley Descartes v8i WaterCAD v8i SewerCAD v8i Select Services Technical Support
Step : 2 Design of Azersu GIS
Step : 3 Development of Data input, update, analysis, reporting tools
Step : 4 Development of AsBuilt projects preparation software PIPE END ELBOW HYDRANT WATER PIPELINE
Step : 4 Development of AsBuilt projects preparation software 6-WATER 1-NODE 4-FITTINGS METER 3-COMPONENT 5-SERVICE LINE 2-PIPE
Step : 4 Development of AsBuilt projects preparation software K Legend SOFTCOPY .CBS FILE Scale: 10m 1/ 500 PICTURES HARDCOPY (1 MAP + COORDINATE LIST) VIDEOS
Step : 4 Development of AsBuilt projects preparation software TRAINING VIDEOS HELP DOCUMENTS
Step : 5 Archieve data transformation into spatial database Ş OLLAR-TRASSA WATER TRANSMISSION LINE 63 MAPS (1911)
Step : 5 Archieve data transformation into spatial database Topographical 1/25.000 291 pieces (1975-1985) Water Wells
Step : 6 Development of vector and raster maps management system
Step : 6 Development of vector and raster maps management system Qobustan Abseron Haciqabul
Step : 6 Development of vector and raster maps management system AZƏRSUCİS MAP MANAGEMENT SYSTEM
Step : 7 Data input/update from remote locations 20 20 OPERATION & MAINTENANCE 15 FINANCE 10 10 10 GIS 10 5 0 CUSTOMERS HUMAN GIS RELATIONS RESOURCES Planning Survey Others SPATIAL DBASE EMERGENCY CONSTRUCTION PLANNING & PROJECT
Step : 8 Development of GeoWeb / Mobile Applications
Step : 9 User trainings and deployment of GIS project
Why is AzersuCIS project unique? 1 All attribute and geometry data are stored in database. Open You do not need to convert your data to any file formats. 2 User based security. Secure All features and map grants can be managed user based. All IT systems are integrated with GIS. 3 Spatial Integrated All departments can benefit from GIS. It also has GIS Desktop, web, Database mobile interfaces. 4 Easy to use and manage because of superior design. Easy You can easily use or manage your GIS. AzersuCIS has a powerful, tested and proven «Urban Infrastructure and Environmental Management System» behind its Geographical Information System.
Why is AzersuCIS project unique? 1 All attribute and geometry data are stored in database. Open You do not need to convert your data to any file formats. Single Data Source Open, Flexible, Modular Architecture
Why is AzersuCIS different? User based security. 2 Secure All features and map grants can be managed user based. FEATURES FUNCTIONS USER MAPS SETTINGS
Why is AzersuCIS different? All IT systems are integrated with GIS. 3 Integrated All departments can benefit from GIS. It also has GIS Desktop, web, mobile interfaces. Operational Activities Executives Operation Departments Construction Departments Planning Departments Information Management Information Information Customers Modelling System Hydraulic Address System System SCADA Backround Systems
Why is AzersuCIS different? Easy to use and manage because of superior design. 4 Easy You can easily use or manage your GIS. Functional Management Interface Admin Integrated • All Features, maps, user • All IT systems can be easily grants can easily be set and integrated to GIS. Report&Analysis managed from Admin 4.5 4.3 interface. 3.5 2.5 Category Category Category Category Client Web/Mobile 1 2 3 4 • All produced data can be • Users can access and edit published instantly from web defined features, maps from or mobile devices. their interfaces. User Friendly Interface Design
Why is the AzersuCIS project unique? FIRST GIS PROJECT with Bentley In Azerbaijan, there is no institutional GIS project yet. This project is groundbreaking and reference project which is built on top of Bentley and spatial database technologies. AzersuCIS GIS will be implemented with Bentley products in Azersu. All Project contractors will prepare asbuilts with MicroStation. CAD&GIS Integration This project showed us that CAD and GIS can work together perfectly and also this is possible and necessary. INSTITUTIONAL The unique feature of this project is to have an institutional structure. All users of the project must be registered to the system first. Then they may be authorized to see/edit/report each of the maps and spatial features.