Architects | Planners Borough of Freehold Public Schools | 9.26.11 | Slide 1
• Park Avenue Elementary School/Freehold Intermediate School • Freehold Learning Center Borough of Freehold Public Schools | 9.26.11 | Slide 2
Category A – Life / Health Safety / Building Code/Emergent… Category B – Prevent Damage to Building Structure or Systems… g y g g y Category C – Recommended / Educational / Discretionary Projects… Category D – Barrier Free / ADA Compliance… Category E – Energy Related Projects… Borough of Freehold Public Schools | 9.26.11 | Slide 3
� Perform On Site S r e and Assessment � Perform On-Site Survey and Assessment • Building • Site • Exterior/Roof • Interior Finishes I i Fi i h • Mechanical • Electrical • Plumbing • Plumbing � Evaluate for Replacement/Repair Costs for Each Item/System � Provide Preliminary Analysis for Solar/Photovoltaic � Provide Preliminary Analysis for Solar/Photovoltaic • Design Similar to that of Galloway Township Middle School � Debt Service Eligible • All projects except site projects (DOE is not currently approving Debt Service Projects) All j t t it j t (DOE i t tl i D bt S i P j t ) • ROD Grant Eligible – Allocation #4 � LRFP Updated • need request to amend the LRFP to implement changes d d h i l h Borough of Freehold Public Schools | 9.26.11 | Slide 4
C Constructed in 1957 with Additions in 1961, 1968 and 1997 t t d i 1957 ith Additi i 1961 1968 d 1997 • Category A – Life / Health / Safety / Building Code / Emergent - grandfather clause on all building code issues - emergent issues – roof and parking lot i f d ki l -Replacement of roof -Replace asphalt parking lot and curbing(ROD grant eligible) • Category B – Prevent Damage to Building Structure C t B P t D t B ildi St t includes all exterior elements that protect envelope - waterproofing - windows - exterior doors d • Category C – Recommended/Educational/Discretionary Projects interior finishes beyond their useful life - interior doors/locks interior doors/locks - Carpeting in library - chalkboards -replacement of corridor lockers MEP items MEP items Borough of Freehold Public Schools | 9.26.11 | Slide 5
• Category D – Barrier Free / ADA Compliance - barrier free access to building through vestibule - ADA doors / hardware / - toilet facilities / access to • Category E – Energy Related Projects - solar/photovoltaic system – 138 kW -optional MEP items Borough of Freehold Public Schools | 9.26.11 | Slide 6
Interior Conditions • replace interior doors/hardware/classroom locks - security $120,000 • replace existing chalkboards with dry marker boards $14,000 • replacement of corridor lockers replacement of corridor lockers $60 000 $60,000 • replace casework, delaminating $75,000 • replacement of carpet in the library $27,000 SUBTOTAL: $296,000 Exterior Conditions Exterior Conditions • replace asphalt drives/parking lots $910,000 • replace roof $320,000 • repair concrete sidewalks $10,000 • waterproof and repoint brick veneer t f d i t b i k $200,000 $200 000 SUBTOTAL: $1,440,000 ADA Compliance • vestibule • gang toilets SUBTOTAL: $100,000 Borough of Freehold Public Schools | 9.26.11 | Slide 7
Solar/Photovoltaic System • solar panel installation – 138 kW $864,000 Mechanical/Electrical/Plumbing Conditions (only poor or fair/poor) • replace unit ventilators $15,000 • replace fire alarm system p y $350,000 $ , • electric power distribution $216,000 • building branch circuits $224,000 CONSTRUCTION SUBTOTAL: $805,000 SUBTOTAL: $3,505,000 SOFT COSTS: $877,000 TOTAL PROJECT COSTS: TOTAL PROJECT COSTS: $4,382,000 $4,382,000 Borough of Freehold Public Schools | 9.26.11 | Slide 8
Borough of Freehold Public Schools | 9.26.11 | Slide 9
Borough of Freehold Public Schools | 9.26.11 | Slide 10
Summary • Buildings are in good to very good shape, and maintained well! Buildings are in good to very good shape, and maintained well! • There are still many items that need repair or replacement • Park Avenue original building is 50 years old g g y • Very good market for construction – contractors are very competitive • Interest rates are very low • If the work is going to be completed at some time in the near future, now is a good time • Categories help prioritize work that needs to be completed g p p p Borough of Freehold Public Schools | 9.26.11 | Slide 11
We woul We would like to d like to give speci give special thanks to thanks to the district admi the district administrati stration and and bui building staff g staff for for thei their assistan r assistance ce in the preparati the preparation of of the study. the study. We look forward to our continued relationship with We look forward to our continued relationship with p p the Freehold Borough Board of Education as we the Freehold Borough Board of Education as we provide professional services to the district. provide professional services to the district. QUESTIONS / ANSWERS? Borough of Freehold Public Schools | 9.26.11 | Slide 12
Borough of Freehold Public Schools | 9.26.11 | Slide 13