CPAC Meeting at Bay View WWTP January 26, 2015 A TWI Background & Summary of TWI Construction Status Thru December 31, 2014 Page - 1 4/25/14 Toledo Waterways Initiative TWIToledos Wet Weather Program Federal consent decree


  1. CPAC Meeting at Bay View WWTP January 26, 2015 A TWI Background & Summary of TWI Construction Status Thru December 31, 2014 Page - 1 4/25/14

  2. Toledo Waterways Initiative  TWI…Toledo’s Wet Weather Program  Federal consent decree to reduce pollution impacts on area waterways from City WWTP and sewers due to heavy rains  Three action components to TWI  Eliminate WWTP Bypasses  Eliminate Known Sanitary Sewer Overflows  Reduce and Control Combined Sewer Overflows B&V - 2 4/25/14

  3. Toledo Waterways Initiative - Dec 2014 Projected total program cost - $521 M We are ~66% complete. On track $ and schedule 1. Eliminate WWTP Bypasses - $135 M Done! Zero bypasses since 2005 2. Eliminate Known Sanitary Sewer Overflows - $71 M Done 2014! – Two addt’l , Heatherdowns & Arlington under design 3. Control Combined Sewer Overflows - $315 M 25 Projects, Design ~ 76% complete, Construction ~34% B&V - 3 4/25/14

  4. LTCP Progress Status Summary – Jan 2015 Page - 4 10/20/14

  5. Map of TWI Projects Currently Under Construction Ottawa River Storage Facility Dearborn Storage Pipeline Page - 5 10/20/14

  6. CSO LTCP Construction Schedule & Cost Curve – Dec 2014 Page - 6 10/20/14

  7. LTCP Construction Safety – Dec 2014 Program to Date Summary • 412,660 hours total • 5 recordable injuries. 2.4 IIR. Nat. ave. is 3.5 • 2 lost workday injuries. 1.0 LWDI. Nat. ave. is 1.1 Page - 7 10/20/14

  8. Bayview Grit Facility – Thru DEC 2014 Page - 8 10/20/14

  9. Bay View Grit Facility – OCT 2014 Grit Building & West Aerated Grit Tanks Page - 9 10/20/14

  10. Oakdale Storage Basin – Thru DEC 2014 Page - 10 10/20/14

  11. Oakdale Storage Basin – DEC 2014 Utility Building Interior & Water Supply Piping Page - 11 10/20/14

  12. Oakdale Storage Basin – DEC 2014 Valve Vault Piping Page - 12 10/20/14

  13. Oakdale Storage Basin – SEP 2014 Valve Vault – Pump Discharge Piping and Valves Page - 13 10/20/14

  14. Oakdale Storage Basin – DEC 2014 SE Corner Pond 5D & Utility Building Page - 14 10/20/14

  15. Oakdale Storage Basin – DEC 2014 Seed & Mulch on North Side of Pond 5D Page - 15 10/20/14

  16. Oakdale Storage Basin – DEC 2014 Panoramic View of Site Before Seed & Mulch Page - 16 10/20/14

  17. Dearborn Storage Pipeline – Thru DEC 2014 Page - 17 10/20/14

  18. Dearborn Storage Pipeline – SEP 2014 Excavation for Dewatering Structure Page - 18 10/20/14

  19. Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – Stone Grading for Bottom Slab Page - 19 10/20/14

  20. Dearborn Storage Pipeline – DEC 2014 Dewatering Structure Interior Formwork Page - 20 10/20/14

  21. Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – Setting First 132-inch Wall Pipe Page - 21 10/20/14

  22. Dearborn Storage Pipeline – DEC 2014 Dewatering Structure – All Three 132-inch Wall Pipes Page - 22 10/20/14

  23. Dearborn Storage Pipeline – DEC 2014 Shaft in Front Street – ES Interceptor Structure Page - 23 10/20/14

  24. Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft – Finishing Bottom of Shaft Page - 24 10/20/14

  25. Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft – Grouting Operation Page - 25 10/20/14

  26. Dearborn Storage Pipeline – DEC 2014 ES Interceptor Structure Shaft & Safety Netting Page - 26 10/20/14

  27. Ottawa River South Storage Facility – Thru DEC 2014 Page - 27 10/20/14

  28. Ottawa River South Storage Facility – DEC 2014 Mobilizing Equipment – Crane Erection Page - 28 10/20/14

  29. Ottawa River South Storage Facility – DEC 2014 Construction of Laydown Area on East Side Page - 29 10/20/14

  30. Ottawa River South Storage Facility – DEC 2014 Installation of Silt Fence on North Side Page - 30 10/20/14

  31. Ottawa River South Storage Facility – DEC 2014 Demolition of the Ball Field Backstop Page - 31 10/20/14

  32. Ottawa River South Storage Facility – DEC 2014 Clearing of Wooded/Brush Area on N. Side of Manhattan Page - 32 10/20/14

  33. Ottawa River South Storage Facility – DEC 2014 Installation of Construction Fence Along the East Side Page - 33 10/20/14

  34. Ottawa River South Storage Facility – DEC 2014 Trench Excavation for Water Main – Blanchard & Manhattan Page - 34 10/20/14