TITLE WINONA BRIDGE 5 Visual Quality Review Committee Meeting October 23, 2013 Slide 1
COMMITTEE FOCUS TOPICS Meeting 1 Meeting 4 • Project Overview • Railings and Barriers • Bridge Piers/Overlooks • River Connection/Ped-Bike Meeting 2 Meeting 5 • Bridge Piers/Overlooks • Vision Statement • Bridge Abutments and Retaining Walls • Lighting • River Connection/Ped-Bike Meeting 3 Meeting 6 • Bridge Abutments and Retaining Walls • Lighting • Railings and Barriers • Landscaping • Signage Winona Bridge Visual Quality Review Committee Meeting 5 Slide 2
PROJECT ANIMATION Winona Bridge Visual Quality Review Committee Meeting 5 Slide 3
CRAFTING A VISION DRAFT Project Vision Statement Discussion The Winona Bridge Project should refm ect the current era while respecting the past. The existing bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate the river’s natural beauty and the cultural history of Winona that is intertwined with the river. Together, the two bridges should symbolize a welcoming gateway to beauty, culture, and prosperity. Winona Bridge Visual Quality Review Committee Meeting 5 Slide 4
LIGHTING Existing Night Views Winona Bridge Visual Quality Review Committee Meeting 5 Slide 5
LIGHTING Existing Night Views Winona Bridge Visual Quality Review Committee Meeting 5 Slide 6
LIGHTING Overview Types of Lighting Other Considerations • Roadway Lighting • Aesthetic Lighting • FAA • Warrant • Migratory Birds • Navigational Lighting • Classifj cation • “Dark Skies” • Light Levels MnDOT Cultural Resources General Guidance • Restored lighting on the existing historic bridge and new roadway/sidewalk lighting on the new bridge will be reviewed for conformance with the Secretary of the Interior’s Standards. • Lighting on the new bridge should be consistent with the overall design of the new bridge, complement the historic bridge, not replicate historic bridge features or elements, and not become a stronger design statement than the historic bridge. • Both the existing historic bridge and the new bridge may use or incorporate aesthetic accent lighting, subject to conformance with the Standards. Winona Bridge Visual Quality Review Committee Meeting 5 Slide 7
LIGHTING Roadway Lighting - Existing Bridge MnDOT Cultural Resources Guidance • Remove existing light standards on the approach spans installed in the 1970’s • If the original railings can be replicated for the approach spans, then accurately reproduce the original light standards for the entire bridge, based on the information in the original plans and photographs. • New replica light standards (poles) on the approach spans • Existing downlights in the through-truss • If the original railings cannot be replicated (e.g., due to crash testing requirements), further discussion on the light poles will need to occur. Winona Bridge Visual Quality Review Committee Meeting 5 Slide 8
LIGHTING Roadway and Trail Lighting - New Bridge MnDOT Cultural Resources Guidance • Design new lighting that will complement the lighting on the historic bridge, while not overshadowing it “Base” Design Scenarios • MnDOT Standard Light Poles • 40’ Tall “Cobrahead” Style • Currently Studying Dif erent Layouts “Enhanced” Design Scenarios • Potential Alternative Pole Style • Potential Additional Pedestrian Height Poles along Trail Winona Bridge Visual Quality Review Committee Meeting 5 Slide 9
LIGHTING Aesthetic Lighting Faith Baum, Illumination Arts Winona Bridge Visual Quality Review Committee Meeting 5 Slide 10
PEDESTRIAN/BICYCLE CIRCULATION S. Approach Potential Trailhead Riverview Dr. Existing Waterfront Trail Huff St. Shoreline Railroad Potential Stair 2nd St. 3rd St. Realigned Trail 4th.St. New Bridge 85851 Winona Existing Bridge 5900 St. Abutment Bridge Trail Sidewalk Potential Path at Ground Level Project Area Including Acquisition Shoulder Bikeway At-Grade Trail Winona Bridge Visual Quality Review Committee Meeting 5 Slide 11
RIVER CONNECTION Vertical Access Concept F - Stair Existing Waterfront Trail Huff St. Shoreline To River To River Railroad Potential Stair 2nd St. 3rd St. F 4th.St. New Bridge 85851 Winona Existing Bridge 5900 St. To Downtown Winona Bridge Visual Quality Review Committee Meeting 5 Slide 12
RIVER CONNECTION Vertical Access Concept F - Stair Potential Stair Trail on New Bridge Overall Stair Size 6 5 Height - 37’ Length - 30’ 2nd St. 2nd St. Width - 15’ Note: Stair structure and railing design is shown only in conceptual detail to illustrate approximate size Winona Bridge Visual Quality Review Committee Meeting 5 Slide 13
RIVER CONNECTION Examples Mississippi River Patterns Erie Street Plaza, Milwaukee, WI Winona Bridge Visual Quality Review Committee Meeting 5 Slide 14
RIVER CONNECTION Examples Queensborough Bridge Plaza, Queens, NY Winona Bridge Visual Quality Review Committee Meeting 5 Slide 15
RIVER CONNECTION Examples Sermonte Library Stormwater Garden, Daly City, CA Winona Bridge Visual Quality Review Committee Meeting 5 Slide 16
RIVER CONNECTION Examples Papillion Plaza, Papillion, NE Federal Avenue Streetscape, Mason City, IA National Eagle Center, Wabasha, MN Winona Bridge Visual Quality Review Committee Meeting 5 Slide 17
RIVER CONNECTION Ground Level Concept A2 Stormwater Pond, typ Overlook Terrace and RR Crossing Trailhead with Kiosk Small Paving Under Bridges Performance Riverview Dr. Space Huff St. Appr p ox. 0. 0 2 Ac A re Boulder Terraces Availabl b e fo f r 2nd St. Redevelo opment Ap Ap Appr pr pr prox ox. 1 Ac ox ox Acre Ac Ac re re r Ava v il va va il ilab ab ab able le le 4th.St. 3rd St. Appr Ap Ap Ap pr pr p ox ox. 1 Ac ox Acre Ac re Ava re va va vail il ilab ab able ab le le e fo fo fo for r Re r r Re Re Rede de de d ve ve ve ve v lo l pm lo lo pmen pm en en ent Railroad fo fo for r Re r r Re Rede Re d ve de de velo ve lo lopm lo pmen pm pm en e t en Shoreline Potential Stair Terraced Plantings Kiosk Entry New Bridge 85851 Plaza Planting Bed in Winona Boulevard Existing Bridge 5900 St. Waterfront Trail Appr Ap Ap Ap p ox pr pr ox ox. 1 Ac ox Ac Ac Acre re re re Ava va vail ilab il a le ab ab ab le le le fo fo fo fo fo for r r Re r Re Re Re Rede Re de de de de eve ve ve v lo lo lopm pm pmen e t en en Infj ltration Basins Planting Bed and Low Wall, typ Historic Paver Area Cross Walk, typ Winona Bridge Visual Quality Review Committee Meeting 5 Slide 18
RIVER CONNECTION Ground Level Concept A2 View Below Bridges from 2nd St. Winona Bridge Visual Quality Review Committee Meeting 5 Slide 19
RIVER CONNECTION Ground Level Concept A2 View from Trailhead on Levee Winona Bridge Visual Quality Review Committee Meeting 5 Slide 20
N. Approach PEDESTRIAN/BICYCLE CIRCULATION Concept A Marina Parking Business Abutment New Bridge 85851 Existing Bridge 5900 Existing Bridge 5930 Stone Steps Shoreline to Remain Main Channel Back Channel Boathouses Bridge Trail 100 Year Flood Elevation At-Grade Trail Winona Bridge Visual Quality Review Committee Meeting 5 Slide 21
N. Approach PEDESTRIAN/BICYCLE CIRCULATION Concept B Marina Parking Marina Parking Business Business Abutment Abutment New Bridge 85851 New Bridge 85851 Existing Bridge 5900 Existing Bridge 5900 Existing Bridge 5930 Existing Bridge 5930 Box Culvert Stone Steps Stone Steps Shoreline Shoreline Under Road to Remain to Remain Main Channel Main Channel Back Channel Back Channel Boathouses Boathouses Bridge Trail 100 Year Flood Elevation At-Grade Trail Winona Bridge Visual Quality Review Committee Meeting 5 Slide 22
N. Approach PEDESTRIAN/BICYCLE CIRCULATION Concept C Marina Parking Business Abutment New Bridge 85851 Existing Bridge 5900 Existing Bridge 5930 Additional Retaining Wall and Railing Stone Steps to Remain Shoreline Main Channel Back Channel Boathouses Bridge Trail 100 Year Flood Elevation At-Grade Trail Winona Bridge Visual Quality Review Committee Meeting 5 Slide 23
OVERLOOK UPDATE 4’-6” Railing Height No Pickets Shown Rounded Overlook Refj ned Surface Treatment Base with Elongated Nose Concept B2 - Pier 10 Winona Bridge Visual Quality Review Committee Meeting 5 Slide 24
OVERLOOK UPDATE Recommended Overlook Size Approximate Maximum Overlook Size Size Considerations • Overlook fm oor area limitations relate to pier foundation size and cantilever construction method • Additional support beams may be required A p • There is signifj cant space along the trail to stand p r o x . Pile Cap Below 5 0 ’ River Surface Winona Bridge Visual Quality Review Committee Meeting 5 Slide 25