I C H A B O D C R A N E C E N T R A L S C H O O L D I S T R I C T 2018 Capital Project Board of Education Meeting 0 5 . 0 7 . 2 0 1 9
Agenda 1. Project Status Update 2. Preliminary Designs 3. Next Steps
Project Status Update
Overview of Project Phases 3 Phases of a Project: • Schematic Design • Design Development • Construction Documents
Overview of Project Phases 3 Phases of a Project: • Schematic Design • Perform field visits to existing buildings • Conduct investigative testing (asbestos, site survey, etc.) • Conduct programming meetings • Develop preliminary design concepts • Regular updates to Project Committee • Design Development • Construction Documents
Overview of Project Phases 3 Phases of a Project: • Schematic Design • Design Development • Select materials and building components • Develop plans and specifications for all disciplines • Construction Documents • Further develop plans and specifications to create bid-ready documents • Submit to NYSED for review and approval
Preliminary Designs
High School- Areas of Work Science Technology & Engineering Math (Includes Building Addition) Arts Guidance & Counseling Suite Security Improvements at Main Entry
Science Biology Biology Chemistry Chemistry Earth Earth Biology Physics Science Science Renovation of these 2 rooms will be a Earth Bid Alternate Science
Science
T echnology & Engineering 2,860 sq.ft. Building Addition
T echnology & Engineering Transportation & Wood Shop Materials Shop Utility Math Innovation Innovation CNC Classroom Lab #1 Lab #2 Fabrication Kitchen Storage Custodial/ Elec Closet Data
T echnology & Engineering
T echnology & Engineering
Arts Art Classroom Distance Library Art Learning Classroom Kiln Room Dark Room Art Computer Classroom Lab
Arts
Math Transportation & Wood Shop Materials Shop Math Innovation Innovation CNC Classroom Lab #1 Lab #2 Fabrication CSE Break Rm Math Math Math Math Math Math Classroom Classroom Classroom Classroom Classroom Classroom
Math
Counseling Suite Psych Office Guidance Guidance Guidance Conference Rm/ Office Office Office Social Worker Office
Middle School- Areas of Work Gymnasium Music Classroom Pods Security Improvements Cafeteria at Main Entry
Classroom Pod 1 Existing Proposed
Classroom Pod 2 Existing Proposed
Gymnasium Storage Storage Small Gymnasium Girls Boys Locker Locker Large Gymnasium Room Room
Gymnasium Storage Storage Small Gymnasium Girls Boys Locker Locker Large Gymnasium Room Room
Gymnasium Storage Storage Storage Gymnasium Girls Boys Locker Locker Room Room
Shown: Main court use, Gymnasium Bleachers extended Storage Storage Storage Girls Boys Locker Locker Room Room
Shown: Side court use, Gymnasium Bleachers collapsed Storage Storage Storage Girls Boys Locker Locker Room Room
Gymnasium
Sitework- Connection Road Area shown has been submitted to NYSED, with roof replacement at HS
Next Steps
Next Steps Schematic Design Phase • • Submit SD Report This week • District to review and approve SD report Late May 2019 • Turner to develop SD estimate Early June 2019 Design Development Phase May – August 2019 • • District to review and approve DD documents September 2019 • Turner to develop DD estimate September 2019 Construction Documents Phase August – December 2019 • • Submit to NYSED (Third Party Review) December 2019 • Turner to develop final estimate January 2020 Anticipated NYSED approval April 2020 •