2013 project excellence awards project requirements
play

2013 Project Excellence Awards Project Requirements In-house design - PowerPoint PPT Presentation

2013 Project Excellence Awards Project Requirements In-house design project Project constructed or near completion Judging Criteria Unique design considerations Constructability Post-construction performance Stakeholder


  1. 2013 Project Excellence Awards

  2. Project Requirements  In-house design project  Project constructed or near completion

  3. Judging Criteria  Unique design considerations  Constructability  Post-construction performance  Stakeholder involvement  Schedule and budget

  4. Six Project Nominations N A S H V I L L E R O A D W I D E N I N G D - 3 S K Y V I E W P A R K – G A S L I G H T S Q U A R E T R A I L D - 5 W O O D L A N D P A R K B R I D G E D - 10 K Y 9 8 C U R V E R E C O N S T R U C T I O N D - 3 L O N G L I CK CR E E K B R I D G E D - 5 R I N E Y V I L L E R O U N D A B O U T D - 4

  5. Nashville Road Widening

  6. Nashville Road Widening BEFORE AFTER

  7. Nashville Road Widening BEFORE AFTER

  8. US 31W Nashville Road BEFORE AFTER

  9. Skyview Park – Gaslight Square Trail

  10. Pedestrian cage over the railroad and concrete New structure installed over Chenoweth Run barrier between path and roadway (Looking south) (Looking north)

  11. New structure over Chenoweth Run Area where the path enters the existing roadway (Looking east) (Looking north)

  12. Woodland Park Bridge

  13. Woodland Park Bridge

  14. Woodland Park Bridge

  15. KY 98 Curve Reconstruction

  16. KY 98 Curve Reconstruction BEFORE AFTER

  17. KY 98 Curve Reconstruction BEFORE AFTER

  18. KY 98 Curve Reconstruction BEFORE AFTER

  19. KY 98 Curve Reconstruction BEFORE AFTER

  20. Long Lick Creek Bridge

  21. Long Lick Creek Bridge

  22. Long Lick Creek Bridge

  23. Long Lick Creek Bridge

  24. Rineyville Roundabout

  25. Rineyville Roundabout

  26. Rineyville Roundabout

  27. Six Project Nominations N A S H V I L L E R O A D W I D E N I N G D - 3 S K Y V I E W P A R K – G A S L I G H T S Q U A R E T R A I L D - 5 W O O D L A N D P A R K B R I D G E D - 10 K Y 9 8 C U R V E R E C O N S T R U C T I O N D - 3 L O N G L I CK CR E E K B R I D G E D - 5 R I N E Y V I L L E R O U N D A B O U T D - 4

  28. Project Excellence Winner 2013 Woodland Park Bridge