welcome
play

Welcome Kolos Begins CSR Turnover 2019 No of Employees One of - PowerPoint PPT Presentation

Welcome Kolos Begins CSR Turnover 2019 No of Employees One of the main cement operator in Mauritius. 1,125 Started operations in M 68 2000 Batir Agir Ranked 77 in Top 100 in 2018 Foundation Subsidiary of Gamma Civic Our Clients


  1. Welcome

  2. Kolos Begins CSR Turnover 2019 No of Employees One of the main cement operator in Mauritius. 1,125 Started operations in M 68 2000 Batir Agir Ranked 77 in Top 100 in 2018 Foundation Subsidiary of Gamma Civic Our Clients Operations Our Products Certifications • ISO 9001 Ready Mix 60 KT MS EN 197-1 • Operators BS EN 413-1 Largest Terminal • Construction ISO 14001 MS 36-3 Indian Ocean Companies Local Compliance • Hardware Stores

  3. Our Values

  4. Our Site

  5. Our Bags Product Kolos Kolos Plus Kolos Eco Plus Kolos Finish CEM II 32.5 Portland CEM II 42.5 Portland CEM II/B-M (LL-Z) 32.5 N- MC 22.5X Masonry Composite Cement Composite Cement TU Portland Composite Cement Cement

  6. Our Bulks Product Bulk Products Specialised Bulk Products • CEM II 42.5 => Portland Composite Cement • CEM III A 42.5 N => Portland Slag Cement • CEM I 42.5 N => Ordinary Portland Cement Used for Port Extension • CEM III B 32.5 N => Sulphate Resistance • CEM I 52.5 N => Ordinary Portland Cement Cement with Low Heat of Hydration Used for Bagatelle Dam • CEM III A 52.5 N => Portland Slag Cement Used for A1 – M1 Motorway

  7. Major Achievements 2018 - 2019

  8. Major Achievements 2013 - 2017 Bagatelle Dam MPA Port Extension International Airport in Mauritius » The 56,900m 2 airport terminal is the » Will enable 24-hour water supply to Port » Will cater for increase shipping activity in largest infrastructure project ever in Louis and Plaines Wilhems Port Louis Mauritius » Cement tons required for this project: 28,000 » Cement tons required for this project: 20,000 » Cement tons required for this project: » Timing: 2012-2017 » Timing: 2015-2017 28,000 » Kolos supplied CEM III B 32.5 with slag » Kolos supplied CEM III A 42.5 with slag » Timing: 2013 which was prepared over a six month period according to specifications required by the » CEM I 42.5 N supplied to produce the specifications required by the designers designers » Was continuously supplied during casting by organising 18 hour continuous deliveries

  9. Our Operation Unloading Cement - KOVAKO Production • Capacity : 7,500 mt/day – Operated and Flat Storage Flat Storage maintained by local team. Shed 2: 20.000 t Slag Shed 1: 40.000 t Portland Cement Continuous blender 150 t/h Silo Storage Bulk Packer 1 Packer 2 3B3 : 80 t Export 25t/h (sac de 25kg) – 50 Capacity of 2,700 Bags/h Palettes 3B4 : 250 t 3B5 : 250 t Palettiseur 70 palettes/h Housseuse 80 palettes / h

  10. Storage and Distribution Storage Kolos Building Materials • Capacity : 1,000 tons (500 Palettes) • 3 points of distribution around the island • Daily shipping rate : 500 - 600 tons • Delivery in less than 1hr

  11. Thank you!

Recommend


More recommend