play

VICDOM UTICA PIT APPLICATION VIRTUAL OPEN HOUSE 3900 Lake Ridge - PowerPoint PPT Presentation

VICDOM UTICA PIT APPLICATION VIRTUAL OPEN HOUSE 3900 Lake Ridge Road Township of Uxbridge, Region of Durham 1 7/21/2020 INTRODUCTION Presentation Purpose: To provide information to the public on VicDom's Utica pit application and review


  1. VICDOM UTICA PIT APPLICATION VIRTUAL OPEN HOUSE 3900 Lake Ridge Road Township of Uxbridge, Region of Durham 1 7/21/2020

  2. INTRODUCTION Presentation Purpose: To provide information to the public on VicDom's Utica pit application and review process. Application: Class A, Category 3 Pit Above Water Location: 3900 Lake Ridge Road Adjacent to Miller Paving’s Boyington Pit #2 (to the north) PROPOSED SITE History: Application initiated in 2014 with applications under the Aggregate Resources Act and Planning Act Status: Due to the length of review, Township of Uxbridge Council has requested a virtual Open House and second Public Meeting. 2

  3. PROPOSAL The Utica pit is a new licence application but will function as an expansion to the existing Boyington Pit #2 to the north, which is owned and licenced by Miller Paving Limited and operated by Vicdom. Details: ▪ Licence area:18.9 hectares (46.7 acres) N Miller Paving’s Boyington Pit #2, ▪ Sand and gravel will be extracted on site operated by Vicdom ▪ Screening will take place on site, with further (licence #6577) processing to occur on the adjacent Boyington Pit #2 ▪ No crushing permitted on site Proposed Utica Pit ▪ No fuel storage on site ▪ Importation of recycled material is restricted to a designated area and limited volume at any given time ▪ Setbacks between the adjacent pits will be extracted to a common elevation to maximize resource recovery and rehabilitation ▪ Proposed rehabilitation to a naturalized area 3

  4. PROPOSAL The following graphic is a 3D model depicting final extracted grades of the pit and does not illustrate progressive rehabilitation, which will occur as each phase is progressively depleted. Proposed Utica Pit (FINAL EXTRACTED GRADE) Miller Paving’s Boyington Pit #2, operated by Vicdom (licence #6577) Existing Pit operated by Powerline Plus (licence #3174 ) 4

  5. PROPOSED SITE PLAN – EXISTING FEATURES Miller Paving’s Boyington Pit #2, operated by Vicdom (licence #6577) Farm buildings have been removed Site is currently used for agriculture Wooded area with rural residences 5 7/21/2020

  6. PROPOSED SITE PLAN – OPERATIONAL PLAN Site Access to Extraction Sequence: Boyington Pit #2, ▪ Four (4) phases operated by Vicdom ▪ North to south (licence #6577) direction BERM DETAIL Use of existing Boyington PHASE 2 Pit #2 entrance/ exit PHASE 1 from Goodwood Road Area of 3 m road PHASE 3 PHASE 4 widening along Lake Ridge Road, as requested by Region of Common boundary Durham to be extracted Recommendations from Permitted area for T echnical Reports: recycling and 1. Air Quality processing 2. Acoustic 3. Archaeological Berms for visual 4. Hydrogeological screening 6 7/21/2020

  7. PROPOSED SITE PLAN – OPERATIONAL PLAN Berms for visual screening Limit of Extraction (orange) Area of 3 m road widening along Lake Ridge Road, as requested by Region of Licenced Boundary Durham (red) Graphic of 3D model depicting final extracted grades. 7 7/21/2020

  8. PROPOSED SITE PLAN – REHABILITATION PLAN Progressive Final grades after rehabilitation and final completion of rehabilitation to follow rehabilitation the direction and sequence of extraction. All equipment, stockpiles, and roads will be removed from Anticipated end use is a site. naturalized, private open space with self- sustaining vegetation. Planting Nuclei Planting Nuclei details 8 7/21/2020

  9. APPROVALS REQUIRED Planning Application Details: Region of Durham Official Township of Uxbridge Township of Uxbridge Plan Amendment Official Plan Amendment Zoning By-law Amendment Current designation: Current designation: Current zoning: Country Side - Oak Ridges Countryside Area RU – Rural (By-law 81-19) Moraine Proposed designation: Application for addition to Proposed zoning: “Policy Area 1.9.9.1 Approved Schedule E – Table ‘E1’, Sub “M3 – Rural Resources Mineral Aggregate Extraction Section 9D Aggregate Resource Extraction” Area” Extraction Areas 9 7/21/2020

  10. APPROVALS REQUIRED Applications Supporting Studies • Technical Background Report (Planning and Summary Statement Report) 1)Region of Durham Official Plan Amendment • Hydrogeological Assessment 2)Township of Uxbridge Official Plan Amendment • Natural Environment Level I and Level II Assessments 3)Township of Uxbridge Zoning By-law Amendment • Stage 1 and 2 Archaeological Assessment • Traffic Impact Study 4)Licence under the Aggregate Resources Act for a • Acoustic Assessment Class A, Category 3 Pit • Memorandum Re: Lighting • Air Quality Assessment • Phase 1 Environmental Site Assessment • Site Plan Applications were peer reviewed and signed-off by Golder Associates, Lake Simcoe Regional Conservation Authority (LSRCA), and Ontario Ministry of Heritage, Sport, Tourism and Culture Industries (MHSTC) 10 7/21/2020

  11. APPLICATION PROCESS - PLANNING Region of Durham – OPA Application Submissions Township of Uxbridge – OPA and ZBA June 2014 Notice of Complete Applications Region of Durham and Township of Uxbridge July 25, 2014 Public Meeting For the Region of Durham OPA January 6, 2015 Public Meeting For the Township of Uxbridge OPA and ZBA January 16, 2015 Peer Review Peer Review by Golder Associates (for Durham Region) and August 2014 to December 2019 Lake Simcoe Regional Conservation Authority (LSRCA) Report to Township Council Prepared by Elizabeth Howson, Macaulay Shiomi Howson Ltd. June 22, 2020 (Planner for Uxbridge Township) Council Resolution That Council advise the Region of Durham that it supports approval June 22, 2020 of Regional OPA application (OPA 2014-008) 11 7/21/2020

  12. APPLICATION PROCESS - PLANNING Peer Review Process: • Natural Environment (Level I & II) LSRCA • Hydrogeological Assessment Sign-off June 27, 2016 • Site Plan • Air Quality Assessment Golder Sign-off December 2, 2019 • Acoustic Assessment Associates • Lighting Memorandum • Stage 1 Archaeological Assessment Sign-off January 28, 2013 MHSTC • Stage 2 Archaeological Assessment Sign-off January 31, 2013 12 7/21/2020

  13. RESULTS OF APPLICATION REVIEW The Site Plan was revised based on Peer Review comments: Lake Simcoe Regional Conservation Authority (LSRCA) • Required groundwater level monitoring for three (3) wells within 500 m of the site prior to operation • Quarterly monitoring for the duration of the licence • Prescribed remedial action if negative impacts occur • Additional native tree/shrub planting in rehabilitation plan 13 7/21/2020

  14. RESULTS OF APPLICATION REVIEW Peer Review on Behalf of Region of Durham: Golder Associates Inc. • Requirement to develop a Best Management Plan for fugitive dust prior to extraction occurring on site. Region of Durham Works Department • No comments from review of Traffic Impact Study 14 7/21/2020

  15. RESULTS OF APPLICATION REVIEW Site Plan was revised based on Peer Review comments: Ministry of Natural Resources and Forestry (MNRF) (1) Existing Features (2) Operational Plan (3) Rehabilitation Plan • Note added regarding 3 m • Disposal of trees, brush and stumps as per O. Reg. 347 • Modifications to phasing of road widening (Lake Ridge • Revised wording for notes regarding Auxiliary Uses of the Site progressive rehabilitation Road) Modifications to phasing for sequence of extraction Additional details added to Tree • • Added calculated area to be No further importation of materials will be permitted once Planting Nuclei Detail • • rehabilitated extraction commences in the final phase • After extraction and rehabilitation, fencing shall be placed along the common licenced boundary should the adjacent licence be surrendered Permitted materials to import: limestone and recycled asphalt, • concrete, gravel, and masonry materials • Requirement for licensee to maintain hydrogeological monitoring records and make them available to MNRF upon request Inclusion of alternate entrance/exit should access through the • adjacent pit (licence #6577) no longer be available 15 7/21/2020

  16. RESULTS OF APPLICATION REVIEW Comments prepared by Elizabeth Howson (Macaulay Shiomi Howson Ltd.) Township of Uxbridge (Report to Council) ✓ Comments Addressed on Current Site Plan ✓ Requirement for pre-extraction baseline residential well surveys subject to accessibility and owner permission ✓ Requirement for tree planting as part of final rehabilitation ✓ List of trees to be planted ✓ Requirement for establishment of “Recommended Procedures for Prevention and Mitigation of Contaminant Spills.” ✓ Requirement for the identification of a specific area for imported material and recycling and the addition of conditions in the Site Plan with respect to recycling ✓ No fuel storage tanks shall be permitted on the site 16 7/21/2020