US 281 AT BASSE ROAD AND JONES MALTSBERGER ROAD SAN ANTONIO Open - PowerPoint PPT Presentation

US 281 AT BASSE ROAD AND JONES MALTSBERGER ROAD SAN ANTONIO Open House Alamo Heights United Methodist Church October 18, 2018 825 E Basse Road 5:00 p.m. 7:00 p.m. San Antonio, Texas 78209 October 18, 2018 US 281 at Basse Road and


  1. US 281 AT BASSE ROAD AND JONES MALTSBERGER ROAD SAN ANTONIO Open House Alamo Heights United Methodist Church October 18, 2018 825 E Basse Road 5:00 p.m. – 7:00 p.m. San Antonio, Texas 78209 October 18, 2018 US 281 at Basse Road and Jones Maltsberger Road

  2. Project Overview  Collaborative effort between TxDOT and the City of San Antonio  Two interchange improvements  Provide full access to US 281 from Basse Road by adding Northbound entrance ramp and Southbound exit ramp and partial Displaced Left Turn (DLT)  Reconstruct Jones Maltsberger Road interchange to a Diverging Diamond Interchange (DDI)  All construction would occur within existing State Right-of-Way 2 US 281 at Basse Road and Jones Maltsberger Road

  3. Environmental Studies – Community Impacts – Historic Resources – Archeological Resources – Air Quality – Traffic Noise – Waters of the U.S./Wetlands – Floodplains – Threatened and Endangered Species – Hazardous Materials 3 US 281 at Basse Road and Jones Maltsberger Road

  4. Project Next Steps Consider Public Final Design Host Schematic Design Comments and & and Preliminary Open Construction Update Schematic Environmental Environmental Study House Design Clearance FALL TBD TBD FALL TODAY 2018 2017 4 US 281 at Basse Road and Jones Maltsberger Road

  5. Environmental Constraints 5 US 281 at Basse Road and Jones Maltsberger Road

  6. Traffic Improvements: US 281 at Basse Road  Adds access to and from Basse Road to US 281  Provides protected movements from exit ramps and at adjacent Jones Maltsberger Road intersection to improve safety  Consolidates existing northbound New Access with exits and southbound entrance Removal of Cloverleaf Ramps ramps to and from Basse Road to US 281  US 281 northbound exit to east Basse Road improvement reduces expected wait time by over 3 minutes (Design Year 2042) 6 US 281 at Basse Road and Jones Maltsberger Road

  7. Traffic Improvements: US 281 at Jones Maltsberger Road  Wait times at Jones Maltsberger Road intersections are reduced by 60 seconds in the afternoon and Saturday peak periods with Diverging Diamond Interchange (DDI) compared to Conventional Improvements (Turn Bays, Capacity, Signal Timing) Conventional Diverging Diamond Existing (2017) Measure of Improvements (2042) Interchange (2042) Intersection Effectiveness Afternoon Saturday Afternoon Saturday Afternoon Saturday Jones Maltsberger Rd at US 281 Delay (s) 37.9 32.4 102 99 32 31 NBFR Jones Maltsberger Rd at US 281 Delay (s) 173.2 75.6 93 83 24 26 SBFR 7 US 281 at Basse Road and Jones Maltsberger Road

  8. Project Funding Funding for Project Construction is not currently identified Estimated Construction Cost: Basse Road: $6.8 Million  Jones Maltsberger Road: $5.0 Million  8 US 281 at Basse Road and Jones Maltsberger Road

  9. Provide Your Comments Opti tions s for Comment nting ng 1. 1. Complete a wr written com comment ca card 2. 2. Email ail comments t to: US281_B _Basse sse_Jo Jone nesM sMaltsb tsberger@e @emailatg tg.com 3. 3. Provide verbal com comments on onsite to o cou court reporter 4. 4. Mai Mail comments t to: ATG Allian ance T Tran ansportation G Group Attn: : Eric G Galindo, P , P.E. E. 11500 Me Metric B Blvd vd, Suite 1 150 Austi tin, n, T TX 78758 Deadl dline f for comme mments : : Novemb mber er 2, 2 2018  For more in informat ation p pleas ase vis isit it www.txdot.gov and d use k e keywords “U “US S 281 B Basse e Road” d” 9 US 281 at Basse Road and Jones Maltsberger Road

  10. Closing Remarks Thank Y You for Your Parti ticipati tion! The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT 10 US 281 at Basse Road and Jones Maltsberger Road