Trial Assembly Structure at Ash River TASAR Summary William Miller - PowerPoint PPT Presentation

Trial Assembly Structure at Ash River TASAR Summary William Miller University of Minnesota March 11 th , 2016 Status TASAR We have a preliminary design completed for the TASAR Final design and approval by the project and UMN May


  1. Trial Assembly Structure at Ash River TASAR Summary William Miller University of Minnesota March 11 th , 2016

  2. Status TASAR • We have a preliminary design completed for the TASAR • Final design and approval by the project and UMN May • Structure completed by September WHM- March 10, 2016 2

  3. Trial Assembly Schedule • Goal is to test assembly procedures and mechanical connections and materials handling equipment – June-Design review for Rail system – October-Install rail system – Mid-October ready for prototype CPA and field cage to trail assembly – Flexibility in the schedule as parts become available • Need to adjust current schedule to show that full scale trial assembly will not happen with production pieces in May/June 2017 all testing will be with prototype/pre-production pieces that meet approved design specification (No APA’s) WHM- March 10, 2016 3