transport for london london rail london overground east
play

Transport for London, London Rail London Overground East London - PowerPoint PPT Presentation

Transport for London, London Rail London Overground East London Railway & Stations Improvements Public Meeting: Naborhood Centre, Sydenham Road 14th March 2007 Introducing London Overground Dalston Curve NLR and ELR Connection;


  1. Transport for London, London Rail London Overground East London Railway & Stations Improvements Public Meeting: Naborhood Centre, Sydenham Road 14th March 2007

  2. Introducing ‘London Overground’ Dalston Curve NLR and ELR Connection; the Orbirail Network

  3. Overground - the regeneration railway Dalston Curve Brockley Honor Oak Park Forest Hill ELL Phase 2 (Uncommitted) Sydenham

  4. Station challenges Example: Sydenham, 2006 Poor waiting facilities and accommodations Difficult station access and poor signage Poor interior station layout (difficult access to ticket office) 4

  5. Overground stations • November 2007: TfL takes over existing North London stations • Four stage approach: � Enabling works/Oyster/Gating � Blitz clean � Refurbishment: includes upgraded information, help points and CCTV � Rebuild some stations • Lewisham stations served by London Overground : � Sydenham; Honor Oak Park; Brockley; Forest Hill; New Cross Gate; New Cross � Network Rail via the DfT funding under Access for All will introduce step free access • Improvement package for refurbished stations : better waiting facilities, better lighting, CCTV, help points, provision of Oyster validators and ticket vending machines 5

  6. New trains on London Overground • Contract awarded to Bombardier • £223M contract to deliver: – 20 x 4 car units (ELR) December 09 – 24 x 3 car units (NLR) December 08 • Constructed in Derby & maintained at New Cross Gate • Key features include: wider seats, wheelchair provision, CCTV, audio and visual real time information, wider gangway, better hand rail, air conditioning, walk through carriages, regenerative braking 6

  7. Overground infrastructure; East London Line Project • £40m Enabling Works finished January 2007 included bridge works, arch repairs and preparation of track formation • Main Works Contract let in October 2006, includes remainder of works including a dedicated new depot at New Cross Gate Line closure 22 nd December 2007 • • Re-opening to West Croydon and Crystal Palace by June 2010 • Link to Highbury & Islington secured 7

  8. Improved services on the East London Railway • Regular ELL services: 8 trains per hour, all day, and 7 days a week • Overground train stopping at all stations • Operating hours to match LU • Faster journey time to Canary Wharf (between 7 - 11 minutes saving) • Provide improved links to the Docklands , where demand is forecast to increase by circa 80% to 2016 8