Main Access to avoid coming through new estate. Access via the Stanway Western bypass Communication with local residents via social media, letter drops and site clinics. Deliveries to be co-ordinated with Lovell who are


  1.  Main Access to avoid coming through new estate. Access via the Stanway Western bypass  Communication with local residents via social media, letter drops and site clinics.  Deliveries to be co-ordinated with Lovell who are constructing the neighbouring development  Delivery size to be limited due to tight access road Traffic Routes & Segregation Pedestrians Site Welfare All construction traffic Works Boundary Outline of site New 2FE Primary School Lakelands, Colchester Drg No: BCE 4540 /001 Proposed Site Layout

  2. Regular dialogue with local contractors constructing residential areas around the school, particularly with reference to utilities works and road construction Early construction of material lay down and site parking to mitigate impact on local roads, parking and general access Site Welfare units with controlled pedestrian and visitor access to site. Construction Traffic access via newly constructed road Traffic Routes & Segregation School users/pedestrians Site Welfare All construction traffic Works Boundary Selwyn Access Points New 2FE Primary School Hazard (neighbouring site) Lakelands, Colchester Drg No: BCE 4540 /002 Access & Egress to site

  3. Site Frontage & pedestrian entrance. All visitors to sign in and be inducted in Site Welfare. Site Welfare Prior to starting on site, we will register the project with Considerate Constructors. We will ensure that the site boundaries are robust, clean and signage clearly denotes access, egress and contact details for the site team. Our sites are tidy, clean and crucially a safe environment for New 2FE Primary School work. Lakelands, Colchester Drg No: BCE 4540 /003 Access & Egress to site

  4.  Clear signage to be installed.  Muster & Fire Points reviewed and adapted as project develops Narrow access  Site welfare to remain in road (Wagtail same area Mews)  Regular engagement with neighbours and contractors  All vehicles entering school will be escorted to their designated places of work  Vehicle size limited where possible to mitigate effects on local environment  Term dates to be confirmed Main Access to Site Via Wagtail Mews New 2FE Primary School Lakelands, Colchester Drg No: BCE 4540 /004 Construction Zones