Regional perspectives of the Romanian-Hungarian interconnector Three seas initiative 06/06/2019 Szabolcs I. Ferencz 5800 km pipeline The current network ROHU phase I: 0.75 bcma capacity from 2019.10.01. 1.75 bcma capacity from the


  1. Regional perspectives of the Romanian-Hungarian interconnector Three seas initiative 06/06/2019 Szabolcs I. Ferencz

  2. 5800 km pipeline The current network

  3. ROHU phase I: • 0.75 bcma capacity from 2019.10.01. • 1.75 bcma capacity from the beginning of 2020 ROHU phase II: • Open Season deadline prolonged until 2019.10.01. • 4.4 bcm from 2022.10.01.

  4. Świnoujście LNG terminal KRK LNG terminal Black Sea gas project

  5. Świnoujście LNG terminal KRK LNG terminal Black Sea gas project

  6. Świnoujście LNG terminal KRK LNG terminal Black Sea gas project

  7. What do we need? Three Seas & new sources! Thank you for your attention! fgsz.hu