the following warm safe and dry scopes are included in
play

The following warm, safe and dry scopes are - PowerPoint PPT Presentation

The following warm, safe and dry scopes are included in the scope of work: Repair brick faade and replace windows Replace HVAC system/controls, including one new boiler and a new chiller


  1. • • • • • • • • •

  2. The following warm, safe and dry scopes are included in the scope of work: ▪ Repair brick façade and replace windows ▪ Replace HVAC system/controls, including one new boiler and a new chiller including CO 2 sensors to adjust outdoor air intake ▪ Replace electrical service, switchgear, panels and distribution ▪ Replace classroom doors with shelter-in-place hardware ▪ Toilet room upgrades and accessibility (5 pairs of group toilets) ▪ Updated clock system, electrical code work, additions as needed to the current fire alarm system ▪ Replacement of ceiling tiles in most corridors and classrooms ▪ Painting of select locations

  3. The following scope of work has started within Log College Middle School: ▪ Ceiling tile & grid removal within corridors (maintaining security & life safety) ▪ De-commissioned 1 of 2 existing boilers ▪ Asbestos removal in select mechanical rooms & boiler room (weekdays) ▪ Asbestos removal in corridor ceilings (weekends) ▪ Replaced main electric meter (last Saturday) ▪ Staff began packing items & purging trash, with boxes moved to storage ▪ Limited brick is being removed to prepare for new roof flashing installation at the lower building exterior walls around the Gym, Auditorium, & Pool ▪ Brick pointing around Gym, Auditorium, & Pool exterior walls at roof level ▪ Brick pointing & repair at lower building at street level (non-classroom bldg.) ▪ MEP rough-in in select areas

  4. • • • • • • • • • • • • •

Recommend


More recommend