system i nfrastructure rehabilitation follow up
play

System I nfrastructure Rehabilitation Follow up Presentation I - PowerPoint PPT Presentation

System I nfrastructure Rehabilitation Follow up Presentation I nformation for the Board of Directors: August 1, 2008 Presented to the Riders Advisory Council September 3, 2008 1 System I nfrastructure Rehabilitation I ssues Provide


  1. System I nfrastructure Rehabilitation Follow up Presentation I nformation for the Board of Directors: August 1, 2008 Presented to the Riders’ Advisory Council September 3, 2008 1

  2. System I nfrastructure Rehabilitation I ssues • Provide responses to Board Member questions regarding: • Provide means of providing customer information on work • Scheduling • A listing of items of work for the first contract • Define single tracking times between effected Red Line Stations • Provide details on DBE participation in contract 2

  3. I ssue # 1 – Customer I nformation on Work I ssue: Customer Access to information on Delays due to our work Response: Enable Customers through the current WMATA web page to navigate via a link to a project web page which would then provide the customer a menu of information such as: • Project Scope • Project Status Report • A Monthly News Letter • Up coming Projects • Frequently Asked Questions • Scheduling information Provide customers with project information through: • Daily alerts via the WMATA web page • An e-mail alert system for customers • PIDS messages to alert customers of work related delays • Floor applique graphics at the bottom of escalators in effected station noting that “Station 3 Rehabilitation work underway to give you a better ride”

  4. 4 I ssue # 2 – Scheduling

  5. I ssue # 3 - I tems of Work I ssue: Provide a listing of the I tems of Work Phase I RED LINE - Judiciary Square to Rhode Island PHASE I Rhode Judiciary Island Square Union Avenue PROJECT # Project Description Station Station Station Track Areas Phase I Total Proposed Budget Sta. Fac. R1-D01-P Upgrade and Enlarge Kiosks at Mezzanine X X X 3 I Syst.. R1-D02-P Upgrade HVAC and Replace A/C units in TCRs X X X 3 I Sta. Fac. R1-J03-P Replace Roll-up Doors at Station Entrances X 1 I Syst. R1-B01-P Replace Ventilation Systems for AC Switchboard Rooms X 1 I ROWS R1-D03-S Upgrade and Replace Platform Slab and Tiles 0 I ROWS R1-D04-S Upgrade and Replace Track Fasteners X 2 I Sta. Fac. R1-D06-S Upgrade Suspended Ceiling Tile X X X 3 I Sta. Fac. R1-D07-S Upgrade Station Signage X X X X 5 I ROWS R1-J05-S Repair and Replace ROW Fence X 2 I ROWS R1-J07-S Repair Concrete of Tunnel Section X 2 I Sta. Fac. R1-J08-S Replace Glass in Station X X X 3 I Sta. Fac. R1-J09-S Install Bumpy Tile X 1 I ROWS R1-D13-S Replace Wood Ties with Concrete Ties I MM ROWS R1-J10-M Repair Tunnel Ventilation Fans X 2 $28M Sta. Fac. R1-B02-M Replace Sewage Ejector Systems X 1 Sta. Fac. R1-B03-M Replace Station Air Conditioning Systems X 1 I Sta. Fac. R1-B04-M Replace Chillers at Metro Center and Farragut North 0 I Sta. Fac. R1-B05-M Rehab Dupont Circle Vault Area 0 I Sta. Fac. R1-B06-M Replace Ventilation and Exhaust Fans X X X 13 I ROWS R1-J11-F Roof Replacement and Canopy Rehabilitation X 1 I Syst.. R1-D08-E Upgrade and Replace Emergency Trip Stations X 4 I Syst.. R1-J12-E 3rd Rail Expansion Joint Installation X 4 I Syst.. R1-J13-E Replace Wall Mounted Tunnel Lights X X X X 6 I Syst.. R1-J14-E Rehab Uninterruptible Power Systems X X X 3 I Syst.. R1-J15-E Replace Traction Power Cables X X X X 5 I Syst. R1-B07-E Replace Electrical Equipment in AC Switchboard Rooms X X 2 I Syst.. R1-B08-E Replace Electrical Equipment at Drainage Pumping Station X 2 I Syst.. R1-B09-E Replace Electrical Equipment at Tie Breaker Stations X X X 3 I Syst.. R1-B10-E Replace Electrical Equipment at Traction Power Substations X 1 I Syst.. R1-D12-C Upgrade Automatic Train Control Systems (Non-Vital) X X X 3 I Syst.. R1-D12-C Upgrade Automatic Train Control Systems (Switches) 0 I ELES R1-B11-V Rehabilitation of Elevators 2 2 I ELES R1-B12-V Rehabilitation or Replacement of Escalators 8 2 10 I Sta. Fac. R1-J01-P Renovate Station Rest Rooms X X X 3 I Sta. Fac. R1-J02-P Rehab Floors of Station Service Rooms X X X 3 I Sta. Fac. R1-J04-P Replace Station Doors X X X 3 I Beyond MM Sta. Fac. R1-D05-S Upgrade and Replace Platform Canopy Skylight System X 1 $11.9M Syst. R1-D09-E Upgrade Station Lighting X X 2 Syst. R1-D10-C Upgrade and Replace PA at Stations X X 2 I Syst. R1-D11-C Upgrade and Replace CCTV at Stations X X 2 I Syst. R1-D12-C Upgrade Automatic Train Control Systems (Vital) X X X 4 I 5

  6. I ssue # 3 - I tems of Work I ssue: Provide a listing of the I tems of Work Phase I I RED LINE - Gallery Place to Dupont Circle PHASE II Gallery Metro Farragut Dupont Place Center North Circle Track Phase II PROJECT # Project Description Station Station Station Station Areas Total Proposed Budget Sta. Fac. R1-D01-P Upgrade and Enlarge Kiosks at Mezzanine X X X X 4 I Syst.. R1-D02-P Upgrade HVAC and Replace A/C units in TCRs X X X 3 I Sta. Fac. R1-J03-P Replace Roll-up Doors at Station Entrances 0 I Syst. R1-B01-P Replace Ventilation Systems for AC Switchboard Rooms X 1 I ROWS R1-D03-S Upgrade and Replace Platform Slab and Tiles 0 I R1-D04-S Upgrade and Replace Track Fasteners X 4 ROWS I Sta. Fac. R1-D06-S Upgrade Suspended Ceiling Tile X X X X 6 I Sta. Fac. R1-D07-S Upgrade Station Signage X X X X 7 I ROWS R1-J05-S Repair and Replace ROW Fence 0 I ROWS R1-J07-S Repair Concrete of Tunnel Section X 4 I Sta. Fac. R1-J08-S Replace Glass in Station X X X X 4 I Sta. Fac. R1-J09-S Install Bumpy Tile X 1 I R1-D13-S Replace Wood Ties with Concrete Ties ROWS I MM ROWS R1-J10-M Repair Tunnel Ventilation Fans X 1 $36M Sta. Fac. R1-B02-M Replace Sewage Ejector Systems X X 2 Sta. Fac. R1-B03-M Replace Station Air Conditioning Systems X 1 I Sta. Fac. R1-B04-M Replace Chillers at Metro Center and Farragut North X X 3 I Sta. Fac. R1-B05-M Rehab Dupont Circle Vault Area X 1 I Sta. Fac. R1-B06-M Replace Ventilation and Exhaust Fans X X X X 12 I ROWS R1-J11-F Roof Replacement and Canopy Rehabilitation 0 I R1-D08-E Upgrade and Replace Emergency Trip Stations X 4 Syst.. I R1-J12-E 3rd Rail Expansion Joint Installation X 4 Syst.. I Syst.. R1-J13-E Replace Wall Mounted Tunnel Lights X X X X X 8 I Syst.. R1-J14-E Rehab Uninterruptible Power Systems X X X X 4 I Syst.. R1-J15-E Replace Traction Power Cables X X X X X 8 I Syst. R1-B07-E Replace Electrical Equipment in AC Switchboard Rooms X X X X 1 I Syst.. R1-B08-E Replace Electrical Equipment at Drainage Pumping Station 0 I R1-B09-E Replace Electrical Equipment at Tie Breaker Stations X X 2 Syst.. I R1-B10-E Replace Electrical Equipment at Traction Power Substations 0 Syst.. I Syst.. R1-D12-C Upgrade Automatic Train Control Systems (Non-Vital) X X 2 I Syst.. R1-D12-C Upgrade Automatic Train Control Systems (Switches) X 3 I ELES R1-B11-V Rehabilitation of Elevators 4 1 2 9 I ELES R1-B12-V Rehabilitation or Replacement of Escalators 4 16 7 11 49 I Sta. Fac. R1-J01-P Renovate Station Rest Rooms X X X X 4 I Sta. Fac. R1-J02-P Rehab Floors of Station Service Rooms X X X X 4 I Sta. Fac. R1-J04-P Replace Station Doors X X X X 4 I Beyond MM Sta. Fac. R1-D05-S Upgrade and Replace Platform Canopy Skylight System 0 $21.4M Syst. R1-D09-E Upgrade Station Lighting X X X X 4 R1-D10-C Upgrade and Replace PA at Stations X X 2 Syst. I R1-D11-C Upgrade and Replace CCTV at Stations X 1 Syst. I Syst. R1-D12-C Upgrade Automatic Train Control Systems (Vital) X X X 3 I 6