Recycling and Conservation May 22, 2014 Kieran Barrows Facilities Engineer Chip MacLaughlin Water Resource Engineer Stratigraphic Display of 4 Stack Development Not to scale Represents ~5,000 ft 1 NYSE : LPI | www.laredopetro.com


  1. Recycling and Conservation May 22, 2014 Kieran Barrows – Facilities Engineer Chip MacLaughlin – Water Resource Engineer

  2. Stratigraphic Display of 4 Stack Development Not to scale Represents ~5,000 ft 1 NYSE : LPI | www.laredopetro.com

  3. Integrated Water Resources/Facility 2 NYSE : LPI | www.laredopetro.com

  4. 4 Stack Pad and Facility Layout Future Future Well Well Well Well LP Fuel Gas to Well Pad Rig ~150 psig Metered GL gas Future Future Well Well Well Well 3 Phase LP Fuel Gas to Rig ~150 psig FWKO LP Gas Oil Water 3 Phase Metered GL gas Well Pad Heater Treater LP Gas Oil Intermediate Pad Oil LP Gas To Central Water Tank Battery HP Gas for GL ~1100 psig LP Fuel Gas ~150 psig 3 NYSE : LPI | www.laredopetro.com

  5. Typical Production Corridor 4 NYSE : LPI | www.laredopetro.com

  6. Water Resource Requirements for 4 Stack, 4 Rig Development Corridor  Average Frac Rate (per well): 100 bbl/min  Total Water Used (per well): 300,000 bbl  Average Drill Time (per well): 25-30 days  7500’ Laterals  1 Rig for 4 Stack Lateral Water Usage: 1.2 MM bbl/month/pad 5 NYSE : LPI | www.laredopetro.com

  7. Recycle Water Availability 4 Drilling Rigs - 4 Fracs per Month Water Sources: 1,400,000  Brackish Waters 1,200,000  Flowback water  Produced Water 1,000,000 BBL of Frac Water  Fresh Water 800,000 GOAL: 600,000 400,000 A 50% reduction of fresh water usage by 200,000 4Q 2016. 0 0 4 8 12 16 20 24 28 32 36 40 44 48 Month Flowback Water Recovery Other Water Sources 6 NYSE : LPI | www.laredopetro.com

  8. Recycle Plant Treatment Facility 75,000 BPD at Capacity  34 Acres  75,000 BPD via 12” pipeline and truck unloading  825 HP pumping capability  Qty. 3 – 300,000 bbl double lined pits with leak detection  SCADA connected  Water treating to slick water frac standards 7 NYSE : LPI | www.laredopetro.com

  9. Closing Thoughts Laredo is striving towards the goal of 100% use of flowback and produced water for drilling and completing operations. To achieve a sustainable water supply system to support exploration and production efforts, water resources must be viewed in an integrated fashion, including  Development of water pipelines in production corridors  Connection of multiple high volume frac pits across large production areas  Recycle facility connectivity to production corridors  Development of non-potable water resources 8 NYSE : LPI | www.laredopetro.com