Sterling Hydrotech Ltd. Sterling Hydrotech Ltd. Introductory Presentation
About us us… …. . About • Limited Company since 1988 Limited Company since 1988 • • One of the UK One of the UK’ ’s largest independent s largest independent • Water Treatment Installation Water Treatment Installation Companies Companies • UK UK- -wide after sales / service team wide after sales / service team • • Quality Assured to ISO9001:2008 Quality Assured to ISO9001:2008 •
Health & Safety Health & Safety Engineers qualifications Engineers qualifications CCNSG Supervisory Level CCNSG Supervisory Level • • Confined Space Trained Confined Space Trained • • Nebosh Qualified Nebosh Qualified • •
Health & Safety Health & Safety
Health and Health and Safety Safety Risk Assessment Risk Assessment
Health and Safety Health and Safety RECOMMENDED LABOUR SCHEDULE - ROUTINE SERVICE Clients Nottingham County Council. Address: Annersley School, Forest Road, Annersley Woodhouse, NG17 9BW Contact: Tony Askew Telephone: 01623 ______________________________________________ During a routine service visit by a Sterling Hydrotech engineer. The following items shall be performed and recorded on the work reports provided . 1.1) Check for quality of water. 1.2) Inspect and overall the Pool Filters, the valves, the Dosing pumps and Controllers, the UV units and comment on the overall condition of the plant room equipment. 1.3) Inspect the filter media condition and remove sample for analysis, if required. Method Statement Method Statement 1.4) Inspect and clean dosing pumps. 1.5) Check the level chemicals in the day tanks. 1.6) Check the daily and weekly log sheets for any problems. 1.7) Check and test the Filter and dosing equipment functions from the main control panel. 1.8) Carry out a final treated water test to ensure the water specification is within the design parameters and record. 1.9) Complete a work report along with a plant parameter checklist, complete with signatures and leave one copy on site. 1.10) Discuss and initiate any immediate action following the service. The above preventative maintenance schedule shall be carried out on a periodic basis and will be completed in conjunction with a full service, by a Sterling Hydrotech engineer. Most of the items can be carried out with out any interruption to the production facility. However, there may be a need to Bypass some of the systems for maintenance for a short period to enable our engineers to complete certain service procedures and functions. The unit shall be placed on bypass for this time. Darryl Hutchinson c.c. Cindy Biggin Phil Tandy John Barnett Pete Biggin
Health & Safety Health & Safety
Trade and Corporate Affiliates Trade and Corporate Affiliates
Quality Quality ISO 9001:2008 ISO 9001:2008
Sterling’ ’s Activities s Activities Sterling Our business is split into 4 areas Our business is split into 4 areas • Pools Pools • Local authority (Public pools, Schools), Private Local authority (Public pools, Schools), Private (Hotels, Leisure, Schools), NHS (Hydrotherapy), (Hotels, Leisure, Schools), NHS (Hydrotherapy), MOD MOD • Industrial/Commercial Food, Beverage, Healthcare, Industrial/Commercial Food, Beverage, Healthcare, • Chemical Chemical • Municipal Municipal • Water Companies Water Companies • Service Service • Pre- -Planned Maintenance, Emergency call Planned Maintenance, Emergency call- -outs, outs, Pre Spares Spares
Pools Pools
Service Service
Pools Division Pools Division • Local authority Local authority • Leisure centre pools, Spas, School pools, Leisure centre pools, Spas, School pools, Hydrotherapy pools Hydrotherapy pools • Private Private • Hotels, Leisure facilities, Schools Hotels, Leisure facilities, Schools • NHS NHS • Hydrotherapy pools Hydrotherapy pools • MOD MOD • Pools/Spas Pools/Spas Diver training pools Diver training pools
Pools Division Pools Division Products and services roducts and services • Provide Turnkey projects from Design to Build Provide Turnkey projects from Design to Build • for new and refurbishment projects for new and refurbishment projects • Pre Pre- -Planned Maintenance contracts to tailored Planned Maintenance contracts to tailored • to the customers needs to the customers needs • Emergency call Emergency call- -outs outs • • Training and technical support. Training and technical support. •
Pools Division Pools Division • Filter Vessel refurbishment: Filter Vessel refurbishment: • • Installation of new Manways Installation of new Manways • • Vessel re Vessel re- -lining lining • • Ultrasonic thickness testing Ultrasonic thickness testing • • Filter underdrain systems Filter underdrain systems • • Media changes using a vacuum tanker (Sand Media changes using a vacuum tanker (Sand • and glass media) and glass media)
Pools Division Pools Division
Pools Division Pools Division Energy Management Energy Management Installation of inverter drives Installation of inverter drives • • Swimming pool covers Swimming pool covers • • Installation of Heat Exchangers Installation of Heat Exchangers • • Installation of UV systems Installation of UV systems • •
Pools Division Pools Division
Pools Division Pools Division • Plant pipework fabrication and replacement Plant pipework fabrication and replacement • • New chemical dosing and control systems New chemical dosing and control systems • • Bulk chemical storage and tankage systems Bulk chemical storage and tankage systems •
Pools Division Pools Division
Pools Division Pools Division • Diving Services Diving Services • • Retiling, acid washing Retiling, acid washing • • Circulation Pumps Circulation Pumps •
Pools Division Pools Division
Sterling Hydrotech Ltd Sterling Hydrotech Ltd Freshwaters, Park Road, Holmewood, Chesterfield, Derbyshire S42 5UY Tel: 01246 857000, Fax 01246852200 Email enquiries@sterling-hydrotech.co.uk Web www.sterling-hydrotech.co.uk
Recommend
More recommend