STAGE 3 Executive Committee STAGE 3 April 23, 2018 SM T MEETING M ARCH 21, 2018
Agenda • Project Status • Packaging the Plan • Strategies and Action Plans • Walking • Cycling • Transit • Streets • Emerging T echnologies • Next Steps TRANSPORTATION & TRANSIT
Study Process October - December 2017 J anuary – April 2018 M ay – J une 2018 April – September 2017 • Further Technical Analysis • Refine and Finalize Long-Term Concepts • Public Engagement • Develop Short, Medium, and Long-Term Priorities • Draft Plan • Present to Council (April 2018)
February 2018 Engagement Four public events with over 160 interactions • Abbotsford Centre: 76 • MCA: 22 • Library: 45 • Highstreet: 18
Plan Themes
Walking Strategies a. Expanded Network of Sidewalks and Pathways b. Enhanced Street Treatments for Major Destinations c. Safety and Accessibility Improvements d. Support Programs
Walking Strategies FOCUS FOR TODAY a. Expanded Network of Sidewalks and Pathways b. Enhanced Street Treatments for Major Destinations c. Safety and Accessibility Improvements d. Support Programs
a. Expanded Network of Sidewalks Coverage Standard: • Arterials (2 sides) • Collectors (2 sides) • Local streets (1 side) Potential Expansion • 100km of sidewalks
a. Expanded Network of Sidewalks
a. Expanded Network of Sidewalks Phasing Plan Phasing
Implementation Plan – Walking • Long-Term Sidewalk Expansion: $40-50M* • Short-Term Priorities (<5 year): a. Implement approximately 4 to 6 km of new sidewalks at existing levels of funding ($500,000/ yr). b. Encourage additional new sidewalks to be constructed through redevelopment. c. Consider additional dedicated funding for: • Enhanced street treatments • Safety and accessibility improvements (ie crosswalks, curb letdowns) • Support programs (ie Safe Routes to School) * Costs in 2018 dollars
Financing Plan – Walking Potential Funding Increases for M edium- and Long-term Status Quo : $12.5 million / 25 years à approx. 30 km of new sidewalks Incremental Increase : $17.5 million / 25 years à approx. 40 km of new sidewalks Medium- Short- Long- term term term $1,000,000 $750,000 $500,000 $250,000 $0 S tatus Quo Incremental Increase
Cycling Strategies a. Complete, connected bicycle network b. Support Facilities c. Support Programs
Cycling Strategies FOCUS FOR TODAY a. Complete, connected bicycle network (Long-term) b. Support Facilities c. Support Programs
a. Complete Connected Network Long-term Network Plan (270km) Facility Types \ 400m AAA Network buffer S ignature Bike Corridor (6km) AAA Bike Facilities (107km) S upporting Bike Facilities (160km)
a. Completed Connected Network Phasing Plan Phasing
Implementation Plan - Cycling • Long-Term Cycling Network: $50-60M* • Short-Term Priorities (<5 years): a. Construct high priority bicycle routes at existing funding levels ($300,000/ yr). b. Leverage and maximize grant funding (Bike BC, Federal Funding). c. Coordinate with development to provide AAA network. d. Consider additional dedicated funding for support facilities and programs. * Costs in 2018 dollars
Financing Plan - Cycling Potential Funding Increases for M edium- and Long-term Status Quo : $7.5 million / 25 years à approx. 30 km of new bike routes* Incremental Increase : $12.5 million / 25 years à approx. 50 km of new bike routes* Medium- Short- Long- $1,000,000 term term term $750,000 $500,000 $250,000 $0 Status Quo Incremental Increase * assuming grant opportunities leverage City spending with an additional 40% funding
Transit Strategies a. Enhanced transit network - Long-term Vision (25 year) - Short-term (2019-2024) b. Transit priority measures c. Transit customer experience
Transit Strategies FOCUS FOR TODAY a. Enhanced transit network - Long-term Vision (25 year) - Short-term (2019-2024) b. Transit priority measures c. Transit customer experience
a. Enhanced Transit Network Long-T erm Vision Local Transit Improvements Regional Transit Improvements TRANSPORTATION & TRANSIT
Improving Transit in Stages Short-term (5 years) Phase 1 (2019) Address Core Area Highstreet City Centre Phase 2 Historic Downtown (2020-2024) Increase Service Levels UDistrict TRANSPORTATION & TRANSIT
Implementation Strategy • • Bourquin Exchange • Improve service Re-alignment of the Routes 1, 2 and 3 in phased out reliability and continue • Expand capacity at UFV year 1 to invest in the frequent • • Downtown hub gets Opening of new transit transit routes • Identify and develop a centre significant on-street • First phase of enhancements more comprehensive • New transit hub expansion to improve plan for the Rapid service reliability, introduced at Whatcom Transit Corridor and the improve service on key with associated service associated service corridors changes integration • • Increased connectivity at • Consider opportunities Introduction of Highstreet Transit hub Highstreet hub for LRT over long-term • Continued service reliability improvements, investments in core transit network, possible expansions to new service areas
Implementation Plan - Transit Long-Term: $10M* Short-Term • No additional resources in Y ear 1 with focus on realigning existing routes • Increased operating funding over short-term • Continue to increase service hours and funding over the medium- and long- term • Shelters and accessibility improvements (2 bus stops per year) * Costs in 2018 dollars TRANSPORTATION & TRANSIT
Financing Plan – Transit M edium-Term and Long-Term: • Increased funding for shelters and accessibility • Downtown hub (estimated $2M over short-term) • UFV, Highstreet and Whatcom exchanges ($1-2M each over medium-term) Downtown Hub $2,500,000 Other Exchanges $2,250,000 $2,000,000 $1,750,000 $1,500,000 $1,250,000 $1,000,000 $750,000 $500,000 $250,000 $0 Status Quo Incremental Increase Transit Hubs TRANSPORTATION & TRANSIT
Streets Strategies FOCUS FOR TODAY a. Street Network Improvements I. Major Network Improvements II. Other Network Improvements b. Goods Movement c. Emerging T echnologies
a. Street Improvements Major Network & Intersections M ajor Intersections M ajor Network
a. Street Improvements Major Network & Intersections Phasing Plan Phasing
Implementation Plan - Streets • Long-Term Street Improvements : $250M* • Short-Term Priorities (<5 years): a. Implement committed works (South Fraser Way, Vye Road, Mt Lehman Road and King-M arshall Connector) b. Support provincial highway investments to widen Highway 1 and improve interchanges c. Work towards South Fraser Way reconfiguration through development d. Begin planning for M cKee Connector e. Signals and minor intersection improvements * Costs in 2018 dollars TRANSPORTATION & TRANSIT
Financing Plan - Streets Sample projects with illustrative project phasing for discussion M acLure Connector City contribution to $40,000,000 M OTI interchanges $35,000,000 Fraser Highway (Phase 3) Fraser Highway (Phase 2) Whatcom Road $30,000,000 $25,000,000 $20,000,000 $15,000,000 GFW Widening + SFW $10,000,000 $5,000,000 $0 Traffic Signals Other Improvements Rail Crossing Improvements Major Projects Interchanges and Overpasses TRANSPORTATION & TRANSIT
Funding Sources Funding Sources GRANTS • Long-term affordable plan • Costs are distributed over time COM M UNITY WORKS FUND • M ajor projects expected to be funded DEVELOPM ENT COST 2/ 3 by grants CHARGES (DCCs) RESERVES DEBT* * (only if required) TRANSPORTATION & TRANSIT
c. Emerging Technologies 1. Intelligent Transportation Systems § Real time information to drivers § Dynamic corridor signal coordination § Transit signal prioritization § Connected vehicles and vehicle-to- infrastructure applications Existing Private / Public Charging Station Locations 2. Electric Vehicles § Additional public charging stations § Consider residential parking requirements to include electric outlets § Consider more electric and alternative energy vehicles into the City’s fleet
c. Emerging Technologies 3. New M obility / M obility Service Choosing different modes for each trip segment such as: § Bike Share § Car Share § Ride Hailing § Transit 4. Autonomous Vehicles § Implications of autonomous vehicles: accessibility, safety, mobility, parking demand, public transit, multi-modality, and land-use. § Long-range vision to leverage the technology. § Recognize potential changes to TMP priorities and phasing.
Next Steps M ay – J une 2018 J anuary – April 2018 • Further Technical • Final Plan Analysis • Present to Council • Refine and Finalize Long- (June 2018) Term Concepts • Public Engagement • Develop Short, Medium, and Long-Term Priorities • Draft Plan • Present to Council (April 2018)
RECOM M ENDATIONS THAT the Parks, Recreation and Culture Master Plan Stage 3 – Draft Plan, be received for information; and THAT staff be directed to proceed to Stage 4 – Final Plan of the Parks, Recreation and Culture Master Plan.
Recommend
More recommend