St Stra rategic egic CSR SR an and d Busin Bu siness De ess Develo elopment pment Cas ase e St Stud udy (2011-20 (2 2013) 3) BY KE KENY NYA A BIXA XA LTD 1
Kenya ya Bixa ISO 9001 and ISO 22000 Certified company based in South Coast whose core business is processing of Nor-bixin and bixin powder with annual turnover of 120 Tons established in 1979. CSR Community Water borehole Labour ur Child labour: Sensitization throughout the supply chain Health th and safety ety Risk assessment First aid kits Health and Safety Committee Environment nment & Energy Bio – gas and biomax manure Plant 2
Child labour used to exist at the farm level integrated as a cultural value. Conducted 10 sensitization meetings Outcome Most of The children attend school Busine siness s benefit its: s: Assurance of better working condition through the supply chain and cordial relationship with the suppliers and the farmers and Compliance with Global Legal requirements on child labour 3
1400 Current contracts farmers appx. 350. 1200 Bixa acreage of 1,750. 1000 Annual seeds collected 800 Contract 1200 Tons. farmers 600 Seeds in Tons 400 200 0 2010201120122013 4
Contract tract fa farme mers Pa Parameters s Output put Acreage 250 trees per acre Given free by KBL Harvest 2 times per year 16kgs per year per tree Revenue Kshs. 40 per kg Kshs. 160,000 per year per Acre 5 acres Kshs. 160,00 x 5 Kshs. 800,000 Expenses Appx. Kshs. 200,000 Kshs. 600,000 5
Began business in 1986 SAL ALES IN TONES ES Purchase 75% of our 90 production. 80 2006 – 2009 we were not able to fully supply because 70 there was very little raw 60 material we were unable to get 50 substantial orders from 40 Tones Chr. Hansen 30 Through Susbiz programme secured a visit by Mr. 20 Stevenson the Global 10 Sourcing director 0 2013 to sign contract of 50 2000 2002 2004 2006 2008 2010 2012 Tons because of 6
Cost of installation 4,188,414.00 Operation Expenses and payback period Since Diesel savings Norbixin Norbixin Savings in Diesel Consumption per year Powder Powder/ Ltr Ksh YEAR Litres Cost Kgs Kg/Ltr Lrs 2008 11,500 577,875.00 32,684 2.84 2009 6900 376,050.00 20,098 2.91 2010 17650 1,155,898.00 34,965 1.98 8,051.92 748,831.35 2011 0 - 20,935 9,053.08 887,201.84 2012 0 - 23,538 23,692.31 2,440,307.93 2013 61,600 1,358,779.00 Average savings per Year 3 Year Recovery period Cost of project/ / annual savings 7
Provision of full equipped First aid kits Trained committee Emergency preparedness and pictorial signs in place Training on proper use of PPE Conducted risk assessments 8
9
10
11
12
THE END 13
Recommend
More recommend