Scotland Route Study Scotland Route Study Working Group 9a 4-Sep-17 / 1
Scotland Route Study Agenda 1. Welcome and Introductions 2. Summary of feedback received on the Draft for Consultation 3. Further timetable development undertaken/planned 4. Further technical development undertaken/planned 5. Further demand forecasting undertaken/planned 6. Next steps 7. AOB 4-Sep-17 / 2
Scotland Route Study Summary of feedback received on the Draft for Consultation 4-Sep-17 / 3
Scotland Route Study Summary of feedback received to date Graeme Dey (MSP Angus South) – Montrose/Usan • Public Hire Taxi Trade – integration of taxis to stations • Levenmouth Rail Campaign • Margaret McCulloch – electrification and enhancement of East Kilbride line • The Glenrothes Area Futures Group – many and varied • CLEAR (Community-Led Environmental Action for Regeneration) – Levenmouth • Arbroath FC Supporters – Levenmouth • North Ayrshire Council – supportive (small parcel deliveries and electrification • proposals) Frank McAveety (Councillor) and Glasgow Airport Access Project – expressing • disappointment that GAAP is not included in the Route Study (press article) Friends of the Far North – reasonably supportive • Strathallan CRP – reasonably supportive and new Blackford station • East Lothian CRP – reasonable supportive • 4-Sep-17 / 5
Scotland Route Study Summary of feedback received to date Met with all RTP’s (except SPT) • SEStran – new railway/STAG/LDMS/forecasts/Fife Bypass • Tactran – alleged bias against Perth and Dundee in forecasts • HITRANS – rolling stock/far north • Nestrans – Electrification roll out, City Deal + • Met with MP’s in Westminster • Met with MSP’s in Holyrood • Presentation to SCDI • Meetings planned with East Lothian Council and Perth & Kinross • Council 4-Sep-17 / 6
Scotland Route Study Further timetable development undertaken/planned 4-Sep-17 / 8
Scotland Route Study Further timetable development undertaken/planned Edinburgh Waverley – train lengthening instead of increasing frequency • Glasgow Central – train lengthening instead of increasing frequency • ECML – additional infrastructure and freight scenario • WCML – additional infrastructure, HS2 splitting/joining and freight scenario • East Kilbride – electrification and enhancement • Barrhead/Kilmarnock/Barassie - electrification and enhancement • Far North – conventional signalling and additional infrastructure • Central Belt to Aberdeen/Inverness - electrification and enhancement • Aberdeen to Inverness - enhancement • 4-Sep-17 / 9
Scotland Route Study Further technical development undertaken/planned 4-Sep-17 / 10
Scotland Route Study Further technical development undertaken/planned GRIP 3 development ongoing on Carstairs Junction remodel • GRIP 2 development nearing completion for Portobello Junction • remodel GRIP 3 development ongoing on Slateford Junction remodel • GRIP 3 (inc AIP) development work about to commence for • electrification of Edinburgh Suburban line Initial Perth “masterplan” meeting held • Dunblane to Perth enhancement • Dunblane to Perth electrification • Perth Station and infrastructure remodel • Millerhill “masterplan” meeting held • 4-Sep-17 / 11
Scotland Route Study Further demand forecasting undertaken/planned 4-Sep-17 / 12
Scotland Route Study Next steps 4-Sep-17 / 17
Scotland Route Study Next steps Consultation period closes 10th March • Working Group 10: 13th April (Progress and emerging issues) • Board Meeting 5: 14th April (Progress and emerging issues) • Working Group 11: 16th June (Presentation of final document) • Regional Working Group 6: May/June • Board Meeting 6: 30th June (Seek approval to publish) • Publish final document: 14th July • 4-Sep-17 / 18
Scotland Route Study AOB 4-Sep-17 / 19
Scotland Route Study Scotland Route Study 4-Sep-17 / 20