School District Resources Birch Grove ES Built 1999 / 2003 - PowerPoint PPT Presentation

School District Resources Birch Grove ES Built 1999 / 2003 Renovation 72,949 sf; Grades PK-2; 580 Students +/- Open Plan; Integrated Day Program Tolland Intermediate Built 1971 / 1974 Renovation 109,126 sf; 8 Portable CRs Grades 3-5;


  1. School District Resources Birch Grove ES Built 1999 / 2003 Renovation 72,949 sf; Grades PK-2; 580 Students +/- Open Plan; Integrated Day Program Tolland Intermediate Built 1971 / 1974 Renovation 109,126 sf; 8 Portable CRs Grades 3-5; 670 Students +/- Open Plan; Integrated Day Program Tolland Middle School Built 1966 / 1983 Renovation 136,531 sf;; 2 Portable CRs Grades 6-8; 690 Students +/- Tolland High School Built 2006 230,000 sf; Grades 9 – 12; 900 Students +/-

  2. SEP OCT NOV DEC JAN Concept Concept Document Document Strategic Strategic Strategic Strategic Planning Document utilization study design documents design documents Planning Document Planning Document Planning Document utilization study … to study completion STEP 5 /6 / 7 Visioning Visioning options and alternatives options and alternatives GO! STEP 3 /4 Listening Listening collecting information collecting information STEP 2 Collecting existing conditions STEP 1

  3. BY SCHOOL

  4. BY SCHOOL

  5. Facilities Assessment facility utilization study KEY COMPONENT of ASSESSMENT  Access Improvements accessibility, ADA / MAAB compliance…  Building Improvements foundation, structure, roof construction…  Building MEP plumbing fixtures, life safety, electrical…  Interior Spaces interior finishes, space utilization, fixtures…

  6. Space Needs Assessment facility utilization study  Educational program  Classroom size shared spaces, Special Ed areas, etc. target: 20 students per CR  Classroom count  Potential changes building capacity, flexibility grade reconfiguration, modular CR’s, full-day K

  7. Current School Year

  8. Option A Do Nothing Option

  9. Looking ahead: 2023-24 Option A Do Nothing Option

  10. Option B Option C Planned Maintenance & Full-Day Kindergarten Renovated Proactively & Full-Day Kindergarten

  11. Option D1 Two K-5 Elementary Schools

  12. Option D2 Two K-5 Elementary Schools; Flip Middle School with High School

  13. Option E1 Close TIS; Add at High School

  14. Option E2 Close TMS; Add at High School

  15. Option E3 Close TMS; Add at Birch Grove and High School

  16. Option F New K-8 Elementary Schools