s a f e t y m i n u t e c o r p o r a t e a l i g n m e n
play

S A F E T Y M I N U T E C O R P O R A T E A L I G N M E N T L O G O - PowerPoint PPT Presentation

S A F E T Y M I N U T E C O R P O R A T E A L I G N M E N T L O G O C O R P O R A T E M V V Founded in 1957 A group of companies composed of more than 50 subsidiaries operating in 6 major geographical areas: CIS, Asia, Middle East,


  1. S A F E T Y M I N U T E

  2. C O R P O R A T E A L I G N M E N T L O G O

  3. C O R P O R A T E M V V

  4. • Founded in 1957 • A group of companies composed of more than 50 subsidiaries operating in 6 major geographical areas: CIS, Asia, Middle East, Europe, Africa & Turkey • 476 projects in 45 countries, with historical value of US$ 41 billion • Turnover $6,6 B (2015) • Amongst the top 100 international construction contractors of the World since 1982 • Ranked # 65 in ENR Top 250 International Contractors in 2015 • 21,500 people • Traded publicly in Istanbul Stock Exchange, Market Cap $10 B • Holds ISO 9001, OHSAS 18001 & ISO 14001 and ASME certificates • Shares the vision & goals of its customers, adopts to their needs and to local conditions BUSINESS LINES: • Engineering & Construction, Power, Real Estate, Trade

  5. C I M T A S G R O U P A b o u t • A subsidiary of ENKA • Incorporated in 1973 in Turkey as a local steel fabricator now an EPFI group of 5 companies: Gemlik, Turkey: • Cimtas Steel, www.cimtas.com • Cimtas Pipe Fabrication and Trading Ltd. Co., www.cimtaspipe.com • Cimtas Precision Machining Industries and Trading Ltd. Co. www.cimtasmachining.com Kocaeli, Turkey: • Cimtas Module and Shipyard, www.cimtasshipyard.com Ningbo, China: www.cimtasnbo.com • Cimtas Ningbo Steel Processing Co. Ltd., • 3,550 people including 300 engineers • With Activities in • Engineering (structural, pressure vessels, piping, plant engineering) • Fabrication (7 fabrication shops including pipe/fitting production and machining shops, 6 in Turkey & 1 in China, over 210,000 tons/year total capacity) • Modularization (Pre-assembled racks, Pre-assembled units) • Installation - Structural & Mechanical & Electrical (domestic and overseas jobsites) • Shipbuilding (powerships, barges, tankers / gas carriers)

  6. C I M T A S M O D U L E & S H I P Y A R D

  7. L O C A T I O N Gölcük COORDINATES KOORDİNATLAR 40 °43’29.41” K (N) 29 °51’59.38” D (E) Motorway Access Proximity to 3 International Sea Ports 1.5 hrs /120 km from Istanbul Autoport 0.5 km 1.5 hrs /100 km from Gemlik 30 min / 59 km from Yalova Limaş 1.5 km Fast Ferry from Istanbul Derince 20 km 75 min (European side – Yalova) 45 min (Anatolian side – Yalova)

  8. C I M T A S M O D U L E & S H I P Y A R D • Founded in 2005 as Soli Shipyard in Kocaeli Free Trade Zone • A subsidiary of ENKA • A member of Cimtas Group • Acquired by Cimtas Group in September, 2010 • Dedicated Services • Integrated Engineering (PDMS, Tekla, etc.) • Procurement • Pre-fabrication / Fabrication / Installation • Blasting, Painting • Shipbuilding / Modularization • Zero Accident Programme (ref: OHSAS 18001:2007) • Lean, Kaizen, 5S + 2S Programmes • Annual Steel Fabrication Capacity: 35,000 tons

  9. A T A G L A N C E • 208,500 sqm total fenced area with 240 m water front • 42,850 sqm covered area (fabrication/paint, offices) • 17,500 sqm covered area (steel fabrication shop ) Cranes: • Main Gantry Crane with lifting capacity of 400 tons • 27 nos Portal, 16 nos Overhead cranes and 1 no Jib Crane with various capacities (2 – 100 tons) Outfitting Berth: • 1 unit (85 x 56 m) Slipways: • 180 x 56 m with 400 t Gantry and 60,000 DWT capacity • 106 x 20 m with 100 t Gantry and 10,000 DWT capacity

  10. F A C I L I T Y / L O G I S T I C S WATER FRONT: 240m LOAD OUT BERTH: 85 m (L) x 56 m (W) (DRAFT: 6m) ROLL-ON ROLL-OFF BARGE LOADING QUAY: 109 m (W) (DRAFT: 7.3m) SLIPWAY1: 180m (L) x 56 m(W) (%5 SLOPE, 60,000 DWT) SLIPWAY2: 106m (L) x 20 m (W) (%1 SLOPE, 10,000 DWT) 2 x 200t GANTRY CRANE 2 x 50t GANTRY CRANE

  11. L A Y O U T A r e a 1

  12. L A Y O U T A r e a 2

  13. C I M T A S L E A N P R O D U C T I O N A P P R O A C H Design and See Solve Share What Plan Each Lead Problems Problems You Learned Process L E A N T O O L S A T C I M T A S VALUE STREAM MAP QUALITY AT SOURCE

  14. B U S I N E S S L I N E S STRUCTURAL STEEL SHIPBUILDING • Powerships • Tankers • Barges • Gas carriers MODULES OFFSHORE STRUCTURES • Steel Bridge Modules • Pre-Assembled Units • Platforms • Tri/Monopiles • Pre-Assembled Racks • Process Skids • Jackets

  15. B U S I N E S S L I N E S S t r u c t u r a l S t e e l Gemlik Fabrication Shops Muscat International Airport Kuntsevo Multifunctional Business & Muscat, Oman Trade Center Moscow, Russia

  16. B U S I N E S S L I N E S S h i p b u i l d i n g P O W E R S H I P S B A R G E S TA N K E R S / G A S C A R R I E R S Marmara Sea

  17. B U S I N E S S L I N E S M o d u l e s P R O D U C T S • Modules • Pre-Assembled Process Units (PAUs) • Pre-Assembled Racks (PARs) • Process Skids S C O P E • Detail Design and Engineering • Assembly of; • Mechanical systems Procurement and/or Prefabrication of; E & I Systems Structural Steel, Cladding, Gratings, etc.. Tubing Piping Systems Insulation and Heat Tracing Manual and Automated Valves • Complete unit Testing ; Flushing, Hydrostatic Testing Electrical and Instrumentation Functional Testing Engineered Equipment Electrical Testing Insulation and Heat Tracing • Trial Assembly (when necessary) • Pressure Vessels Packaging and Delivery

  18. B U S I N E S S L I N E S M o d u l e s 6 Modules, 613 tons, Petrobrazi Plant CCR Tower, Romania UOP Rominserv Storage Tanks Farm Revamping, PSA and Burner Control Skid, Atyrau Refinery Reconstruction, Romania, EMERSON-DANIEL Kazakhstan, AXSIA HOWMAR

  19. B U S I N E S S L I N E S M o d u l e s B R I D G E M O D U L E S Brief 1. Project Name : Golden Horn Project 2. Customer : IHI 3. Schedule : 16 months 4. Place of Fabrication : Cimtas Gemlik works 5. Scope of Work : Engineering, Procurement, Welded Fabrication, Assembly and Installation 6. Project Information (Quantity & Weight) • 184 blocks, 7,340 t, 74,000 steel elements PA R s / PA U s Brief 1. Project Name : CCR Unit (six modules), 700 bbp 2. Customer : UOP 3. Schedule : 10 months 4. Place of Fabrication : Cimtas Gemlik works 5. Scope of Work : Engineering, Procurement, Welded Fabrication, Assembly and Installation 6. Project Information (Dimensions & Weight) • Overall : 63 m (L) x 12.5 m (W) x 6.5 m (H), 624 t • Individual : 25.5 m (L) x 6.5 m (W) x 6.5 m (H), 34 - 168 t/unit

  20. B U S I N E S S L I N E S O f f s h o r e S t r u c t u r e s F L O AT I N G O F F S H O R E M O N O P I L E S P L AT F O R M S J A C K E T S J A C K - U P P L AT F O R M S

  21. D I F F E R E N T I A T O R S R E L I A B I L I T Y S A F E T Y • • Zero Accident Programme Preferred Partner • • Corporate HSE Programme Proprietary Privilege • • OHSAS regulation Business Ethics: Code of Conduct • • Risk Analysis Consistency • • Lessons Learned On Time Delivery • • 5S + 2S Programmes Least Total Installed Cost W O R L D C L A S S Q U A L I T Y E F F I C I E N C Y • • High-tech Machinery One State-of – the – art facility • • Multi-Metallurgy Production Way Flow • • Excellence in Services Lean Programme • • Proven Quality Assurance Systems Kaizen Workshops • • Wide International Experience Multiple Award Winner with Proven Flexibility • • Skilled and Dynamic Personnel Advanced Information Technology

  22. C E N T E R O F E X C E L L E N C E A T C I M T A S G R O U P Quality / Welding • Bend Test • Charpy Impact Test • Hardness Test • Macro and Micro Analysis • Spectrometric Chemical Analysis • Tensile Test (inc. elevated temperatures) • Intergranular Corrosion Test • WPQR Preparation • Heat Treatment Post Weld Heat Treatment, Stress Relief, Normalization • Welder Training (FCAW/GMAW – MIG/MAG, SMAW – MMA, GTAW – TIG (WIG), SAW – UP, Arc Stud Welding, Welder pre-training with Welding Simulator

  23. C I M T A S M O D U L E & S H I P Y A R D Q u a l i t y / W e l d i n g • Manuals: ISO (1) / OHSAS & HSE (1) • Procedures: ISO (16), OHSAS (7), HSE (2) • Instructions: ISO (393), OHSAS (43), HSE (4), QC (155) • Personnel: - In-house UT Level II (2) , VT Level II (4), MT Level II (3), PT Level II (2) in accordance with EN 473 personnel - Welding Engineers (2), Welding Technicians (7), Welding Specialist (2), Welding Inspector (2) - QA Engineers (2), QA Technicians (2), QC Engineers (2), QC Technicians (8) - Certified Welders (98) • Quality Portal – DCC: - On-line Electronic Documentation Flow - Full Traceability

  24. C E N T E R O F E X C E L L E N C E A T C I M T A S G R O U P E n g i n e e r i n g S C O P E • • Plant Design Engineering Civil & Structural Design - Power, Refineries, Petrochemical, • Gas Processing Equipment • Process Design • BOP Equipment • Power and Process Piping • Technical Procurement • OEM Piping - Valves, Instruments,Pipe Supports, • Pressure Vessels - Process Equipment Packages • Heat Exchanger • • Storage Tanks Reverse Engineering-Laser Scanning • Marine Engineering - Basic Design - Detailed Design Cimtas Plant Design and Engineering Group provides various engineering and design services including conceptual, basic and detail engineering for the industries including but not limited to power, oil and gas, chemical, offshore and refinery.

Recommend


More recommend