ridge f ie l d subdivision de ve lope r re que sting pe r
play

RIDGE F IE L D SUBDIVISION De ve lope r Re que sting Pe r - PowerPoint PPT Presentation

RIDGE F IE L D SUBDIVISION De ve lope r Re que sting Pe r mission for a Building Pe r mit Se c tion 10, Rutla nd T ownship 33 L ots on 73 Ac r e s PUD Zoning L OCAT ION MAP AIR PHOT O F INAL PL AT F INDINGS T he Ka ne


  1. RIDGE F IE L D SUBDIVISION De ve lope r Re que sting Pe r mission for a Building Pe r mit Se c tion 10, Rutla nd T ownship 33 L ots on 73 Ac r e s PUD Zoning

  2. L OCAT ION MAP

  3. AIR PHOT O

  4. F INAL PL AT

  5. F INDINGS T he Ka ne County Subdivision Or dina nc e Se c tion 19- 35 sta te s in pa r t the following : “Impr ove me nt Pla ns: Insta lla tion a nd Ac c e pta nc e of Re quir e d Impr ove me nts. (g ) Gua r a nte e for c omple tion of impr ove me nts: (2) c . tha t sta te s “Othe r g ood and suffic ie nt se c ur ity as a ppr ove d by the appr opr ia te le ga l a uthor ity of the County to g uar a nte e the pr ope r insta lla tion of la nd impr ove me nts” (unde r line a dde d). If impr oveme nts a r e c omple te d it is be ne fic ia l to the County a nd the • thr e e e xisting r e side nts in the subdivision to g e t the fina l lift of a spha lt sur fa c e insta lle d a nd the subdivision r e c or d dr a wing s c omple te d. T he de ve loper ha s c ontinue d to pe r for m unde r the r equir e ments of the • Subdivision Or dina nc e a nd ma inta in the subdivision impr ove me nts T he r e ha ve be en no c ompla ints fr om the r e side nts or the public on the • ma inte na nc e or c omple tion of the subdivision.

  6. RE COMME NDAT ION RE COMME NDAT ION: T he Pla t Offic e r r e c omme nds the De ve lopme nt Committe e appr ove the deve lope r ’s r eque st to a llow one building pe r mit to be issue d in a c c or da nc e with a ll a pplic a ble building c ode s and othe r r e g ula tor y r e quir e me nts unde r the following c onditions: 1. T he subdivision r ema ins in viola tion of the Subdivision Or dina nc e a s sta te d in the Pla t Offic e r ’s le tte r of Aug ust 25, 2010. 2. In addition, pr ior to a ny a dditiona l building pe r mits be ing issued the de ve lope r sha ll insta ll the fina l a spha lt sur fa c e for a ll public a nd pr iva te r oa ds within the Ridg efie ld Subdivision a nd the de ve lope r sha ll c omple te the r e c or d dr a wing s in c onfor ma nc e with the Ka ne County Subdivision Or dina nc e . 3. T he de ve lope r sha ll a lso post a pe r for ma nc e g ua r ante e for a one yea r ma inte na nc e pe r iod following a c c e pta nc e of the r e quir e d impr ove ments. T his pe r for ma nc e g ua r a ntee sha ll be in the amount of te n pe r c e nt of the subdivision impr oveme nt c osts r e ma ining a s of the da te of the De ve lopme nt Committe e ’s a ppr ova l of this r e que st.

Recommend


More recommend