reinvesting in atlanta s kids
play

Reinvesting in Atlantas Kids APS 2017 SPLOST Program Recommendation - PowerPoint PPT Presentation

Reinvesting in Atlantas Kids APS 2017 SPLOST Program Recommendation February 1, 2016 Agenda Review of the 5 critical reinvestment goals necessary for Atlantas Kids 2017 SPLOST Recommendations Reinvestment in Atlantas Kids is


  1. Reinvesting in Atlanta’s Kids APS 2017 SPLOST Program Recommendation February 1, 2016

  2. Agenda Review of the 5 critical reinvestment goals necessary for Atlanta’s Kids 2017 SPLOST Recommendations

  3. Reinvestment in Atlanta’s Kids is necessary to achieve 5 critical goals on behalf of all students • Ensure students have access to learning environments that meet 1. their academic needs by ensuring infrastructure is aligned to new cluster signature program designs • Ensure students are not in overcrowded schools by addressing 2. capacity challenges in high-growth areas • Ensure students are in facilities that are safe, comfortable and 3. conducive to learning by maintaining community’s ~$1.78 Billion “Build Smart” investment with building infrastructure and system upgrades (buildings and system upgrades completed under the 1997 SPLOST are approaching the 20 year mark) • Ensure students have access to a comprehensive well-rounded 4. education by investing in athletic fields and technology upgrades • Ensure students being served in APS-leased facilities (including 5. APS charter school students) have access to equitable learning environments by investing in infrastructure improvements for select APS leased facilities 3

  4. Agenda Review of the 5 critical reinvestment goals necessary for Atlanta’s Kids 2017 SPLOST Recommendations

  5. If voters approve a 2017 SPLOST reinvestment, approximately $546M could be approved for APS Fulton County Proposed Authorization: $1.501B District % of FTEs $(M) APS 35.0% $525.69M Fulton Co. 65.00% $976.29M Total 100% ~$1.501B APS: DeKalb County Proposed Authorization: $546.3M $645M District % of FTEs $(M) APS 3.19% $20.57M DeKalb Co. 92.37% $595.78M Decatur 4.42% $28.50M Total 100% ~$645M Official GDOE district FTE counts, immediately preceding the referendum, will be used to determine FTE percentages. Percentages, survive the entire SPLOST cycle 5

  6. APS would likely only receive approximately 85% (~$464M) of authorized amount Actual/ Receipts as a Referendum Projected Percentage of SPLOST Authorization Receipts Authorization 1997 $450.0 $448.5 99.6% 2002 $541.0 $463.9 85.7% 2007 $572.8 $424.9 74.2% 2012 $519.4 $415.4* 80.0% 2012 $519.4 $442.5* 85.2% 2017 $546.3 $464.3* $85.0% *Original Projected Receipts ( 2011) SPLOST 2017 * Projected Receipts (As of: October 2015) Planning *Projected Receipts (As of: January 2016) Amount 6

  7. Initial assessment revealed ~$767M in needs Recommended Recommended Appropriations by Referendum SPLOST 2017 Allocation Allocation Categories Needs 85% 100% Construction and Renovation of Schools $208.0M $208.0M $208.0M Upgrading Building Infrastructure and Given projected Systems* $306.5M** $128.1M $162.9M revenue of $464M , Critical HVAC Phase 2 $40.0M Property Acquisition $10.0M $0.0M $5.0M the district had to Upgrading Security and Safety Systems $9.9M $6.0M $9.1M prioritize among Surplus/Vacant Building Demolition*** $10.0M $2.0M $5.0M several important Upgrading Athletic Fields $20.0M $9.1M $20.0 needs PE Equipment Upgrades/Replacement**** $3.0M $0.0M $1.5M Upgrading Technology Infrastructure and Educational Support Equipment $89.7M $47.0M $67.0M Vehicle Replacement $22.0M $16.3M $20.0M Program Management $12.0M $12.0M $12.0M COPS Debt Liquidation $35.8M $35.8M $35.8M Initial Assessment ($766.9M) Need $766.9M $464.3M $546.3M + Deferred Maintenance Deferred Maintenance ($394.4M) Infrastructure/ Infrastructure/ $394.4M***** Systems****** Systems****** = Total Need $1.16B $464.3M $546.3M Total Need ($1.16B) * Includes APS Charter school facilities owned by APS ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022 needs (revised since 1.11.16 presentation) *** Vacancies will be identified **** General Funds will be used as required to address critical PE equipment needs ***** Parsons 2015 Facilities Condition Assessment: 2015 -2017 ******Building Infrastructure and Systems allocations will be used to manage Deferred Maintenance needs 7

  8. Construction & Renovation of Schools Priorities: Recommended Complete major renovation • Appropriations by Referendum SPLOST Allocation Categories 2017 Needs 85% projects for schools with low Construction and Renovation of Schools $208.0M $208.0M Facility Condition Index scores Upgrading Building Infrastructure and Systems* $306.5M** (including several schools not $128.1M Critical HVAC Phase 2 $40.0M addressed in prior SPLOST Deferred Maintenance $394.4M*** programs) Property Acquisition $10.0M $0.0M Recommendation: • Upgrading Security and Safety Systems $9.9M $6.0M Venetian/Connally $23.5M • Surplus/Vacant Building Demolition $10.0M $2.0M Grove Park $6.5M* • Gideons $10M** • Upgrading Athletic Fields $20.0M $9.1M Forrest Hill $8M • PE Equipment Upgrades and Replacement $3.0M $0.0M Morningside $20M • Humphries $10M • Upgrading Technology Infrastructure and Educational Support Equipment $89.7M $47.0M Hutchinson $8M • Stanton DH $10M Vehicle Replacement $22.0M $16.3M • Toomer $4M Program Management $12.0M $12.0M • West Manor $10M • COPS Debt Liquidation $35.8M $35.8M Kennedy $10M • Total Need $1.16B $464.3M * Plus $12M (SPLOST 2012); Total Project Budget =$18.5M ** Plus $6.5M (SPLOST 2012); Total Project Budget = $16.5M *Includes APS Charter school facilities owned by APS ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022 needs *** Parsons 2015 Facilities Condition Assessment: 2015 -2017 8

  9. Construction & Renovation of Schools (cont.) Priorities: Recommended Address capacity challenges SPLOST 2017 Allocation • Appropriations by Referendum Categories Needs 85% within Grady cluster including Construction and Renovation of Schools $208.0M $208.0M Grady HS expansion, Howard Upgrading Building Infrastructure and Systems* $306.5M** MS construction and Walden $128.1M Critical HVAC Phase 2 $40.0M Athletic Complex Deferred Maintenance $394.4M*** Recommendation: • Property Acquisition $10.0M $0.0M Howard $47M* • Upgrading Security and Safety Systems $9.9M $6.0M Grady $33M • Surplus/Vacant Building Demolition $10.0M $2.0M Upgrading Athletic Fields $20.0M $9.1M *Plus $5M (SPLOST 2012); Total Project Budget =$52M Walden Athletic Complex will be funded with SPLOST PE Equipment Upgrades and Replacement $3.0M $0.0M 2012 funding Upgrading Technology Infrastructure and Educational Support Equipment $89.7M $47.0M Vehicle Replacement $22.0M $16.3M Program Management $12.0M $12.0M COPS Debt Liquidation $35.8M $35.8M Total Need $1.16B $464.3M *Includes APS Charter school facilities owned by APS ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022 needs *** Parsons 2015 Facilities Condition Assessment: 2015 -2017 9

  10. Upgrading Building Infrastructure & Systems & Critical HVAC Phase 2 Recommendation: Recommended The district has an estimated total Appropriations by Referendum SPLOST Allocation • Categories 2017 Needs 85% of $697.6M in deferred and Construction and Renovation of Schools $208.0M $208.0M projected maintenance needs thru Upgrading Building Infrastructure and Systems* $306.5M** } 2022 $128.1M Critical HVAC Phase 2 $40.0M Projected resources, thru 2022, • Deferred Maintenance $394.4M*** totaling ~$128.1M Property Acquisition $10.0M $0.0M Deficiencies will be triaged and • Upgrading Security and Safety Systems $9.9M $6.0M addressed using the following Surplus/Vacant Building Demolition $10.0M $2.0M criteria and the availability of Upgrading Athletic Fields $20.0M $9.1M resources: PE Equipment Upgrades and Replacement $3.0M $0.0M Fire Protection (Life Safety) • Upgrading Technology Infrastructure and Conveying (ADA) • Educational Support Equipment $89.7M $47.0M Critical HVAC • Vehicle Replacement $22.0M $16.3M Program Management $12.0M $12.0M Roofs & Enclosures • COPS Debt Liquidation $35.8M $35.8M Electrical • Total Need $1.16B $464.3M Plumbing • HVAC • Site work • *Includes APS Charter school facilities owned by APS Interior Finishes • ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022 needs Equipment & Furnishings *** Parsons 2015 Facilities Condition Assessment: 2015 -2017 • (List is in priority order) 10 •

Recommend


More recommend