registration for regulatory energy management non
play

Registration for Regulatory Energy Management Non- Generator - PowerPoint PPT Presentation

Registration for Regulatory Energy Management Non- Generator Resource Fall 2012 Market Simulation Web Conference July 23, 2012 9:00 a.m. 12:00 p.m. (Pacific Time) Web Conference


  1. Registration for Regulatory Energy Management Non- Generator Resource Fall 2012 Market Simulation Web Conference July 23, 2012 9:00 a.m. – 12:00 p.m. (Pacific Time) Web Conference Information Conference Call Information URL: https://www.connectmeeting.att.com Domestic Call In: (800) 230-1951 Meeting Number: 8665282256 Access Code: Access code not required Access Code: 9365289

  2. Agenda July 23, 2012 9:00 a.m. – 12:00 p.m. (Pacific Time) Time Topic Facilitator 9:00 – 10:05 Agenda & ISO Roll call Julia Payton 10:05 – 11:00 NGR registration plan James Li Zhou Sirajul Chowdhury Chris Mcintosh Meghna Khatri James Lynn Wendell Tamblyn, Saurabh Monga Sirajul Chowdhury June Xie George Angelidis Andrew Ulmer Jeremy Malekos 11:00 – 12:00 Q&A Page 2

  3. Registration deadline Friday July 27, 2012 5 pm (Pacific Time)

  4. Fall NGR Non-REM Market Simulation Plan – 2012 • Tentative Market Simulation dates – Week 1: 9/4/12 – 9/7/12 • 1 week Non-Rem structured scenarios • 3 trade dates: 9/5, 9/6, 9/7 – Week 2: 9/10/12 – 9/14/12 • Allow market participants to analyze data • No scheduled scenarios – Week 3: 9/17/12 – 9/21/12 • 1 week Non-Rem unstructured scenarios • 3 trade dates: 9/19, 9/20, 9/21 Page 4

  5. NGR Registration Requirements • Type – Storage Resource or – Demand Response • Brief description of technology being modeled. – Other resources that operate as either generation or load and can be dispatched seamlessly within their entire capacity range • Model (See diagram: Show matrix) – Regulation Energy Management. (DR is only able to participate under the REM Model.) – Non-REM (Storage resource that can participate in Spin/Non-Spin, Energy, Regulation Up/Down) • Resource characteristics required on July 27, 2012 – Location: • address • substation name, voltage level – size (Pmin, Pmax) – Energy Limits: MWH (Upper and Lower limits if existing) – Technology (brief description of the technology) Note: A Complete Generator V6.5 Resources Data Template will be due prior to the September 4, 2012 Market Simulation. The ISO will work through your Scheduling Coordinator to complete this document. Page 5

  6. NGR Model Matrix Option to REM Spin/Non- Qualified Project Technology Model Regulation Energy (Special Spin MW Treatment) 15 minute REM SC Bid No No continuous Operation range delivery between negative Limited Energy (Charge) and Storage Resource positive (LESR) (Discharge), Depending on (Flywheel, battery, constrained by energy storage) registration Non REM SC Bid SC Bid SC Bid State of Charge and Non-Generator (SOC) certification Resource (NGR) New functions in EMS, and market 15 minute from Bid to Bill REM SC Bid No No continuous delivery Dispatch-able Demand Response (DDR) Operation range is non-positive, Implementation of Depending on the Participating registration Non REM SC Bid SC Bid SC Bid Load (PLR) model and certification Page 6

  7. NGR – Regulation Energy Management Option NGR REM only resource option description • This is typically a 15min. resource. i.e. 0.25MWh • Demand response can utilize this model to participate in wholesale regulation • Brief description of how AGC signal is derived. • Brief description of 50% rule. http://www.caiso.com/Documents/Plans%20and%20schedule/2012ReleasePlan.pdf

  8. NGR – Non Regulation Energy Management Option NGR Non-Rem resource option description • This option allows a storage resource to participate in Energy, Spin/Non Spin and regulation Up/Down. • This option will be for the resources that have a long period of maintaining generation or load sides. • This option assumes a resource is continuous for more than 1 hour. In August the ISO will host a workshop with market participants to review the Market Simulation structured scenarios and discuss

  9. Next Steps • In August the ISO will host a workshop with market participants to review the Market Simulation structured scenarios and discuss technical details surrounding this project.

  10. Q&A Q&A