  1. Red Moon Resources Overview July, 2019

  2. Forward Looking Statements This presentation may include “forward looking statements” . All statements, other than statements of historical fact, included herein, including without limitation, statements regarding exploration results, future plans, and objectives of Red Moon Resources Inc. are forward looking statements that involve risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.

  3. Project Overview Red Moon Resources: Projects • Captain Cook (Salt) – pre-feasibility stage • Ace Gypsum – production and ramp up • Black Bay (Nepheline) – metallurgical evaluation

  4. Presentation Overview • Captain Cook Salt • Project Description • Market Considerations

  5. Project Location

  6. Captain Cook Salt Project Location

  7. A Producing Basin A Salt Mining Region • Seleine 1982 - present 2.0 Mt/y • Pugwash 1959 - present 1.8 Mt/y • Nappan 1947 - present 100,000 t/y

  8. Captain Cook #4 Captain Cook #4 Detailed Salt Section • Red intervals exceed 95% salt

  9. Captain Cook Salt NI 43-101 Resource Estimate NaCl lower cut- Volume Tonnes Density NaCl Tonnes in-situ (kg/m 3 ) (m 3 ) off (%) (million) (%) (million) 88 682,000,000 1,473 2.16 95.3 1,405 89 677,000,000 1,462 2.16 95.4 1,395 90 672,000,000 1,451 2.16 95.4 1,385 91 653,000,000 1,410 2.16 95.6 1,348 92 602,000,000 1,301 2.16 95.9 1,248 93 557,000,000 1,203 2.16 96.2 1,157 94 499,000,000 1,078 2.16 96.5 1,040 95 420,000,000 908 2.16 96.9 880 96 304,000,000 657 2.16 97.4 640 97 190,000,000 410 2.16 97.9 401 98 71,000,000 154 2.16 98.6 152 99 17,000,000 37 2.16 99.3 37 100 - - - - - • Successful, independently verified NI 43-101 resource estimate • Very large tonnage - 900 million tonnes of high-grade salt

  10. Captain Cook Salt Location & Logistics • Significant existing infrastructure • Nearby deep water ports (Turf Point and Port Harmon) • Airport within 20 minutes of property (Stephenville) • Trans Canada highway and multitude of secondary roads across property • High voltage power line crosses the property • Mining-friendly jurisdiction, Newfoundland & Labrador • Skilled workforce with mining experience in nearby communities

  11. Captain Cook Salt Existing Infrastructure Turf Point Port Looking south-southeast N Captain Cook drillholes Haulage road from project area to Turf Point port 5 km from deposit

  12. Captain Cook Salt Turf Point Port

  13. Selected US Salt Imports 2010 2011 2012 2013 2014 Quantity 1 Value 2 Quantity 1 Value 2 Quantity 1 Value 2 Quantity 1 Value 2 Quantity 1 Value 2 Canada 4,240 $ 119,000 5,340 $ 153,000 3,980 $ 126,000 4,960 $ 157,000 $ 5,800 $ 191,000 Chile 5,000 $ 96,100 5,030 $ 102,000 3,620 $ 68,600 3,900 $ 69,300 $ 7,890 $ 167,000 Mexico 1,000 $ 28,200 1,480 $ 44,700 1,270 $ 37,600 1,530 $ 39,000 $ 2,390 $ 71,000 Bahamas, The 935 $ 16,500 512 $ 8,940 366 $ 9,160 630 $ 24,900 $ 1,010 $ 33,500 Netherlands 362 $ 11,100 127 $ 5,800 134 $ 5,090 248 $ 7,380 $ 257 $ 7,770 France 8 $ 6,800 17 $ 5,620 8 $ 6,610 10 $ 6,300 $ 13 $ 6,090 Israel 10 $ 4,620 13 $ 4,120 11 $ 6,620 14 $ 6,280 $ 66 $ 10,100 Peru 406 $ 4,420 560 $ 8,250 154 $ 2,360 244 $ 3,720 $ 722 $ 11,300 Total 11,961 $ 286,740 13,079 $ 332,430 9,543 $ 262,040 11,536 $ 313,880 $ 18,148 $ 497,760 1 Data are x1000 metric tonnes 2 Customs values only in millions of $USD Source: USGS Mineral Commodity Summaries, January 2015; US Census Bureau • Chile is the largest salt exporter to the US, followed by Canada and Mexico • Road de-icing consumed about 44% of total salt

  14. Captain Cook Salt Market Analysis • Immediate Market - Newfoundland 300,000 t/y • Local Market - Atlantic Canada – Piccadilly Potash mine closure 800,000 t/y • Regional Market - Northeast US – Chilean Imports 5 million t/y

  15. Captain Cook Salt Feasibility Study • Feasibility Study - CDN $3.0 million • Geotechnical drilling • Resource update • Mining plan- mining method (shaft/decline) • Environmental permitting • Social communications • Reclamation plan

  16. Captain Cook Development Strategy • Feasibility funding $3.0 million Q3 2019 • Feasibility completed by Q3 2020 • Mine permitting and construction 2020-2022 • Production commences mid Q4 2022 • Seize opportunities in the North Atlantic market • Ramp up production to capacity of 2.0 million tonnes per year

  17. Ace Gypsum Project Location

  18. Ace Gypsum Project 2017 Drilling 2017 Drilling • Drilling resolved distribution of gypsum to a higher degree of confidence • Drilling identified areas for stripped stockpile (overburden, anhydrite) • Will utilize pre-existing access roads for ease of permitting

  19. Ace Gypsum Project 2017 Drilling

  20. Ace Gypsum Project Path to Production • Successful application for a Mining Lease at the Ace Zone of the historical Flat Bay gypsum quarry (2017) • Engagement of geotechnical consultants to prepare Environmental Registration and Development Plan towards a goal of 2018 gypsum production • Continued product marketing and establishment of potential customers • Drilling program completed on Mining Lease 239 • Development & Reclamation plan submitted and approved (Aug 2018) • Production commenced (Aug 2018)

  21. Marketing Company Vinland Materials Inc. A private integrated alliance of industrial mineral resource owners, mining operators, port operators and market ers (Vulcan is a founding shareholder)

  22. Contract Mining Contract mining arrangement with Vinland

  23. Production Achieved Loading Gypsum at Turf Point Port

  24. 2019 -20 Outlook • Ramp up production to 250,000 tonnes per year • Expand market for production • Work with contract mining partners to maximize efficiencies in production and transportation costs • Evaluate the full gypsum/anhydrite resource potential for expanded market opportunities

  25. Black Bay Nepheline Project Location

  26. Black Bay Nepheline Project Location Project is road (paved) accessible and close to tidewater

  27. Black Bay Nepheline Why Nepheline • High-value industrial mineral used in wide range of applications: • Glass & ceramics production: alkalis act as a flux, lowering melting point in furnace = less energy, $$$ savings • Fillers, extenders & pigments (brighter, more durable than titanium dioxide) in paint, plastics, sealant, fertilizers (alkalis) • Potential open-pit mine - clean chemical-free processing

  28. Black Bay Property Project Status • Favourable results were obtained from mapping and sampling program: high-grade Al 2 O 3 in nepheline syenite is widely distributed • Preliminary metallurgical study completed to determine if the nepheline is amenable to physical concentration processing • Preliminary magnetic separation yielded concentrates as low as 0.12% Fe 2 O 3 (3 kg composite sample) • Detailed channel sampling program carried out in 2017 obtained a 3.5 tonne bulk sample, producing positive metallurgical test results

  29. 2019-2020 Outlook Captain Cook • Solicit Feasibility funding • Initiate & execute Feasibility Study Ace Gypsum • Ramp up production to seize market opportunities • Solicit buyers for gypsum production in 2019-2020 • Delineate gypsum resources for expanded market opportunities Black Bay Nepheline • Metallurgical test work ongoing • Marketing/partner solicitation