re plumbing the 100 year old pennsylvanian bartlesville y
play

Re-Plumbing the 100 Year Old Pennsylvanian Bartlesville y - PowerPoint PPT Presentation

Re-Plumbing the 100 Year Old Pennsylvanian Bartlesville y Sandstone Reservoirs in NE Oklahoma in NE Oklahoma Tulsa Geological Society April 12, 2011 Tulsa, Oklahoma Tulsa, Oklahoma Bob Westermark Grand Directions, LLC Todays Agenda y


  1. Re-Plumbing the 100 Year Old Pennsylvanian Bartlesville y Sandstone Reservoirs in NE Oklahoma in NE Oklahoma Tulsa Geological Society April 12, 2011 Tulsa, Oklahoma Tulsa, Oklahoma Bob Westermark Grand Directions, LLC

  2. Today’s Agenda y g • Questions and Answers Questions and Answers • DOE Wolco Project • Grand Directions’ Avant/Wolco Project G d Di ti ’ A t/W l P j t • What would we do differently?

  3. How ? How do I plan for a successful How do I plan for a successful horizontal well? • Drill for by-passed oil • Understand the depositional environment • Understand the depositional environment • Keep the cost down • Closely monitor the results • Closely monitor the results • Modify the mental model

  4. Is there enough oil left? g

  5. Where to drill? Where is the remaining oil in my Where is the remaining oil in my depleted reservoir? Understand the Depositional Environment • Structure and isopach maps • Fracture orientation • Paleo-topographic map

  6. Why Spend the Money? y p y To make money! To make money! • Geologic model Geologic model • Reservoir model • History matching of past performance • History matching of past performance • 3 dimensional, 3-phase black oil simulator

  7. Once a history match is achieved is achieved, an economic analysis i is performed f d to determine viability.

  8. Was your last horizontal well What is the Cost? expensive? expensive?

  9. Before w orrying about cost . . . Let’s define a few drilling terms. g y

  10. Definitions Section View Plan View Plan View Build Rate Build Rate End of Curve Orientation Length g Kick Off Point

  11. What Determines Build Rate For Horizontal Wells? Schlumberger Power Drive Rotary Steerable Assembly Mud Motor + MWD + LWD = 10 to 30 degrees per 100’

  12. What does Grand Directions use? Rotary steerable assembly y 90 degrees per 100’ y

  13. What does Grand Directions use? Reduce the cost of horizontal wells Reduce the cost of horizontal wells. Rotary steerable assembly Rotary steerable assembly

  14. What does Grand Directions use? Reduce the cost of horizontal wells. Reduce the cost of horizontal wells Air hammer

  15. DOE Wolco Project j • Avant field Avant field • Discovered 1904 • Unitized by Shell Oil 1937 • Unitized by Shell Oil 1937 • Sold by Shell in 1965 “Co ld not be “Could not be waterflooded” aterflooded” • Various operators tried waterflooding . . . economic failures economic failures

  16. OSTI_ID: 3244 A NEW METHODOLOGY FOR OIL AND GAS EXPLORATION USING REMOTE SENSING DATA AND SURFACE FRACTURE ANALYSIS Topical Report p p August 1995 By Genliang Guo Genliang Guo Herbert B. Carroll February 1999 Performed Under Contract No. DE-AC22-94PC91008 (Original Report Number NIPER/BDM-0163) BDM-Oklahoma, Inc. Bartlesville, Oklahoma

  17. DOE Wolco Project j • Toe-To-Heel • Central horizontal injection well • Two adjacent horizontal producing wells • Disposal well #1-A

  18. DOE Wolco Project j • Toe-To-Heel* The incredibly technical technical, rocket scientist explanation: * Patent Pending

  19. DOE Wolco Project j 10,000,000 210 1 000 000 1,000,000 180 180 100,000 150 10,000 120 1,000 90 100 60 10 30 6 BOPD 6 BOPD 1 0 12/10/03 4/23/05 9/5/06 1/18/08 6/1/09 10/14/10 Cum Water BOPD Production of 5A & 6A

  20. DOE Wolco Project j • Not economic at $30/bbl Not economic at $30/bbl

  21. DOE Wolco Project j Injector $50,000 • Shut-in Producers • Plugged back and ugged bac a d new laterals drilled in opposite direction $50,000 Disposal well #1A

  22. DOE Wolco Project j 10,000,000 210 1 000 000 1,000,000 180 180 100,000 150 10,000 120 1,000 90 100 60 10 30 18 BOPD 18 BOPD 1 0 12/10/03 4/23/05 9/5/06 1/18/08 6/1/09 10/14/10 Cum Water BOPD Production after re-drilling 5A & 6A

  23. DOE/BC/14851-26 (OSTI_ID: 13821) INTEGRATED APPROACH TOWARDS THE APPLICATION OF INTEGRATED APPROACH TOWARDS THE APPLICATION OF HORIZONTAL WELLS TO IMPROVE WATERFLOODING PERFORMANCE Final Report Final Report January 1, 1993 - August 31, 1999 By Mohan Kelkar Mohan Kelkar Chris Liner Dennis Kerr Date Published: Date Published: October 1999 October 1999 Work Performed Under Contract No. DE-FC22-93BC14951 the University of Tulsa the University of Tulsa Tulsa, Oklahoma

  24. 1 2 3 1 2 3

  25. DGI E 1 2 3 1 2 3

  26. Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  27. ession ransgre Tr Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  28. Regression Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  29. ession ransgre Tr Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  30. Regression Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  31. ession ransgre Tr Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  32. Regression Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  33. ession ransgre Tr Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  34. Regression Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  35. ession ransgre Tr Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation Regional Stratigraphy and Oil and Gas Potential of the McLouth Formation in the Southern Forest City Basin of Northeast Kansas Thesis by Carl F. Dietz 1995

  36. DOE Wolco Project j Compartmentalization Compartmentalization

  37. • Fracture Identification & Orientation Logging Horizontal Wells t ti & O i Low cost? ti tifi g Id • Induction Induction • Density gg t F

  38. Logging Horizontal Wells gg g • Grand Directions uses the latest and Grand Directions uses the latest and greatest, high tech, state of the art . . . SRCL! S C

  39. Logging Horizontal Wells gg g • Grand Directions uses the latest and Grand Directions uses the latest and greatest, high tech, state of the art . . . Sucker Rod Sucker Rod C Conveyed Log! d L !

  40. Adaptor Logging Horizontal Wells • Sucker Rod Conveyed Logging Sucker Rod Conveyed Logging g gg

  41. Logging Horizontal Wells • Sucker Rod Conveyed Logging Sucker Rod Conveyed Logging g state of the art Electrical Tape High tech, l T gg t i El

  42. Avant/Wolco Expansion p 325 328

  43. #325 #328

  44. Avant/Wolco Expansion p 10,000,000 210 1,000,000 1,000,000 180 180 100,000 150 10,000 120 1,000 90 100 60 10 30 55 BOPD 55 BOPD 1 0 12/10/03 4/23/05 9/5/06 1/18/08 6/1/09 10/14/10 Cum Water BOPD The effect of 325 and 328 on production

  45. Avant/Wolco Expansion p 325 328 55 8 36

  46. #8 36 8 #36

  47. North Avant Expansion p 10,000,000 210 1,000,000 1,000,000 180 180 100,000 150 10,000 120 1,000 90 100 60 10 30 85 BOPD 85 BOPD 1 0 12/10/03 4/23/05 9/5/06 1/18/08 6/1/09 10/14/10 Cum Water BOPD The effect of 36 on production

  48. Avant/Wolco Expansion p 325 328 55 8 36

  49. #8 Re-Drill

  50. Avant/Wolco Expansion p 441 325 328 55 8 36

  51. #441 New Horizontal Well

  52. #55 Extension

  53. Avant/Wolco Tracer Survey 441 325 328 55 8 36

  54. Avant/Wolco Expansion p 10,000,000 210 1,000,000 1,000,000 180 180 100,000 150 10,000 120 1,000 90 100 60 10 30 140 BOPD 140 BOPD 1 0 12/10/03 4/23/05 9/5/06 1/18/08 6/1/09 10/14/10 Cum Water BOPD Increase after 55 and 441

Recommend


More recommend