RÚBRICA MARITIME www.rubricamaritime.com www.youtube.com/user/RubricaIngenieria www.linkedin.com/company/rúbrica Intelligent Engineering Solutions - 1 -
OUTLINE 1. Overview 2. Our Aims: Self-Launching System & Precast Blocks 3. Why Self-Launching Falsework? Key elements 4. Special Case: Lázaro Cárdenas work 5. Precast Blocks 6. Other Solutions RÚBRICA MARITIME www.rubricamaritime.com - 2 -
OVERVIEW X DREDGING PRECAST BLOCKS DOCK IN SLOPE EXTERIOR WORK VERTICAL SEAWALL VERTICAL WAVEWALL PORT WORKS CAPPING BEAM UNDERWATER WALL GRAVITY DOCK FLOATING FORMWORK QUAY ON PILES INTERIOR WORK SELF-LAUNCHING FALSEWORK DOLPHINS SHEET PILE DOCK RÚBRICA MARITIME www.rubricamaritime.com - 3 -
Our aims 1. SELF-LAUNCHING SYSTEM RÚBRICA MARITIME www.rubricamaritime.com - 4 -
Our aims 2. PRECAST BLOCKS RÚBRICA MARITIME www.rubricamaritime.com - 5 -
Our solutions 3. SELF-LAUNCHING FALSEWORK WHY? RÚBRICA MARITIME www.rubricamaritime.com - 6 -
Our solutions 3. SELF-LAUNCHING FALSEWORK KEY ELEMENTS IN THE DESIGN OF THE SYSTEM: 1- Distance between piles 2- Features of the pile 3- Distance from the slab bottom to the sea level. 4- Geometry of the edges of the quay (Cantilever) 5- Geometry of the intermediate section RÚBRICA MARITIME www.rubricamaritime.com - 7 -
Our solutions 3. SELF-LAUNCHING FALSEWORK DESCRIPTION OF THE FORMWORK: RÚBRICA MARITIME www.rubricamaritime.com - 8 -
Our solutions 3. SELF-LAUNCHING FALSEWORK DESCRIPTION OF THE FORMWORK: RÚBRICA MARITIME www.rubricamaritime.com - 9 -
Our solutions 4. SELF-LAUNCHING FALSEWORK SPECIAL CASE Lázaro Cárdenas en México RÚBRICA MARITIME www.rubricamaritime.com - 10 -
Our solutions 5. PRECAST BLOCKS ACRÓPODO II Constanza Port - Romania RÚBRICA MARITIME www.rubricamaritime.com - 11 -
Our solutions 5. PRECAST BLOCKS ACRÓPODO II Constanza Port - Romania RÚBRICA MARITIME www.rubricamaritime.com - 12 -
Our solutions 5. PRECAST BLOCKS ACCROPODE II- DESCRIPTION OF THE FORMWORK: RÚBRICA MARITIME www.rubricamaritime.com - 13 -
Our solutions 5. PRECAST BLOCKS CUBIC BLOCK & SINGLE-ARM GRIPPER RÚBRICA MARITIME www.rubricamaritime.com - 14 -
Other solutions CAPPING BEAM KEY ELEMENTS: OTHER ELEMENTS: 1- Geometry of the hanging area 1- Length of the casting section 2- General dimensions 3- Movement surface 4- Elements in the surrounding RÚBRICA MARITIME www.rubricamaritime.com - 15 -
Other solutions CAPPING BEAM DESCRIPTION OF THE FORMWORK: RÚBRICA MARITIME www.rubricamaritime.com - 16 -
Other solutions CAPPING BEAM SPECIAL CASE: CAPPING BEAM IN TOGO RÚBRICA MARITIME www.rubricamaritime.com - 17 -
Other solutions VERTICAL WAVEWALL KEY ELEMENTS: 1- Section: LENGTH AND HEIGHT 2- Tilted face 3- Botaolas 4- Movement surface 5- Elements in the surrounding - 18 -
Other solutions VERTICAL WAVEWALL DESCRIPTION OF THE FORMWORK: RÚBRICA MARITIME www.rubricamaritime.com - 19 -
Other solutions UNDERWATER WALL KEY ELEMENTS: 1- Crowning of the section. (Emergent or submerged) 2- Means to move the formwork 3- Possibility of placing through bars 4- Geometry of the section RÚBRICA MARITIME www.rubricamaritime.com - 20 -
Other solutions UNDERWATER WALL DESCRIPTION OF THE FORMWORK: RÚBRICA MARITIME www.rubricamaritime.com - 21 -
Other solutions FLOATING FORMWORK RÚBRICA MARITIME www.rubricamaritime.com - 22 -
Other solutions DOLPHINS RÚBRICA MARITIME www.rubricamaritime.com - 23 -
Thank you everyone! www.rubricaingenieria.com https://www.youtube.com/user/RubricaIngenieria https://www.linkedin.com/company/rúbrica Inma Gómez Division Manager igomez@rubricaingenieria.es Intelligent Engineering Solutions - 24 -
Recommend
More recommend