quad production
play

QUAD production Fred Hartjes NIKHEF Nikhef/Bonn LepCol meeting - PowerPoint PPT Presentation

QUAD production Fred Hartjes NIKHEF Nikhef/Bonn LepCol meeting November 19, 2018 Simplified overview production QUAD started Mech. Wire DAQ/HV Ready Remarks assy bonded test 10 X X X - DEMO, not electrically working 11 X X X


  1. QUAD production Fred Hartjes NIKHEF Nikhef/Bonn LepCol meeting November 19, 2018

  2. Simplified overview production QUAD started Mech. Wire DAQ/HV Ready Remarks assy bonded test 10 X X X - DEMO, not electrically working 11 X X X X X ~30 um alignment error 12 X X X X ~30 um alignment error 13 X X X X 14 X X X X/- May not be used due to flex damage 15 X X X X 16 X X X X 17 X X X X 18 X X 19 X X 20 X X 21 X X 22 X X 23 X X Fred Hartjes 24 X X 2 Nikhef/Bonn LepCol meeting. Nikhef. November 19, 2018

  3. Production issues Sufficient chips to complete the QUAD 10, 12, 13, 15, production 16, 17 (wire bonded and 13 operational QUADs expected DAQ tested) QUAD14 may not be used, Glass fibre components being produced now Guard electrodes QUAD 18 - 24 Components testbox All HV wires installed Fred Hartjes 3 Nikhef/Bonn LepCol meeting. Nikhef. November 19, 2018

  4. Production issues All HV wires installed Gas tightness tested for all QUADs Two QUADs still leaking Position accuracy not yet measured Expected to be better for later QUADs Quality of the reference edges is critical Fred Hartjes 4 Nikhef/Bonn LepCol meeting. Nikhef. November 19, 2018

  5. Testbox All components produced apart from the glass fibre ones Gas envelope with glass plates assembled We may later need a second one (without glass) for the testbeam Foil in – foil out Critical issues: Ordering power boards (done or not done?) Programming concentrator Fred Hartjes 5 Nikhef/Bonn LepCol meeting. Nikhef. November 19, 2018