purple line extension
play

Purple Line Extension Community Webinar - PowerPoint PPT Presentation

Purple Line Extension Community Webinar July 24, 2019 1 Agenda Section 1 Update Section 2 Update Section 3 Update Eat Shop Play Business Interruption Fund Questions


  1. Purple Line Extension Community Webinar July 24, 2019 1

  2. Agenda • Section 1 Update • Section 2 Update • Section 3 Update • Eat Shop Play • Business Interruption Fund • Questions & Answers 2

  3. Purple Line Extension Project Alignment 3

  4. Sections 1, 2 & 3 Status *Subject to change. The PLE project team is working to deliver the project consistent with Measure M Forecasted Schedule Section 1 Section 2 Section 3 Section 3.92 Miles 2.59 Miles 2.56 Miles Length Wilshire/La Brea Wilshire/Rodeo Westwood/UCLA New Stations Wilshire/Fairfax Century City/ Westwood/VA Wilshire/La Cienega Constellation Hospital 2014 – 2015 2016 – 2018 2018 – 2019 Pre-Construction Activities 2015 – 2023 2018 – 2025 2019 – 2027 Construction 2023 2025 2027 Operations 4

  5. Purple Line Extension Section 1 Alignment 5

  6. Purple Line Maintenance Facility Maintenance Facility • Located in the Arts District, north of 6 th St Bridge • 590 S Santa Fe Av Current Work • Parking lot paved and striped • Sidewalks and landscaping installed • Furniture being placed and assembled • Artwork installed on west wall approximately mid-June 6

  7. Purple Line Maintenance Facility Installing art work on the façade of the building 7

  8. Wilshire/Western Connection Schedule Schedule *As of July 2019, subject to change 8

  9. TBMs Break Through Soyeon and Elsie break through at Wilshire/Western 9

  10. TBM Transport TBMs being disassembled for transport back to Wilshire/La Brea Station 10

  11. Wilshire/La Brea Station 11

  12. Wilshire/La Brea Station Box Rendering shows length of the Wilshire/La Brea underground station box on Wilshire Bl from Orange Dr to Detroit St 12 12

  13. Wilshire/La Brea Station Schedule *As of July 2019, subject to change 13

  14. Wilshire/La Brea Station Station Construction Constructing the interior walls Assembling TBM ring on the west end

  15. Upcoming Work Bus Pads and Water Crossings Beginning July 2019, STS will restore bus pads at the following locations: Wilshire Bl/Bronson Av • Wilshire Bl/Lorraine Bl • Wilshire Bl/McCadden Pl • Wilshire Bl/ Citrus Av • Wilshire Bl/Cloverdale Av • Wilshire Bl/McCarthy Vista • Wilshire Bl/San Vicente Bl • Example of a Bus Pad along Wilshire Bl

  16. Wilshire Bl/Sycamore Av Antenna Antenna • Steel pole, slightly more than 62 feet above the concrete base • Less than 12 inches in diameter • Radio antenna must be in very close proximity (300 feet maximum) to the underground station’s communications room (at the east end of the Wilshire/La Brea Station) • This eliminates the loss of signal strength. • Location provides connectivity to the various emergency response agencies’ other local and mountain top radio transmitter/receiver sites • Location allows the Purple Line radio system to have the coverage it requires for all users: • Metro Operations and Maintenance • Public safety (police, fire, Sheriff, and Transit Security) in the underground stations and tunnels

  17. Wilshire Bl/Sycamore Av Antenna Rendering of Antenna

  18. Wilshire/Fairfax Station 18

  19. Wilshire/Fairfax Station Box Rendering shows length of the Wilshire/Fairfax underground station box on Wilshire Bl from west of Fairfax Av to just west of Ogden Dr 19 19

  20. Wilshire/Fairfax Station Schedule *As of July 2019, subject to change 20

  21. Wilshire/Fairfax Station Station Construction Installing electrical conduit

  22. Orange Grove Ave. Closure Start date September 2019* *As of July 2019, subject to change STS is proposing a full • closure of Orange Grove Av just south of Wilshire Bl for the duration of the project This closure will support the • excavation of appendage structures and successor activities Outreachto the community and • the relevant city agencies has begun Closure area

  23. Wilshire/Fairfax Station Concrete and Rebar – Ongoing 2019 Concrete and rebar (steel) work • anticipated to continue through 2019 Work will require worksite traffic • control on the south side of Wilshire Bl from Orange Grove Av to Ogden Dr Off-peak work hours • (9am – 3:30pm; 8pm - 6am) More details to be provided in future • construction notices and briefings Concrete work shown from the street level at Wilshire/La Brea. Concrete is being pumped underground from the street level. Similar work will be done at the Wilshire/Fairfax Station. 23

  24. Wilshire/Crescent Heights Tunnel Investigation, Ongoing through September 2019 Additional investigation wells will • be installed throughout Summer 2019 Lane reductions on Wilshire Bl • are anticipated to continue in advance of the tunneling from the Wilshire/Fairfax station Extended work hours may be • required as investigation continues Additional details will be available • in future construction notices Approximate work locations at Wilshire/Crescent Heights. 24

  25. Directional Drilling August 2019 Beginning August 2019, • STS will be investigating the locations of two abandoned oil wells Work will be done at night, • 8pm to 6am Intermittent lane closures • along Wilshire Bl will be in place to support investigative drilling Approximate work location at Wilshire Bl/ La Jolla Av

  26. Wilshire/La Cienega Station 26

  27. Wilshire/La Cienega Station Box Rendering shows length of the La Cienega underground station box on Wilshire Bl from La Cienega Bl to Tower Dr 27 27

  28. Wilshire/La Cienega Station *As of July 2019, subject to change 28

  29. Wilshire/Gale Intermittent Daily Gale Closure – North of Wilshire Bl Gale Dr will be intermittently • closed Monday to Saturday, 6am to 6pm This closure is a public safety • measure due to high volumes of ingress/egress from the property Access to N Gale Dr will be • maintained from San Vicente Bl Hauling operation to occur until • 10pm Gale Dr from north of Wilshire Bl 29

  30. Wilshire/La Cienega Removing stockpiled excavation material 30

  31. Wilshire/La Cienega – Upcoming Work Instrumentation Work & Street Maintenance When: Ongoing through 2019 Instrumentation work on Wilshire Bl and La Cienega Bl • Intermittent lane reductions on Wilshire Bl, La Cienega Bl, and side streets during off-peak hours (non-rush hour) Street Maintenance, Dewatering Well Maintenance, and Utility Work on Wilshire Bl Intermittent lane reductions on Wilshire Bl • and side streets during off-peak hours (non-rush hour) 31 Example of instrumentation drilling

  32. Wilshire/La Cienega – Upcoming Work City of Los Angeles When: Ongoing through 2019 Construction activities on Wilshire Bl between Fairfax Av and San Vicente Bl may require traffic control in the City of Beverly Hills. Work includes, but is not limited to: Geotechnical instrumentation installation • Soil improvement • Magnetic surveying • Information on this work and the required traffic control will be available via construction notices. 32

  33. Station Naming Policy Station Names will reflect the following principles: Transit system context: names will reflect the property’s location, relative to the entire • transit system, and not duplicated elsewhere. Property area: provide specific information about the property’s location relative to • the surrounding area. Neighborhood identity: acknowledge the communities and neighborhoods serviced • by the station and stops. • Simplicity: names will be short, easily recognizable and fit for signage and mapping. Character limit: preferred maximum of 24 characters to ensure ADA readability and fit • within signage system. 33

  34. Name your next Purple Line Stations Metro staff originally developed a set of geographically-based names for the Section 1 Stations and are now seeking community input on those names. Submit your proposals at metro.net/purple 34

  35. Section 2 35 35

  36. Purple Line Extension Section 2 Alignment 36

  37. Wilshire/Rodeo Station

  38. Section 2 Wilshire/Rodeo Station

  39. Wilshire/Rodeo Station Box Station Box Rendering shows length of the underground station box on Wilshire Bl from Cañon Dr to Beverly Dr 39

  40. Driveway Installation Staging Yards Where: Wilshire/Reeves Yard: on Reeves Dr • • N CañonYard: on N CañonDr and Wilshire Bl Start Date: Mid-July 2019 Anticipated Completion: Early August Work Hours: Monday – Friday, 8am – 6pm Traffic Control: Sidewalk closures adjacent to yards • Intermittent closure of curb lane on • westbound Wilshire Bl, northbound N CañonDr, and southbound Reeves Dr from 9am – 4pm For your safety, do not use • 40 streets as a walk way

  41. N. Cañon Staging Yard Installation of Sound Wall *Subject to change • 20-foot sound wall around the staging yard will be installed to mitigate noise to adjacent properties and public ROW • Start Date: Late June 2019 • Completion Date: Mid-July 2019 • Work Hours: Monday – Friday, 8am – 6pm Sound wall and driveway installation progress at N Cañon Yard 41

Recommend


More recommend