PUBLIC IN FO RM A TIO N M EETIN G C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S M a rc h 2 0 , 2 0 1 8 Me e ting Age nda Cascade Corridor Improvements: Phase I March 20, 2018 6:00 6:15 p.m.


  1. PUBLIC IN FO RM A TIO N M EETIN G C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S M a rc h 2 0 , 2 0 1 8

  2. Me e ting Age nda Cascade Corridor Improvements: Phase I March 20, 2018  6:00 – 6:15 p.m. Arrival of Attendees  6:15 – 6:30 p.m. Welcome and Introductions  6:30 – 7:00 p.m. Project Overview Presentation  7:00 – 7:30 p.m. Questions and Answers  7:30 – 8:00 p.m. Open House / Public Input Activities

  3. Re ne w Atlanta and T SPL OST  Renew Atlanta: o $250 million infrastructure bond program approved by voters on March 17, 2015 o Over 80% of voters approved  TSPLOST (special purpose local option sales tax for transportation): o Atlanta voters approved the referendum on November 8, 2016, authorizing investment in transit and transportation infrastructure o Referendum passed by 68%

  4. 1 PROJE CT OVE RVIE W

  5. Casc ade Road Cor r idor Impr ove me nts (Phase 1)  Project Limits: City Limits (near Kingsdale Drive) to Willis Mill Road and Delowe Drive to Avon Avenue o Drainage and Erosion Improvements o Pedestrian Safety Enhancements o Traffic Signal and Communication Upgrades o Shared User Amenities (Sidewalks, Bike Lanes) o Improved Accessibility to MARTA Bus Stops  Resurfacing (City Limits to Ralph David Abernathy)

  6. Dr ainage and E r osion Impr ove me nts ► Install concrete header curb and catch basins to collect and route stormwater away from roadway

  7. Pe de str ian Safe ty E nhanc e me nts ► Signalized pedestrian crossings RESIDENCE (flashing beacons) RESIDENCE and refuge islands RESIDENCE RESIDENCE RESIDENCE

  8. T r affic Signal & Communic ation Upgr ade s ► Improved signal timing, detection, and coordination ► Upgraded equipment (pedestrian crossing push buttons, signals, cabinets, wiring)

  9. Shar e d Use r Ame nitie s ► Consistent lane widths (10’ travel lane) ► Renew Atlanta is looking into potentially adding center lane medians at appropriate locations

  10. Shar e d Use r Ame nitie s ► Dedicated and shared bike lanes ► Sidewalks separated from travel lanes by 2-ft buffer

  11. Impr ove d MART A Bus Ac c e ss ► Improved facilities for accessing MARTA buses including sidewalks and bus shelters (where warranted)

  12. I- 75 ash Data oje c t Cr Pr

  13. Safe ty Re c omme ndations ► Kingsdale Drive SW ► Pedestrian crosswalks and signage improvements I- 75 Side Road RESIDENCE Warning RESIDENCE ST RE E T NAME Ped Crossing Warning

  14. Safe ty Re c omme ndations ► Adams Drive SW ► Pedestrian crosswalks and signage improvements I- 75 I ntersection RESIDENCE Warning RESIDENCE ST RE E T NAME RESIDENCE

  15. 2 PROJE CT DE SIGN The Corridor will have the same look and feel from the Atlanta City limit to Ralph D. Abernathy Blvd.

  16. 3 WHAT ’S NE XT ? ► Next Steps I- 75  Finalize Plans  Complete Permitting Process (Trees, Erosion Control)  Right of Way  Utility Coordination  Solicitation & Contractor Selection  Construction

  17. e e dbac k F

  18. F e e dbac k We bsite : www.RenewAtlantaBond.com : @RenewATL2015, #RenewATL T witte r mail: RenewAtlanta@AtlantaGa.Gov E

  19. oje c t Update s Pr

  20. 4 QUE ST IONS & COMME NT S  Question and Answer session (please limit comments to 2 minutes)  Visit informational boards & discuss with City of Atlanta representatives  Complete a comment card and leave with a Renew Atlanta representative