Sandy Creek Sewer Project Dustin Clark, P.E. July 2018 George Kalkowsky, P.E. Outline Objective Needs Costs Steps to Proceed Questions 2 Objectives 2018 Engineering Planning Grant Evaluate Public Sewer Needs


  1. Sandy Creek Sewer Project Dustin Clark, P.E. July 2018 George Kalkowsky, P.E.

  2. Outline • Objective • Needs • Costs • Steps to Proceed • Questions 2

  3. Objectives • 2018 Engineering Planning Grant • Evaluate Public Sewer Needs • Evaluate WWTP and Service Area Options • Identify Potential Funding • Estimate Project Costs 3

  4. Rising Lake Levels • Rising Lake Levels 4

  5. Septic Systems 5

  6. Water Quality Concerns • 23% Response Rate • 47% concerned with water quality • 79% want preservation and protection of natural resources • 10% have no treatment of sewage waste Source: 2011 CNYRPDB Community Survey 6 www.cnyrpdb.org/sccp/docs/Sandy_Creek_Survey_Results_2011.pdf

  7. Water Quality Concerns Source: NYSDEC Priority Waterbody Inventory List 7

  8. Water Quality Concerns Source: NYSDEC Priority Waterbody Inventory List 8

  9. Study Focus Area 9

  10. Typical Sewer System Connection 10

  11. Typical Grinder Pump Installation Typical Grinder Pump Typical Pump Alarm Panel 11

  12. Treatment Plant Options • Village of Pulaski • Pump station and transmission main to pump sewage to the Village of Pulaski. • Expansion to the Village Treatment Plant • Schoeller Technical Papers • Pump station and transmission main to pump sewage to the facility • Reconstruct existing Treatment Plant • Construct a new Facility • Low pressure collection system advantageous for siting the facility 12

  13. Project Costs • Northern Area Collection System • 1214 people • 485 connections • $12M • Southern Area Collection System One or the other, for example • 1117 people • 469 connections • $14M • Wastewater Treatment Plant • New Facility • $7M 13

  14. Project Funding • CWSRF “Hardship” Loan • 30 year loan, interest free • USDA Rural Development Loan • 38 year loan, 3% interest • Water Infrastructure Grant • Up to 25% of project • Water Quality Improvements Program Grant • Up to $5M • USDA Rural Development Grant 14

  15. Estimated Annual User Costs Property Owner with Connection Debt Service $355 - $655 Collection System O&M $100 Treatment Charge $325 Annual Grinder Pump Electrical Cost $20 Repair Reserve $100 TOTAL $900 - $1,200 15

  16. Steps to Proceed • Interest Surveys - your response is our guide • Engineering Report • Funding Applications • Design • Permitting • Earliest Bid/Construction (2022) 16

  17. Questions 17