Pa Pattonville Tra ransportation Department Program Evaluation 2018-2020
Tr Transportation Program Evaluation Areas of Fo Focus 2018-2020 2020 Goal 1: Safe and efficient transportation provided for all students Goal 2: Provide staff training for all positions to improve professionalism Goal 3: Determine future facility and equipment needs
Goal 1: Safe and effici cient transportation pr provide ded d for r all stude tudents ts A. Safe bus stops and routes are established B. Buses are well maintained C. Efficient transportation system is established
Use of Fleet Vision Bus Maintenance Tracking software to Improve Bus Safety. • Preventative maintenance scheduling • Work order management • Inventory maintenance and tracking Lease Purchase of 20 New School Busses for the 2020-21 School Year . 4.3 Average Age of Bus Fleet 9.48 0 2 4 6 8 10 2020-21 2019-20
GPS Tracking Video Surveillance Radio Communication Student Location
Gatekeeper Camera System Ability to download video • • Installation scheduled for all new buses through wi-fi. purchased for the 2020-2021 school year. • Has inverted blur option for confidentiality • Includes wide angle camera and multi- camera configuration.
Go Goal al 2: Provid ide staff train ainin ing for all all po positio itions ns to impr improve pr professio ionalis nalism A. Pursue rigorous professional development programs for transportation personnel to enhance operations, customer service, and professionalism B. Implement additional safety programs for seasoned drivers while enhancing a comprehensive training program for new drivers C. Implementation of a comprehensive and specific professional development program for mechanics
All Route Drivers Achieved Certification in the Smith System During the Fall of 2019
Goal 3: Conduct a comprehensive study y to de determine mine futur uture tr trans anspo portatio tion n facility y and equipment needs A. Evaluate additional purchases of Compressed Natural Gas (CNG) powered school buses B. Solidify renovations and/or construction plans for new transportation facility C. Pursue reconfiguration of Bridgeway and Heights parking lots. to improve student safety
Im Impr proved ed Studen tudent t Sa Safety • The bus loading and unloading safety redesign has been completed at Bridgeway • At Pattonville Heights, reorganized procedures improve student safety by separating bus pick up/drop-off from car riders
• Safe and efficient transportation will be provided for all students Futur Future e Goal al • Provide staff training for all positions Re Recommendations to improve professionalism • Determine future facility and equipment needs
Recommend
More recommend