  1. City of Providence City of Providence Pavement Management Pavement Management Analysis Analysis Presented by: Vanasse Hangen Brustlin, Inc. April 27 , 2012 Presentation Overview  Pavement Management Background C  Process P ity of Providence - Pavem  Current Conditions  Budget Analysis  Project Selection  Next Steps  Next Steps ment Management 1

  2. Pavement Management Background What is Pavement Management? What is Pavement Management? C ity of Providence - Pavem  The practice of planning for pavement maintenance and rehabilitation with the goal of maximizing the value and life of a pavement network. ment Management Otherwise known as “Getting the Biggest Bang for Your Buck” Pavement Management Background Pavement Deterioration Curve Pavement Deterioration Curve C ity of Providence - Pavement Management Will cost $20.00 to $30.00 Here 2

  3. Pavement Management Process The Process The Process C ity of Providence - Pavem  Develop Pavement Management Database  Pavement distress identification and quantification (Visual Inspection Only) • Performed in 1997, 2006, 2012 (partial)  Refine Pavement Deterioration Curves  Pavement Condition Index (PCI) calculation on a 0 ‐ 100 scale ment Management  Define Treatment Options and Costs  Develop list of candidate projects  Apply engineering and local judgment to define annual road program Current Conditions Average Roadway Pavement Condition Index = 67 Average Roadway Pavement Condition Index = 67 C ity of Providence - Pavem 100 Do Nothing Condition Index 90 Routine Maintenance 80 Preventive Maintenance (PCI) 70 67 ment Management Pavement 60 Structural Improvement 50 Base Rehabilitation 40 Years 3

  4. Current Conditions Distribution of Conditions* Distribution of Conditions* C ity of Providence - Pavem 60 51.3 51.0 45.5 50 42.6 41.0 38.0 37.8 40 Miles 25.8 30 12.3 16.4 16.4 ment Management 12.5 12 5 20 20 14.9 14 9 10.7 10 0 Pavement Condition Index Current Conditions Current Roadway Pavement Backlog Summary Current Roadway Pavement Backlog Summary C Backlog in Miles Backlog in Miles ity of Providence - Pavem ~400 City Maintained Miles Backlog in Dollars Do Nothing 22.81 ~$140 Million Routine Base Maintenance Rehabilitation 89.66 49.59 Preventative Routine Maintenance Maintenance Base $15,421,000 $2,073,000 Rehabilitation $48,209,000 ment Management Preventative Maintenance Structural 88.27 Improvement 150.05 Structural Improvement $73,881,000 4

  5. Budget Analysis Budget Analysis Budget Analysis C  $8 Million per year ‐ Maintains PCI $8 Milli M i t i PCI ity of Providence - Pavem  $10 Million per year ‐ Will increase Average PCI to 74 in 10 years  $13 Million per year ‐ Will increase Average PCI to 75 in 5 years. ment Management Budget Analysis Projected Pavement Condition Projected Pavement Condition 85 C ity of Providence - Pavem 80 avement Condition Index 75 70 65 ment Management Pa 60 $8M/Year $10M/Year $13M/Year 55 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 5

  6. Budget Analysis Projected Backlog of Work Projected Backlog of Work $200.0 C s Millions ity of Providence - Pavem $180.0 $160.0 Backlog Of Work $140.0 $120.0 ment Management $100.0 $8M/Year $10M/Year $13M/Year $80.0 $60.0 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Project Selection  System uses Cost/Benefit Calculation to Prioritize Projects C ity of Providence - Pavem  Factors Increasing Benefit  Traffic Volume  Lower Cost  Worse Condition (Lower PCI)  How Long the Repair Type is expected to last ment Management  Key Concepts  Repair roads before they fall into a more expensive “treatment band”  Fix the Roads used by the most people. 6

  7. Next Steps  Determine Funding Level C ity of Providence - Pavem  Utilize GIS to Coordinate Projects Geographically  Reduce Mobilization cost for contractors  “Neighborhood” Planning  Coordinate with Utility Companies ment Management  Perform Project Level Evaluations and Testing to determine actual repair for each candidate street. Questions & Answers VHB Pavement Engineering Services Gordon Daring, PE and Lance Baden 7