Potomac Yard Metrorail Station Environmental Impact Statement PYMIG Meeting October 10, 2012
Agenda 1. Welcome and Review of Project to Date 2. Results of Technical Reports completed to date a. Soils and Geologic Conditions b. Land Use c. Ecosystems & Endangered Species d. Water Resources e. Noise and Vibration f. Neighborhoods & Environmental Justice g. Hazardous and Contaminated Materials 3. Draft Capital Cost Ranges 4. Schedule 5. Next Steps �
Study Area Generally bounded by: � Route 1 on the west � George Washington Memorial Parkway and Potomac Greens Drive on the east � Slaters Lane on the south � Ronald Reagan National Airport Access Road on the north �
Process to Date �� ��������������������������������������������������������� ��������������� �� �������� �������!����������"�#��$�����������#�������������� ����������%��������������&���������%&� '� ��������������������������������#����%&��(������������� )� �#���������#�*����������$��(������������ +� �����$�����������,�������$-��������������#����%&�� ��������������� .� ����/��#��������%�������������$������0�������������� 1� ����/��#�)#2.#2��.������$$����������� 3� �����-�4�������-�4������������-�����5���$����������%������ %�����#������������*$$�$$��������6������ �
Build Alternatives �
Process to Date ������� �������� ���������� ��� ��������� ���� ��������� ��������� ������� ������ �������� ����� ������� ��������� ����!���������������������������"��"����� We are Here 2011- Mid/Late Mid/Late Early Early 2012 2013 2014 2012 2013 �
EIS Public Input and Decision Making Flowchart Draft Environmental Public Hearing and Record of EIS Scoping Impact Statement Final EIS Comment on DEIS Decision (DEIS) Review and Notice of Intent to Technical Analyses Publication Recommendation(s) conduct EIS of Draft EIS • Assessment of Potential from respective WMATA Board Environmental Consequences of Project Alternatives City Workgroups and Amendment of • Discussion of Potential Commissions Mass Transit Plan Mitigation Measures Scoping Scoping • Conceptual Design of Alternatives Identification of Identification of • Evaluation of Alternatives Alternatives and Issues Alternatives and Issues Selection of Selection of to Consider in EIS to Consider in EIS Preferred Alternative by Preliminary Cost Alexandria Estimates City Council City Council Public Agency Records of Public Review Review Agency Decision by Scoping Scoping Federal Transit Meeting Agency Coordination Publication Meeting Administration & Feb. 2011 of Final EIS • National Park Service National Park (GW Memorial Parkway) • Comments and Service • U.S. Army Corps of Responses From Draft Engineers (Wetlands) EIS • VA Dept. of Historic • Environmental Resources • Metropolitan Washington Consequences of Refinement of Refinement of Airports Authority (MWAA) Preferred Alternative Alternatives Alternatives • Other Federal, State and • Mitigation Commitments Local Agencies Public Hearing Determination of Begin Final Public Comments Compliance with Engineering Design Public Meeting Public Meeting (45-day Comment Period) Federal/State and Construction of Project Update Project Update Environmental Laws Preferred Alternative April 2012 Fall 2012 and Regulations 2011/Early 2012 Mid/Late 2012 Early 2013 Mid/Late 2013 2014 = Public Involvement Milestone = Agency Review � = City of Alexandria Review/Recommendation = City of Alexandria Decision = Agency Decision = Technical Task
Soils and Geologic Conditions Items Reviewed: • Soil • Geology • Ground Water • Topography �
������������ �������� – Soils and Geologic Conditions ��������� ������� ���������� ���� ������� ����� ����������� ������� ���� ���� ����� ������ ��!���� ��� ��� ��� ���� ���� $�#������%�������&������ "��������#��" ��� ��� ��� ���� ����������'���������'� )�����*� ���((���' ������������� "��������#��! ��� ��� ��� ������� �%������'�(����'����� �����������%����������'� )�����*� "��������#��+ ��� ��� ��� ������������ (������ ������������� Further investigation of the preferred alternative will be completed in association with the FEIS and prior to final design ,
����������������� ��������������� Land Use & Zoning Items Reviewed: • Land Use • Railroad Corridor • Public Parks/Open Space • Residential, Office, Retail, Hotel • Zoning consists of two CDD’s – • CDD10 (South Potomac Yard) • CDD19 (North Potomac Yard) -.
PRELIMINARY Impacts – Land Use ����������� �� ������ ���������� ������������ ��!������� ����� ��!���� ��� /��������� ��� ����������������� 12�"1 ����0�� ������������������3�"�)1 ������% ������������������1241���"1 "��������#��" )��������� /��������� 6���� ��7����� ������������������ 12�"1 5����#����� ����0�� �������������� 3���������������3�"�)1�%��� ������% 3++�-.�8� )���� ���12����� ,3++�-, 3���������������1241���"1 "��������#��! ������� /��������� ��� 3��������������� 12�"1 9��������8� ����0�� 3��������� �����3�"�)1 1��& ������% 3���������������1241���"1 "��������#��+ 3���������� /��������� 6�������7���� ������������ ����� 12�"1 +�#�������� ����0�� �������������� 3���������������3�"�)1�%��� ������% 3++-.�8� )���� ���12����� 3++-, 3���������������1241���"1 F – Landbay F NPYSAP – North Potomac Yard Small Area Plan -- CoA-MP – City of Alexandria Transportation Master Plan PY/PG SAP – Potomac Yard/Potomac Greens Small Area Plan
Ecosystems and Endangered Species Items Reviewed: •Ecosystems • Emergent wetlands • Riverine habitat • Forested Wetlands • Treed uplands •Endangered Species • Sensitive Joint-Vetch (Federally Threatened) • Bald Eagle (Federally Protected) • Appalachian Springsnail (State listed endangered) • Wood Turtle (State listed threatened) -�
Recommend
More recommend