Cassion Detail • • • Provided by Astorino Provided by Astorino
Floor Detail • • • • • Provided by Astorino
• • • • www.forum.skyscraperpage.com N Provided by Astorino www.forum.skyscraperpage.com
• • • • •
Initial Column Layout N
Tensacciai - Guide to PT Systems Tensacciai - Guide to PT Systems
Ground – 14 th Floor N • • • • 15 th Floor – 23 rd Floor • • • •
Ground – 14 th Floor N • • • • • Slab A Design Slab A Tendon Profile
Ground – 14 th Floor • • • • N
ADAPT-PT Model • • • • • •
RAM Model • • • •
Existing Layout N • • • • New Layout
ETABS Model • • • • • • • • •
• • • • • •
Existing Layout N • • • New Layout
• • •
• • • • • • •
Cost Comparison • Bare Costs O&P Costs Total • Steel $16,008,174 $3,610,772 $19,618,946 • Concrete $16,599,099 $5,062,030 $21,661,129 • • • •