pnc com forum skyscraperpage com pnc com forum
play

. www.pnc.com www.forum.skyscraperpage.com www.pnc.com - PowerPoint PPT Presentation

. www.pnc.com www.forum.skyscraperpage.com www.pnc.com www.forum.skyscraperpage.com N www.bing.com www.pnc.com www.pnc.com Cassion Detail Provided by


  1. . www.pnc.com www.forum.skyscraperpage.com

  2. www.pnc.com www.forum.skyscraperpage.com

  3. • • • • • • • • • N www.bing.com www.pnc.com

  4. • • • • • • www.pnc.com

  5. Cassion Detail • • • Provided by Astorino Provided by Astorino

  6. Floor Detail • • • • • Provided by Astorino

  7. • • • • www.forum.skyscraperpage.com N Provided by Astorino www.forum.skyscraperpage.com

  8. • • • • •

  9. Initial Column Layout N

  10. Tensacciai - Guide to PT Systems Tensacciai - Guide to PT Systems

  11. Ground – 14 th Floor N • • • • 15 th Floor – 23 rd Floor • • • •

  12. Ground – 14 th Floor N • • • • • Slab A Design Slab A Tendon Profile

  13. Ground – 14 th Floor • • • • N

  14. ADAPT-PT Model • • • • • •

  15. RAM Model • • • •

  16. Existing Layout N • • • • New Layout

  17. ETABS Model • • • • • • • • •

  18. • • • • • •

  19. Existing Layout N • • • New Layout

  20. • • •

  21. • • • • • • •

  22. Cost Comparison • Bare Costs O&P Costs Total • Steel $16,008,174 $3,610,772 $19,618,946 • Concrete $16,599,099 $5,062,030 $21,661,129 • • • •