peo perspective
play

PEO Perspective MR. SCOTT DAVIS Program Executive Officer Combat - PowerPoint PPT Presentation

UNCLASSIFIED Dist stri ributi bution on Statemen tement t A: Approved for public release: distribution is unlimited PEO Perspective MR. SCOTT DAVIS Program Executive Officer Combat Support & Combat Service Support 2016 UNCLASSIFIED


  1. UNCLASSIFIED Dist stri ributi bution on Statemen tement t A: Approved for public release: distribution is unlimited PEO Perspective MR. SCOTT DAVIS Program Executive Officer Combat Support & Combat Service Support 2016 UNCLASSIFIED

  2. Thoughts on Army Acquisition “ A cquisition” Requirements Resources Program Management Need Sustainment Informed by S&T S&T and Testi ting. Executed through Contrac acti ting ng. • “ a cquisition” • Army Acquisition Executive • 12 Program Executive Offices (PEOs) / subordinate program offices • Army Acquisition considerations: • Facing sustained uncertainty – Budget and Threats ats • Transitioning…to a leaner, more capable, more expeditionary force, while… • …investing in programs with the highest operational return and…building new only by exception. PEO CS&CSS – WPI Outreach Event 2 2016

  3. Army Investment Strategy • Autonomy-enabled capabilities S&T S&T • Water management & sourcing • Ground Mobility Vehicle New • Maneuver Support Vessel-Light Capab abilit ilitie ies • Power management & distribution • Family of Medium Tactical Vehicles A2 Increm ement ental al • Joint Precision Air Drop System (JPADS) Moder erniza ization tion • Battlefield Kitchen Rese set t and • TWVs: MRAPs, HMMWVs, etc. Sustai tainment ment • Tug Boats • TWVs: MRAPs, HMMWVs, etc. Dive vesti stitu ture • Landing Craft Mechanized-8 (LCM-8) • Armored Vehicle Launch Bridge (AVLB) “Currently, near -term capability gaps are mostly mitigated through incremental improvements to existing platforms and systems, while we make prudent investments in emerging and breakthrough technologies to address future gaps.” – LTG Michael Williamson PEO CS&CSS – WPI Outreach Event 3 2016

  4. Project Manager Joint Light Tactical Vehicle (JLTV) JLTV TV PEO CS&CSS – WPI Outreach Event 4 2016

  5. Project Manager Mine Resistant Ambush Protected (MRAP) Vehicles Assu sured d Mobi bili lity Systems stems MRA MRAP Vehic hicles es PEO CS&CSS – WPI Outreach Event 5 2016

  6. Project Manager Transportation Systems (TS) Light ght Tact ctica cal l Vehic hicles les Heav avy Tac actica cal l Vehic hicle les Medi dium Tac actica cal l Vehicl cles Army my Watercra tercraft ft Systems stems Allied d Tactical Vehic hicles es FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4 ACAT • Family of Medium Tactical Vehicles (A2) 1 ACAT • Ground Mobility Vehicle • Light Engineer Utility Trailer Potential RFP dates are for • Heavy Dump Truck • By-Wire Active Safety Kit planning purposes, subject to 3 • Maneuver Support Vessel (BWASK) for Palletized Load change, and not binding on the (Light) System truck government. PEO CS&CSS – WPI Outreach Event 6 2016

  7. Project Manager Expeditionary Energy & Sustainment Systems (E2S2) Mobi bile le Elec ectric tric Power er Systems stems Force ce Sustai stainmen ment Systems stems Batte tery Power er Systems Systems Small mall Expedi diti tiona nary Power er Source ces FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4 Potential RFP dates are for • Small Tactical Electric Power • Management and Distribution ACAT planning purposes, subject to • Advanced Medium Mobile Control change, and not binding on the 3 Power Sources • Ultra Lightweight Camouflage government. • Improved Environmental Net System Control Unit (9/18/36k) PEO CS&CSS – WPI Outreach Event 7 2016

  8. Project Manager Force Projection (FP) Bridgi dging Comba mbat Engi gine neer/ Materia terial l Handl ndling ng Equipmen ment Petrole leum & Water ter Systems stems Set ets, s, Kits, s, Outfi fits ts & T Tools ls App ppliqu qué & Large Unma manne nned d Ground nd System stems Test est, Meas asureme ment nt, & Diag agnosti nostic Equipme pment nt Unma manne nned d Ground nd Vehic hicle les FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4 • • • • Maintenance Support Device (V4) Rugged Common Robotic System - Maintenance Support Device (V4) TS-4558/U Optical Time Doman • TS-4549T Radio Test Set Individual Light Reflectometer ACAT 3 • TS-4544 Telecommunication System Test Set • Mobile Tactical Retail Refueling • Oscilloscope OS-305/U and OS-307/U System • TS-4548 Frequency Power Test Set • Load Handling System Compatible Potential RFP dates are for • ME-572 Ammeter Water Tank Rack System planning purposes, subject to • Route Clearance and Interrogation System change, and not binding on the • Man-Transportable Robotics System, government. Increment II PEO CS&CSS – WPI Outreach Event 8 2016

  9. Opportunities • Engage the Research and Development Community • Engage the Requirements Community • Engage Small Business Offices • TACOM: https://www.tacom.army.mil/sbo/index.html • Engage with Current / Prospective Prime Vendors • Participate in Industry Days, Conferences & Outreach Events • Monitor Federal Business Opportunities (www.fbo.gov) PEO CS&CSS – WPI Outreach Event 9 2016

  10. UNCLASSIFIED Dist stri ributi bution on Statemen tement t A: Approved for public release: distribution is unlimited Questions? http://www.peocscss.army.mil/ 2016 UNCLASSIFIED

Recommend


More recommend